Powered By Kitlog Pro v2.0
Brad's CH 601XLB
Zodiac CH 601 XLB
Instrument Panel
Work Logs Found:
21
Category Work Time:
34 Hours
Date
Hours
Work Log Summary
Details
01-13-2026
1.25
Install Vacuum/Boost Gauge.
Details
01-10-2026
1.50
Install Vacuum/Boost Gauge.
Details
05-13-2024
2.00
Fix Low Battery Indicator Circuit Board
Details
05-09-2024
3.00
Repair Low Battery Indicator
Details
05-08-2024
2.00
Install Fuel Pressure Gauge
Details
05-01-2024
2.00
Work on wiring
Details
04-30-2024
3.00
Work on wiring. Move or remove some gauges.
Details
04-17-2024
2.00
Remount Low Battery indicator to fix it.
Details
04-16-2024
1.00
Test fit Instrument Panel cover
Details
04-15-2024
2.00
Install potentiometer and LED control for panel
Details
04-09-2024
5.00
Install potentiometer and LED control for panel
Details
04-06-2024
1.00
Install potentiometer for panel lighting
Details
04-04-2024
2.00
Install potentiometer for panel lighting
Details
04-03-2024
2.00
Test fit Instrument Panel cover
Details
03-04-2024
2.00
Work on instrument wiring
Details
08-02-2023
2.00
Install flexible grommets
Details
08-24-2009
0.00
Panel
06-21-2009
0.00
BNC Cable
11-18-2008
0.00
Panel
09-10-2008
0.00
Instrument panel
09-07-2008
0.00
Instrument panel
SITE NAVIGATION
Contact Builder
Zodiac CH 601 XLB Home
Category
# Logs
# Hours
All
589
1004
Avionics
1
2
Empennage
7
18
Engine
54
61
Firewall Forward
72
120
Fuselage
112
141
Instrument Panel
21
34
Insturment Panel
21
34
Interior
42
50
Miscellaneous
4
7
Prop
16
26
Systems
181
395
Welding
2
Wings
56
116
Copyright © 2001-2026 Matronics. All Rights Reserved.