Date
|
Hours
|
Work Log Summary

|
Details

|
12-13-2018
|
3.00
|
purchase order gascolator and misc fuel parts
|
|
  |
|
12-13-2018
|
4.00
|
Flap motor 2.0 rapid prototype mount & adapter
|
|
  |
|
12-12-2018
|
1.00
|
Wingtip clear lense clay mockup
|
|
  |
|
12-12-2018
|
2.00
|
Flap motor 2.0 wiring mockup
|
|
  |
|
12-10-2018
|
3.00
|
Wingtip lights prep for mold
|
|
  |
|
12-10-2018
|
4.00
|
6BID Mold layup - Wingtip lights
|
|
  |
|
12-05-2018
|
4.00
|
Shopping AN Fittings for fuel system
|
|
  |
|
12-03-2018
|
2.00
|
Pull tubing and bulkhead for adjustable cables
|
|
  |
|
11-30-2018
|
1.00
|
Shop flap motor 2.0
|
|
  |
|
11-29-2018
|
1.50
|
Pulling baggage door kit parts
|
|
  |
|
11-29-2018
|
2.00
|
Flap motor CFD testing
|
|
  |
|
11-28-2018
|
1.00
|
Shop LED strip lights for wingtips
|
|
  |
|
11-25-2018
|
1.00
|
Baggage door layup schedule
|
|
  |
|
11-25-2018
|
1.00
|
Adjustable pedal schematic
|
|
  |
|
11-15-2018
|
3.00
|
Esco strut cam finish machining
|
|
  |
|
11-14-2018
|
8.00
|
4 axis CNC program, setup, and machining Esco stru
|
|
  |
|
11-13-2018
|
2.00
|
Light bar CAD drawings
|
|
  |
|
11-13-2018
|
4.00
|
Flap Clevis drill and rivet, water jet control arm
|
|
  |
|
11-13-2018
|
6.00
|
Flap anchor design and machining
|
|
  |
|
11-12-2018
|
6.00
|
Flap clevis CAD design and machining
|
|
  |
|
11-11-2018
|
2.00
|
Flap servo connection hardware design
|
|
  |
|
11-09-2018
|
1.00
|
shop Led tape lights and rotary pot flap controls
|
|
  |
|
11-05-2018
|
4.00
|
Left horizontal root fairing clay mold and 4 BID
|
|
  |
|
11-02-2018
|
4.00
|
Right horizontal root fairing clay mold and 4BID
|
|
  |
|
10-31-2018
|
4.00
|
Rightwingtip part layup 4BID
|
|
  |
|
10-30-2018
|
5.00
|
CAM, CNC cut right wingtip pattern
|
|
  |
|
10-29-2018
|
3.00
|
Shop fuel systems, seat cushions, piston set order
|
|
  |
|
10-27-2018
|
0.50
|
Wingtip demold and deburr
|
|
  |
|
10-26-2018
|
4.00
|
Wingtip 4 BID layup
|
|
  |
|
10-23-2018
|
0.50
|
Shop Panel switches and switch covers
|
|
  |
|
10-22-2018
|
0.50
|
Shop Flap servo and controller
|
|
  |
|
10-22-2018
|
1.00
|
Concept panel and center console
|
|
  |
|
10-22-2018
|
1.00
|
Concept avionics layout, ebrakes, digital switch p
|
|
  |
|
10-20-2018
|
1.00
|
3D modeling centerconsole
|
Details
|
  |
|
10-18-2018
|
6.50
|
CNC cut new wingtip design
|
|
  |
|
10-17-2018
|
2.00
|
Sanding and micro wingtip molds
|
|
  |
|
10-17-2018
|
4.00
|
New wingtip design CAD and CAM
|
|
  |
|
10-16-2018
|
5.00
|
CNC machine wingtip bottom and bottom tip
|
|
  |
|
10-15-2018
|
6.00
|
CNC program and machine wingtip bottom
|
|
  |
|
10-13-2018
|
4.00
|
CNC 3d surface wingtip top
|
|
  |
|
10-12-2018
|
8.00
|
CNC Machine programming
|
|
  |
|
10-11-2018
|
4.00
|
Cnc machine cleaning and setup
|
|
  |
|
10-10-2018
|
8.00
|
Wingtip mold design and NC programming
|
|
|
|
10-09-2018
|
3.00
|
Wingtip mold design and prep
|
|
  |
|
09-27-2018
|
4.00
|
nose tunnel flox and 3 BID
|
|
  |
|
09-27-2018
|
6.00
|
CFD testing winglet
|
|
  |
|
09-27-2018
|
1.00
|
3D scan baggage window legacy
|
|
  |
|
09-26-2018
|
2.00
|
Post-cure nose tunnel
|
|
  |
|
09-25-2018
|
4.00
|
Wingtip design solidworks
|
|
  |
|
09-25-2018
|
4.50
|
Nose tunnel 6 BID (second attempt)
|
|
  |
|
09-21-2018
|
3.00
|
Wingtips Soliworks
|
|
  |
|
09-20-2018
|
6.00
|
Nose tunnel extend 6 BID
|
|
  |
|
09-17-2018
|
4.00
|
Electric retract system design
|
|
  |
|
09-13-2018
|
3.00
|
Separation of unneeded items, cleaning
|
|
  |
|
09-13-2018
|
6.00
|
CNC machining spinner backplate
|
|
  |
|
09-12-2018
|
3.00
|
Hydraulic piston sourcing
|
|
  |
|
09-11-2018
|
2.00
|
Hydraulic pump mount 6 Bid and vacuum
|
|
  |
|
09-11-2018
|
1.00
|
hydralic fittings and pump
|
|
  |
|
09-11-2018
|
1.00
|
Fuel and hydralic parts search
|
|
  |