Powered By Kitlog Pro v2.0
GIORGIO'S WEB SITE
CH650
Engine
Work Logs Found:
22
Category Work Time:
87 Hours
Date
Hours
Work Log Summary
Details
06-27-2025
3.00
Installed diode on Starter
Details
06-20-2025
4.00
Started engine; installed flaps
Details
06-18-2025
3.50
Tested fuel flow
Details
06-11-2025
4.00
Installed propeller, bled brakes
Details
06-09-2025
3.00
Several small tasks
Details
06-06-2025
4.00
Trimmed and clecoed engine rubber baffles
Details
06-04-2025
3.50
Installed front baffles+ Muffler hole
Details
06-02-2025
4.50
Finished installing cowling nutplates
Details
05-30-2025
3.50
Connected CH nd EGT left side
Details
05-27-2025
3.00
Wired RH sie EGT and CHT probes
Details
05-20-2025
5.50
nstalled EGT probes and cowling nutplates
Details
05-19-2025
3.25
Installed CHT probes
Details
05-16-2025
4.00
Cut and installed oil dipstick access door
Details
05-14-2025
5.00
Fitted upper and lower cowlings
Details
05-12-2025
3.50
Installed prop hub+ trimmed engine cowls
Details
05-09-2025
4.00
made Ignition cables
Details
05-07-2025
5.00
Trimmed and installed Air Boxes for baffling
Details
05-05-2025
5.00
Installed oil cooler and throttle
Details
05-02-2025
4.00
Installed voltage Regulator
Details
04-30-2025
4.00
Conncted engin to ECU
Details
04-28-2025
4.50
Installed engine
Details
03-28-2025
3.00
installed fuel pumps and pre-filters
Details
SITE NAVIGATION
Contact Builder
RV14A Home
CH650 Home
Category
# Logs
# Hours
All
212
1103
Avionics
22
106
Canopy
17
76
Empennage
11
282
Engine
22
87
Fuselage
84
328
Miscellaneous
3
6
Wings
53
218
Copyright © 2001-2026 Matronics. All Rights Reserved.