Adams RV-7A Build
Work Logs Found: 10
Category Work Time: 63 Hours
 Date
Hours
Work Log Summary

Details

 08-25-2025
4.50
Brakes, Vinyls, Wiring
Details

 08-20-2025
7.25
Interior panels and final interior covers
Details
       

 08-19-2025
3.00
Interior
Details
       

 03-20-2025
6.00
Finish Tunnel, Wiring Tailcone, Seat Belt fitting
Details

 03-19-2025
7.00
Fuel Pump, Aileron Bellcranks, Pitot tube
Details
       

 03-18-2025
7.00
Adjust Control stick, New Fuel line, Tunnel closin
Details
       

 03-13-2025
7.00
Tail Final Assembly
Details

 03-12-2025
7.00
Tail Final Assembly
Details
       

 03-11-2025
7.00
Assembly Landing Gear and H-Stabilizer
Details
       

 12-17-2024
7.00
Cowl, Elevators and Front Landing gear finishing
Details