Powered By Kitlog Pro v2.0
John (Jack) Clark's Web Site
RV-14A
Fuselage
Work Logs Found:
55
Category Work Time:
136 Hours
Date
Hours
Work Log Summary
Details
09-01-2025
6.00
Completed the Firewall Assembly
Details
08-29-2025
2.00
Applied Proseal Bead to the F-01401A Top Firewall
Details
08-19-2025
1.50
Dimpled F-01401A Firewall Top
Details
08-18-2025
4.00
Riveted the F-01401 F/G/H/K to Firewall
Details
08-17-2025
2.00
Finished Riveting the Bottom Skin to Baggage Ribs
Details
08-15-2025
4.50
Dimpled the Firewall Sides
Details
08-14-2025
2.00
Riveted the L&R Tunnel Side Assemblies
Details
08-13-2025
2.00
Countersunk F-01401E L&R
Details
08-10-2025
3.00
Cleaned/Primed the Firewall Construction Parts
Details
08-08-2025
1.00
Gathered Parts for the Firewall Construction
Details
08-05-2025
0.00
Off-set Back Riveter Snapped in Two
Details
08-04-2025
2.00
Stood the Fuselage Assembly Up on End
Details
08-03-2025
1.50
Riveted the F-01426 L&R Baggage Ribs
Details
08-01-2025
3.00
Riveted F-01427 L&R Baggage Ribs to F-01405
Details
07-31-2025
2.00
Riveted the L&R Step Attachment Assemblies
Details
07-30-2025
4.50
Fabricatd the F-01495 L&R Step Attachment Ribs
Details
07-29-2025
2.00
Riveted F-14145 Step Attachment Angles
Details
07-14-2025
1.50
Finished Riveting Removed Rivets from Bottom Skin
Details
07-10-2025
4.50
Removed Bad Rivets from Ribs to Bottom Skin
Details
07-09-2025
2.00
Riveted Ribs to F-01484 Bottom Skin
Details
07-07-2025
2.00
Put Rivets in F-01484 Bottom Skin
Details
07-03-2025
3.00
Clecoed F-01404 and F-01405 to Bottom Skin
Details
07-02-2025
5.00
Riveted the Aft Gear Brace Assembly together
Details
07-02-2025
0.00
Riveted the Aft Gear Brace Assembly to F-01484
Details
07-01-2025
2.00
Tried Squeezing the Rivets of the F-01443 Doublers
Details
07-01-2025
2.00
Creeated Aft Gear Brace Assembly
Details
06-30-2025
3.50
Dimpled the F-01484 Center Bottom Skin
Details
06-29-2025
2.00
Cleaned/Primed the F-01484 Center Bottom Skin
Details
06-28-2025
1.50
Countersunk the F-01443 Doublers
Details
06-27-2025
3.50
Assembled the Idler Bracket Assembly
Details
06-26-2025
4.00
Separated the F-01480 Seat Belt Lugs
Details
06-25-2025
4.00
Cleaned and Primed a bunch of parts
Details
06-24-2025
3.00
Bolted & Riveted Seat Ribs to F-01404
Details
06-23-2025
2.50
Installed the Second Crotch Strap Bracket
Details
06-22-2025
1.00
Cleaned and Primed the f-14110 L&R Crotch Strap
Details
06-21-2025
1.50
Cleaned and Primed F-01415 L&R Ribs
Details
06-20-2025
1.00
Installed the Right Bearing Bracket Brace Assembly
Details
06-08-2025
4.50
Riveted the F-14142 Clips to the F-01417/16 Ribs
Details
06-08-2025
0.00
Riveted the F-14142 Clips to the F-01417/16 Ribs
Details
06-07-2025
4.50
Riveted Doublers to the F-01423B L&R Ribs
Details
06-04-2025
4.00
Bolted/Riveted F-01403D L&R to F-01403
Details
06-03-2025
5.00
Riveted the Side Angles to the Aft Center Section
Details
06-02-2025
3.00
Fabricated the Bearing Bracket Assemblies
Details
06-01-2025
3.50
Cleaned and Primed Mid Fuselage Lower Structure Pa
Details
05-31-2025
5.50
Cleaned/Primed F-01403 Forward Center Section Part
Details
05-30-2025
3.00
Fabricated the F-01405-B Parts x2
Details
05-29-2025
1.50
Fixed Left F-01405M, It needed to be Flipped Over
Details
05-28-2025
1.50
Rivwted F-01405C/F-01405D L&R/F-01405A
Details
05-23-2025
1.00
Collected Parts for the Forward Fuselage
Details
03-26-2025
6.50
Prepped F-01411/F-0140/F-01410/F-01407/F-01408
Details
10-13-2023
0.00
Fuselage Inventory Finished
Details
10-12-2023
0.00
Fuselage Inventory continues
Details
10-11-2023
0.00
Fuselage Inventory continues
Details
10-10-2023
0.00
Fuselage Inventory
Details
10-06-2023
0.00
Uncrated Fuselage Kit
Details
SITE NAVIGATION
Contact Builder
RV-14A Home
Category
# Logs
# Hours
All
634
4694
Aircraft Related
229
1432
Avionics
1
406
Empennage
109
438
Fuselage
55
948
Lighting
1
27
Miscellaneous
4
5
None
6
6
Wings
229
1432
RV-8A Home
Copyright © 2001-2025 Matronics. All Rights Reserved.