Date
|
Hours
|
Work Log Summary

|
Details

|
02-10-1996
|
2.50
|
Prepared and bonded 3 oz glass to the sanded radiu
|
Details
|
  |
|
02-09-1996
|
1.25
|
Bonded micro to Vertical Stablizer and Rudder
|
Details
|
  |
|
02-08-1996
|
0.50
|
Sanded the Vertical Stabilizer and Rudder
|
Details
|
  |
|
02-07-1996
|
2.00
|
Drilled a hole and sanded the Vertical Stabilizer
|
Details
|
  |
|
12-05-1995
|
2.00
|
Checked the verticle stabilizer for twist
|
Details
|
  |
|
12-03-1995
|
1.00
|
Rebonded the front and top
|
Details
|
  |
|
12-02-1995
|
2.00
|
Fitted and bonded a new back spar to the VS
|
Details
|
  |
|
11-28-1995
|
1.00
|
Bonded a 4 inch tape down the back side of the fro
|
Details
|
  |
|
11-26-1995
|
1.00
|
Rebonded the front spar of the vertical stabilizer
|
Details
|
  |
|
11-25-1995
|
3.00
|
Found and Corrected the Verticle Stabilizer Twist
|
Details
|
  |
|
11-09-1995
|
2.00
|
Bonded Verticle Stabilizer to Fuselage
|
Details
|
  |
|
11-08-1995
|
3.50
|
Fitted and bonded the vertical stabilizer to the f
|
Details
|
  |
|
11-07-1995
|
3.00
|
Completed sanding a 3/4 inch deep channel
|
Details
|
  |
|
11-05-1995
|
6.00
|
Prepared and bonded the two halfs of the vertical
|
Details
|
  |
|
10-30-1995
|
2.50
|
Sanded and fitted vertical stabilizer
|
Details
|
  |
|
10-29-1995
|
3.50
|
Started construction of the verticle stabilizer
|
Details
|
  |