Date
|
Hours
|
Work Log Summary

|
Details

|
12-05-2018
|
2.00
|
Flox install cable connectors baggage bulkhead 2x
|
|
  |
|
12-04-2018
|
3.00
|
Prep, sand, flox install rear cable bulkhead
|
|
  |
|
12-04-2018
|
1.00
|
Flox install cable connectors 2x
|
|
  |
|
11-06-2018
|
4.50
|
4BID surround on nose gear tunnel
|
|
  |
|
09-11-2018
|
2.00
|
Center wing fuel lines - final mount and torque
|
|
  |
|
09-10-2018
|
5.00
|
Fuel lines and fittings wing connection
|
|
  |
|
09-10-2018
|
3.00
|
Fuel line fabrication
|
|
  |
|
09-05-2018
|
0.50
|
Sand upper gear fairings
|
|
  |
|
09-05-2018
|
2.50
|
Fuel selector valve with mount ready for install
|
|
  |
|
09-05-2018
|
1.00
|
finish sand & Reinstall wheel fairings
|
|
  |
|
09-04-2018
|
0.50
|
Sand wheel fairings
|
|
  |
|
08-31-2018
|
2.00
|
sand and micro wheel fairings
|
|
  |
|
08-31-2018
|
1.50
|
Micro upper right fairing
|
|
  |
|
08-31-2018
|
2.00
|
Bond upper right main gear fairing
|
|
  |
|
08-30-2018
|
3.00
|
Remove hinge from gear fairing, prep for fairing b
|
|
|
|
08-30-2018
|
4.00
|
prep and install upper left fairing, bond right la
|
|
|
|
08-30-2018
|
1.00
|
Inspection panel nutplates 4x
|
|
  |
|
08-29-2018
|
4.00
|
Landing gear fairing prep
|
|
|
|
08-29-2018
|
2.00
|
Aileron servo fairing install
|
|
  |
|
08-28-2018
|
6.00
|
Landing gear install
|
|
|
|
08-23-2018
|
5.00
|
CAD design tail dragger leg mounts and source part
|
|
  |
|
08-22-2018
|
2.00
|
Surface finish and trim wheel tunnel areas
|
|
  |
|
08-22-2018
|
3.50
|
Demolish/remove nose wheel tunnel
|
|
  |