Date
|
Hours
|
Work Log Summary

|
Details

|
04-29-2020
|
8.00
|
Installing cabin top
|
Details
|
|
|
04-25-2019
|
8.00
|
Step installation
|
Details
|
|
|
04-20-2019
|
10.00
|
Baggage bulkhead corrugation
|
Details
|
 |
|
04-18-2019
|
3.00
|
Riveting Lower and uppper baggage door seal
|
Details
|
  |
|
04-12-2019
|
4.00
|
|
Details
|
  |
|
04-03-2019
|
4.00
|
Baggage and seat floors
|
Details
|
  |
|
03-29-2019
|
4.00
|
Lower baggage door seal
|
Details
|
|
|
03-28-2019
|
2.00
|
Clecoing baggage floors
|
Details
|
 |
|
03-05-2019
|
12.00
|
Riveting the tail cone and fuselage
|
Details
|
|
|
03-01-2019
|
8.00
|
Tail cone attachment continued
|
Details
|
  |
|
02-28-2019
|
8.00
|
Began attaching tail cone
|
Details
|
|
|
02-25-2019
|
4.00
|
Running conduit under baggage and rear seats
|
Details
|
 |
|
02-18-2019
|
8.00
|
Rear seats floor pan install
|
Details
|
|
|
02-15-2019
|
2.00
|
Fuel valve installation
|
Details
|
|
|
02-02-2019
|
2.00
|
Installed parking brake
|
Details
|
|
|
01-20-2019
|
3.00
|
Fabing brake lines
|
Details
|
|
|
01-19-2019
|
2.00
|
Repair of brake exilt line hole in LG mount
|
Details
|
|
|
01-19-2019
|
0.50
|
Installing brake lines
|
Details
|
 |
|
01-18-2019
|
3.00
|
Sound insulation install
|
Details
|
|
|
12-30-2018
|
5.00
|
Cont fab of access panels for center tunnel.
|
Details
|
|
|
12-29-2018
|
5.00
|
Fabrication of access panels for center tunnel
|
Details
|
 |
|
12-26-2018
|
3.00
|
AirWard tunnel panel fabrication
|
Details
|
 |
|
12-26-2018
|
3.00
|
AirWard tunnel access panel fabrication
|
Details
|
 |
|
12-25-2018
|
3.00
|
Access panel installation
|
Details
|
|
|
12-12-2018
|
3.00
|
Cabin floor panel installation
|