Date
|
Hours
|
Work Log Summary

|
Details

|
01-21-2011
|
39.00
|
Preparing Vertical Stabilizer spar
|
Details
|
|
|
05-16-2010
|
2.50
|
Drilling the Vertical Stabilizer
|
Details
|
|
|
11-08-2009
|
2.00
|
Primer touch up, final step for horizontal stablil
|
Details
|
|
|
11-05-2009
|
0.50
|
Fixing last rivet on tip rib
|
Details
|
|
|
10-30-2009
|
0.50
|
Horizontal Stabilizer Inspection
|
Details
|
 |
|
10-24-2009
|
6.00
|
Completing HS forward spar and rib riveting
|
Details
|
|
|
10-22-2009
|
0.75
|
Finish rivet of bottom side of port stabilizer
|
Details
|
|
|
10-21-2009
|
1.50
|
Riveting Skins to Front Spar and Ribs H. Stab
|
Details
|
|
|
10-17-2009
|
4.00
|
Attaching Forward Spar to Horizontal Stab
|
Details
|
|
|
10-16-2009
|
3.00
|
Riveting the HS-707 nose rib
|
Details
|
|
|
10-15-2009
|
2.00
|
Dressing internal skin scratches/Fitting nose rib
|
Details
|
|
|
09-06-2009
|
1.00
|
Attaching HS404/405 nose and main rib to front spa
|
Details
|
|
|
08-30-2009
|
3.00
|
Attaching HS-710/714 to HS-702 Front Spar
|
Details
|
|
|
08-13-2009
|
1.00
|
Front horizontal spar
|
Details
|
|
|
08-02-2009
|
20.00
|
Finished sanding and priming HS skeleton
|
Details
|
|
|
07-29-2009
|
1.50
|
Finish Riveting Rear Spar, Mount Bearings
|
Details
|
|
|
07-26-2009
|
7.00
|
Priming spars and starting to rivet
|
Details
|
|
|
07-21-2009
|
4.00
|
Dimpling Skins
|
Details
|
 |
|
07-19-2009
|
2.00
|
Dimpling spars and ribs
|
Details
|
 |
|
07-16-2009
|
3.50
|
Smoothing edges on skins and ribs
|
Details
|
|
|
07-11-2009
|
8.50
|
Finished Drilling Horiz. Stab. Section
|
Details
|
|
|
07-02-2009
|
0.50
|
Drilling out the HS405/710-714/702/403
|
Details
|
|
|
06-27-2009
|
2.50
|
HS-404 and 405 installation
|
Details
|
|
|
06-22-2009
|
1.50
|
Fitting the second 601 PP skin to the spar and rib
|
Details
|
|
|
06-21-2009
|
3.00
|
Fitting the 601PP skins
|
Details
|
|
|
06-16-2009
|
1.50
|
Drilling the Horizontal Stabilizer
|
Details
|
  |
|
06-14-2009
|
2.50
|
Prep Ribs
|
Details
|
|
|
06-06-2009
|
2.00
|
Finishing front spar assembly
|
Details
|
|
|
05-30-2009
|
1.00
|
Trimming HS-702 flange and making notch relief
|
Details
|
|
|
05-27-2009
|
1.45
|
HS-702 marking bend lines and trim area
|
Details
|
|
|
05-26-2009
|
1.00
|
Bending HS710/714 to 6 degree angle
|
Details
|
|
|
05-25-2009
|
5.50
|
HS-710/714 trimming ends
|
Details
|
 |
|
05-23-2009
|
0.50
|
Front Spar Assembly - Drill HS-702/710/714
|
Details
|
  |
|
05-20-2009
|
1.00
|
Rivet VA-146 bearing
|
Details
|
|
|
05-19-2009
|
1.00
|
VA-146 bearing, primed with Mar-hyde
|
Details
|
|
|
05-08-2009
|
1.00
|
Waiting for the primer, deburring edges
|
Details
|
  |
|
05-07-2009
|
3.00
|
Elevator attach brackets and HS 411 / VA-146 Beari
|
Details
|
  |
|
04-15-2009
|
1.00
|
Finished drilling all holes in HS609 / 603
|
Details
|
 |
|
04-09-2009
|
3.50
|
Smoothing HS-609 PP to a satin like finish
|
Details
|
|
|
04-05-2009
|
1.00
|
Trimming HS-609PP
|
Details
|
 |
|
04-04-2009
|
7.00
|
Removing the blue protective plastic
|
Details
|
 |
|
04-02-2009
|
3.50
|
Empennage Inventory
|
Details
|
|