KitLog pro

Powered By Kitlog Pro v2.0

GIORGIO'S WEB SITE
Work Logs Found: 84
Category Work Time: 324 Hours
 Date
Hours
Work Log Summary

Details

 10-03-2025
3.00
Added oil cooler baffles
Details
       

 09-22-2025
2.50
Lot of small jobs
Details

 09-19-2025
2.50
Reinstalled arm rest after covering it with Vynil
Details
       

 09-15-2025
3.50
Installed seat belts + control cables tensioned
Details
       

 09-08-2025
3.00
Finished sides of canopy seal; installed bttom doo
Details
       

 09-08-2025
3.00
Check List
Details

 09-05-2025
5.00
glud canopy weatherstripping+ step fairing
Details
       

 07-13-2025
3.00
Replaced nutplates + installed canopy frame
Details
       

 07-09-2025
4.00
riveted baggage bloor
Details
       

 07-04-2025
3.00
Installed GPS antennas on forward skin
Details
       

 06-30-2025
3.00
Installed pitch servo wire +misc
Details
       

 04-23-2025
4.50
Installed seats
Details
       

 03-03-2025
4.00
Installed NACA scoops
Details
       

 02-28-2025
3.25
Fabricated and installed supports for angle uel fi
Details
       

 02-26-2025
4.00
Installed dder cables
Details
       

 02-21-2025
2.25
installed upper limits elevator
Details
       

 02-17-2025
4.50
Installed horizontal stabilizer
Details
       

 02-10-2025
3.00
Installed steering rods
Details
       

 02-07-2025
2.75
eliminated play in control yoke
Details

 01-30-2025
4.00
riveted flap torque tube supports
Details
       

 01-13-2025
2.50
enlarged slots for rear spar
Details
       

 12-22-2024
2.00
Drilled and clecoed new rear frame channel
Details
       

 10-02-2024
4.00
installed flap motor
Details
       

 09-30-2024
5.00
installed nutplates for center console sides
Details
       

 09-18-2024
3.50
Installed both center cosole forward covers
       

 09-16-2024
4.50
Installed fuel selector
Details
       

 09-13-2024
6.00
Installed dual yokes and throttle
Details
       

 09-11-2024
4.00
clecoed center console
Details
       

 08-12-2024
4.00
installed rudder fairing + top rudder hinge
Details
       

 08-09-2024
4.00
trimmed top skin and saddle
Details
       

 08-08-2024
3.00
installed Horizontal stabilizer
Details
       

 07-05-2024
3.00
installed engine mount
Details
       

 07-03-2024
4.00
installed mn gear
Details
       

 07-01-2024
3.50
installed tirs
Details
       

 06-28-2024
4.00
started main gear
Details
       

 06-26-2024
3.50
installed nose gear
Details
       

 06-24-2024
3.50
drilled and installed nose gear fork to nose gear
Details
       

 06-23-2024
4.50
installed canopy lock handle and torque tue
Details
       

 06-21-2024
3.00
upper engine mounts final drilling
Details
       

 06-20-2024
4.00
riveted forwar fuselage
Details
       

 06-19-2024
4.50
cleco fuselage skins back in place
Details
       

 06-17-2024
4.00
installed flaps supports; riveted back fuselage to
Details
       

 06-16-2024
5.00
various small tasks
Details
       

 06-13-2024
4.50
Deburred and riveted
Details
       

 06-11-2024
4.00
riveted forard bottom fuselage
Details
       

 06-08-2024
4.00
deburring+ start riveting bottom
Details
       

 06-06-2024
4.50
took fuselage apart for deburring
Details

 06-04-2024
4.00
installeduprights doublers
Details
       

 05-31-2024
4.00
installed rear top skin
Details
       

 05-29-2024
3.50
installed forward longeon doublers
Details
       

 05-27-2024
4.50
seat bottom, seat belt attachment
Details
       

 05-25-2024
4.50
installed arm rest supports
Details
       

 05-21-2024
4.50
finshed seat bottoms
       

 05-16-2024
4.50
added Z angles+ LH seaat
Details
       

 05-14-2024
4.50
Forward skins and L angle
Details
       

 05-13-2024
3.50
installed canopy torque tube supports
Details
       

 05-10-2024
4.00
finished aft torque tube support
Details
       

 05-08-2024
4.00
finished seat back and flap motor mount
Details
       

 05-07-2024
4.00
started seat back
Details
       

 05-04-2024
4.50
sized baggage compartment floor
Details
       

 05-02-2024
4.00
Aft spar uprights
Details
       

 04-29-2024
4.00
installed baggage compartment bulkhead
Details
       

 04-26-2024
4.00
installed spar uprights
       

 04-23-2024
4.00
added gear uprights and gussets
Details
       

 04-22-2024
4.00
installed 2 forward sking and gear braccket
Details
       

 04-19-2024
3.00
drilled gear supports+ positioned RH skin
Details
       

 04-16-2024
4.50
added backseat, instrument panel
Details
       

 04-15-2024
3.50
installed firewall and upper longerons
Details
       

 04-11-2024
4.00
Added pedals
Details
       

 04-09-2024
5.00
Riveted Firewall and started floor
Details
       

 04-08-2024
5.00
Firewall assembly
Details
       

 04-05-2024
3.00
installed reachannelc+ made upperrudder bearing
Details
       

 04-02-2024
3.50
prepared gear chanl and lower backseat
Details
       

 04-01-2024
3.00
installed inspection panel +riveting
Details
       

 03-30-2024
5.00
installed rudder cable fairing
Details
       

 03-28-2024
3.00
finished aft section
Details
       

 03-25-2024
4.00
installed rear parts over HT frames
Details
       

 03-23-2024
5.00
Leftfuselage side
Details
       

 03-21-2024
4.50
Attached right side to bottom fuselage
Details
       

 03-19-2024
4.50
Made bottom door + L angles
Details
       

 03-15-2024
4.50
Riveted bottom fuselage
Details
       

 03-14-2024
4.00
installed lower rudder hinge
Details
       

 03-12-2024
4.00
Installed lower longerons
Details
       

 03-09-2024
3.50
started bottm fuselage
Details
       










Copyright © 2001-2026 Matronics. All Rights Reserved.