Date
|
Hours
|
Work Log Summary

|
Details

|
06-07-2013
|
2.50
|
Wet sanded cowl and removed tape
|
Details
|
|
|
04-29-2013
|
1.50
|
Sanded and final epoxed the canopy fairing.
|
|
  |
|
04-28-2013
|
1.50
|
Sanded and added another coat of epoxy
|
Details
|
 |
|
04-28-2013
|
0.45
|
Drilled 3/8" hole in both gas struts
|
Details
|
  |
|
04-08-2013
|
0.25
|
Another coat on part of canopy
|
Details
|
 |
|
04-07-2013
|
1.00
|
Prepared canopy for another coat of black epoxy
|
Details
|
|
|
03-20-2013
|
1.50
|
Sanded canopy to prep for next epoxy coat
|
|
  |
|
02-24-2013
|
0.50
|
Drilled out and epoxyed right side fairing
|
Details
|
|
|
12-21-2012
|
2.50
|
Finalized canopy install
|
Details
|
|
|
12-20-2012
|
6.50
|
Completed Nose Wheel Fairing
|
Details
|
|
|
12-13-2012
|
2.00
|
Wet and dry sanded fairing - removed tape
|
Details
|
|
|
12-10-2012
|
1.50
|
Added epoxy coat to fairing
|
|
  |
|
12-09-2012
|
1.25
|
Filled canopy attach holes with epoxy/flox
|
Details
|
|
|
12-08-2012
|
4.50
|
Trimmed Canopy Fairing
|
Details
|
|
|
12-04-2012
|
1.00
|
Sanded and added another epoxy coat
|
|
  |
|
11-30-2012
|
1.50
|
Sanded and added another epoxy coat
|
|
  |
|
11-28-2012
|
1.50
|
Sanded then added epoxy layer to fairing
|
|
|
|
11-24-2012
|
2.50
|
Sanded fairing and added epoxy/micro balloon mixtu
|
Details
|
|
|
11-22-2012
|
0.25
|
Added more epoxy to aft edge of canopy
|
|
 |
|
11-21-2012
|
2.50
|
Sanded and added epoxy coat to fairing
|
|
|
|
11-11-2012
|
1.00
|
Sanded canopy fairing
|
|
  |
|
11-03-2012
|
3.50
|
Layup of top fairing
|
Details
|
|
|
10-29-2012
|
1.50
|
Light sanding of first stage of fairing layup
|
|
|
|
10-25-2012
|
1.00
|
Cut glass for side fairings
|
Details
|
|
|
10-24-2012
|
1.25
|
Final Fairing Surface Prep
|
Details
|
|
|
10-23-2012
|
1.50
|
Sanded fairing foam and taped template outline
|
Details
|
|
|
10-21-2012
|
1.25
|
Expoxy glued foam fillers to L/R canopy frame
|
|
|
|
10-21-2012
|
1.75
|
Cut glass strips and other canopy fairing prep
|
|
|
|
10-17-2012
|
1.25
|
Canopy foam prep and fitting
|
|
|
|
10-14-2012
|
1.25
|
Began work on canopy skirt
|
Details
|
  |
|
09-15-2012
|
1.50
|
Riveted canopy skirt to canopy
|
Details
|
|
|
09-15-2012
|
1.50
|
Installed D-Handle to canopy frame
|
Details
|
 |
|
09-15-2012
|
1.00
|
Added C-1214 Latch Block and trimmed it
|
Details
|
 |
|
09-14-2012
|
4.00
|
Attached canopy to frame
|
Details
|
|
|
09-08-2012
|
0.75
|
Attached guide blocks to roll bar
|
Details
|
|
|
09-06-2012
|
0.75
|
Fabricated two guide blocks for canopy frame
|
|
 |
|
09-05-2012
|
1.25
|
Fabricated L/R latch handles for canopy frame
|
|
|
|
09-03-2012
|
5.00
|
Completed Canopy Fitting
|
Details
|
|
|
09-02-2012
|
6.50
|
Fit canopy to frame
|
Details
|
|
|
09-01-2012
|
0.50
|
Placed canopy onto the canopy frame/fuselage
|
Details
|
|
|
09-01-2012
|
3.75
|
Installed canopy onto fuselage
|
Details
|
|
|
08-31-2012
|
2.00
|
Began working on canopy frame
|
Details
|
|
|
08-05-2012
|
2.50
|
Packed bearings and installed wheels
|
Details
|
|
|
08-03-2012
|
2.00
|
Worked on nose and main wheels
|
Details
|
|