Date
|
Hours
|
Work Log Summary

|
Details

|
10-29-2010
|
0.20
|
Advice from other builders
|
Details
|
  |
|
10-06-2010
|
8.00
|
finishing the brake lines.
|
Details
|
|
|
10-03-2010
|
10.00
|
Install rudder pedals, brake cylinders, steel tubi
|
Details
|
|
|
09-07-2010
|
0.50
|
Pilot and passenger seats
|
Details
|
 |
|
09-07-2010
|
2.10
|
Finishing installation of aft window.
|
Details
|
  |
|
09-06-2010
|
3.20
|
continuing attaching aft window
|
Details
|
  |
|
09-05-2010
|
5.30
|
Aft Window
|
Details
|
  |
|
09-03-2010
|
2.80
|
Riveting
|
Details
|
  |
|
08-30-2010
|
0.40
|
Plastic back window
|
Details
|
 |
|
08-29-2010
|
53.00
|
Lots of Rivets
|
Details
|
 |
|
08-27-2010
|
34.00
|
Continuation of melding empennage to fuselage
|
Details
|
 |
|
08-26-2010
|
3.00
|
joining tailcone and fuselage' snap bushings"
|
Details
|
|
|
08-24-2010
|
0.20
|
Bend Tabs
|
Details
|
  |
|
08-23-2010
|
4.00
|
Remove empennage assemblies from Tailcone
|
Details
|
  |
|
08-22-2010
|
35.00
|
Finishing section 24. Dissappointment at 25.
|
Details
|
  |
|
08-20-2010
|
2.00
|
attaching nut plates to bulkheads and Channels
|
Details
|
 |
|
08-18-2010
|
4.00
|
Redo of roll bar. Match drill Shear Clips
|
Details
|
  |
|
08-17-2010
|
5.00
|
Odds and Ends
|
Details
|
  |
|
07-24-2010
|
1.20
|
Riveted nutplates to tailcone
|
Details
|
  |
|
07-23-2010
|
2.00
|
Nutplates clecoed to the tailcone assembly
|
Details
|
  |
|
07-21-2010
|
3.00
|
Preparing the attatchments of the tail cone to the
|
Details
|
  |
|
07-12-2010
|
1.50
|
Continuing with fairing after attaching Stabilator
|
Details
|
|
|
07-08-2010
|
3.00
|
Working with the tail cone fairing.
|
Details
|
  |
|
07-04-2010
|
3.00
|
Re-attaching the stabilator to the tail cone
|
Details
|
  |
|
06-17-2010
|
5.00
|
Tail cone fairing continued...
|
Details
|
  |
|
06-15-2010
|
5.00
|
More tail cone fairing
|
Details
|
  |
|
06-12-2010
|
3.00
|
Tail cone fairing fabrication
|
Details
|
|
|
05-25-2010
|
2.50
|
Fabrication of tailcone fairing
|
Details
|
  |
|
05-10-2010
|
3.00
|
V-Stab Fairing match drilled and clecoed
|
Details
|
  |
|
05-07-2010
|
2.50
|
Fitting the V-Stab close to the aft part of the ru
|
Details
|
  |
|
05-05-2010
|
2.00
|
removing extraneous polyester from rudder tip fari
|
Details
|
  |
|
05-03-2010
|
2.50
|
Continuing torture of removing assemblies
|
|
  |
|
04-30-2010
|
3.00
|
Masking,3/4 drilling of fiberglass tail cone fair
|
Details
|
|
|
04-29-2010
|
1.00
|
Re attaching the V-stab to the tailcone
|
Details
|
  |
|
04-28-2010
|
2.00
|
fitting fairings for V-stab and Rudder
|
Details
|
  |
|
04-23-2010
|
2.00
|
Working with fiberglass
|
Details
|
  |
|
04-19-2010
|
4.00
|
Re do and Re-re do
|
Details
|
  |
|
04-17-2010
|
4.00
|
Screwing skins and tightening bolts
|
Details
|
  |
|
04-07-2010
|
2.00
|
Testing the AST Assembly Travel
|
Details
|
  |
|
04-03-2010
|
4.00
|
Trim/Servo Assembly Installation
|
Details
|
|
|
03-22-2010
|
3.00
|
Comparing parts with packing list
|
Details
|
|
|
03-20-2010
|
1.00
|
Parts fabrication
|
Details
|
  |
|
03-20-2010
|
1.00
|
Deburring, placing and sanding gromets
|
Details
|
  |
|
03-18-2010
|
4.00
|
Stabilator Counterbalance and Attachment
|
Details
|
  |
|
03-18-2010
|
1.50
|
Anti-servo assembly attached and wired
|
Details
|
  |
|
03-15-2010
|
4.00
|
Installation of V-Stab and Rudder.
|
Details
|
  |
|
03-15-2010
|
0.00
|
Fun with the computer
|
Details
|
  |
|
12-10-2009
|
6.00
|
Riveting continues
|
Details
|
  |
|
12-04-2009
|
2.00
|
Rivets, rivets, everywhere and Coleridge not aroun
|
Details
|
  |
|
12-03-2009
|
6.50
|
Clecoing and Riveting skins
|
Details
|
|
|
11-30-2009
|
3.00
|
placing, clecoing, riveting; 1279, and 1280 skins
|
Details
|
  |
|
11-29-2009
|
1.00
|
Using a Cushion Clamp to route the WH-P30
|
Details
|
 |
|
11-20-2009
|
2.00
|
Chaffing resolution
|
Details
|
  |
|
11-16-2009
|
2.30
|
The Static Air System
|
Details
|
|
|
11-13-2009
|
3.00
|
wiring and stringing
|
Details
|
|
|
11-11-2009
|
2.00
|
Pneumatic Riveting
|
Details
|
  |
|
11-11-2009
|
3.50
|
Frames (like scrawning bulkheads) & Skins
|
Details
|
 |
|
11-09-2009
|
3.00
|
Stabilator Hinge Washers assembly
|
Details
|
  |
|
11-05-2009
|
4.60
|
Finishing the F-1211 Assembly
|
Details
|
  |
|
11-03-2009
|
2.30
|
Initial preps of eventual F-1211 Assembly
|
Details
|
  |
|
11-02-2009
|
2.50
|
Fabrication and Bulkhead doubler prep
|
Details
|
  |
|
10-31-2009
|
3.00
|
Fuselage Frames
|
Details
|
  |
|
10-30-2009
|
1.00
|
Hard Drive fatal crash
|
Details
|
  |
|
04-19-2009
|
1.50
|
Joining the fuselage to the firewall
|
Details
|
|
|
04-18-2009
|
4.00
|
Steps and a fabricated bracket
|
Details
|
|
|
04-17-2009
|
6.00
|
firewall and firewall shelf
|
Details
|
  |
|
04-13-2009
|
3.00
|
Tunnel assembly
|
Details
|
  |
|
04-10-2009
|
3.00
|
More lower firewall
|
Details
|
  |
|
04-03-2009
|
4.00
|
Firewall blues
|
Details
|
  |
|
03-28-2009
|
2.00
|
Nothing much different here
|
Details
|
  |
|
03-26-2009
|
0.20
|
Twisted wires
|
Details
|
|
|
03-24-2009
|
4.00
|
Mostly Seat backs
|
Details
|
|
|
03-23-2009
|
3.00
|
Facet Pump Brackeet; Block Studs
|
Details
|
  |
|
03-22-2009
|
1.50
|
Baggage bulkhead
|
Details
|
  |
|
03-14-2009
|
4.00
|
Lower forward fuselage
|
Details
|
  |
|
03-13-2009
|
1.00
|
This and that
|
Details
|
  |
|
03-13-2009
|
4.00
|
Re-do's and steps
|
Details
|
  |
|
03-05-2009
|
2.00
|
seatbacks
|
Details
|
|
|
03-03-2009
|
4.00
|
Seat back
|
Details
|
|
|
03-01-2009
|
3.00
|
|
Details
|
  |
|
02-16-2009
|
2.00
|
New brackets for a trapped bearing
|
Details
|
  |
|
01-09-2009
|
2.00
|
Re-do redux
|
Details
|
  |
|
01-08-2009
|
3.00
|
Re-do Column Control
|
Details
|
|
|
01-02-2009
|
8.00
|
Mostly skinning the fuselage bottom
|
Details
|
|
|
12-30-2008
|
8.00
|
Seat and Floor of cockpit
|
Details
|
|
|
12-24-2008
|
3.50
|
Riveting stuff to the bulkhead
|
Details
|
|
|
12-23-2008
|
6.00
|
Not enought, too much; not enoug...
|
Details
|
|
|
12-22-2008
|
4.00
|
Small parts and tails.
|
Details
|
|
|
12-07-2008
|
2.00
|
Preparing Parts.
|
Details
|
|
|
12-06-2008
|
4.50
|
The floor of the cabin
|
Details
|
|
|
12-05-2008
|
6.50
|
Where the pilot sits.
|
Details
|
|
|
12-01-2008
|
5.50
|
Nutplates can make you Nuts!
|
Details
|
|
|
11-26-2008
|
4.00
|
Flaperon mixer arm & seat ribs
|
Details
|
|
|
11-25-2008
|
6.00
|
Pull-thru rivets
|
Details
|
|
|
11-24-2008
|
3.00
|
baggage compartment.
|
Details
|
|
|
11-11-2008
|
5.50
|
assembling baggage floor and ribs
|
Details
|
|
|
11-07-2008
|
8.00
|
Assembly of Center Section Bulkhead
|
Details
|
|
|
10-28-2008
|
6.00
|
Wings, Inventory done. Bulkhead started
|
Details
|
|
|
10-26-2008
|
4.00
|
Inventory of small parts
|
Details
|
  |
|
10-25-2008
|
4.00
|
inventory
|
Details
|
  |
|
10-22-2008
|
96.00
|
Finishing the wings and flaperons.
|
Details
|
  |
|
07-12-2008
|
7.00
|
Cleco and Rivet inboard bottom skin
|
Details
|
|
|
07-09-2008
|
25.00
|
Pulled Rivet removal education.
|
Details
|
  |
|
06-23-2008
|
3.00
|
Fix stall warning device.
|
Details
|
|
|
06-17-2008
|
3.50
|
Building a Stall Warning.
|
Details
|
|
|
06-14-2008
|
2.50
|
Redo with one new rib, and an old one.
|
Details
|
  |
|
06-05-2008
|
3.00
|
Correcting a mistake, understanding Section 16
|
Details
|
|
|
06-04-2008
|
6.00
|
Nose Ribs prepped, clecoed, and riveted to Rt main
|
Details
|
  |
|
06-03-2008
|
5.50
|
Riveted main ribs to right main spar
|
Details
|
  |
|
06-01-2008
|
10.00
|
Prepared, assembled and riveted Nose Ribs
|
Details
|
|
|
05-30-2008
|
8.00
|
Main Ribs prepared and partially riveted to main s
|
Details
|
|
|
05-28-2008
|
4.50
|
trimming main ribs. starting some assembly
|
Details
|
  |
|
05-27-2008
|
4.00
|
Main Ribs
|
Details
|
  |
|
05-26-2008
|
4.00
|
Deburring ribs and figuring out Nutplates.
|
Details
|
  |
|
05-25-2008
|
5.00
|
Tapped upper end of AEX's. Prepared Nose Ribs
|
Details
|
|
|
05-23-2008
|
2.00
|
straitening more ribs
|
Details
|
  |
|
05-22-2008
|
1.00
|
Drill and Tap AEX tiedown
|
Details
|
  |
|
05-19-2008
|
4.00
|
Finished riveting rear spars, began "fluting" ribs
|
Details
|
|
|
05-18-2008
|
3.00
|
Rear Spar, Spar Doubler, Flaperon Hinge Assembly,
|
Details
|
|
|
05-16-2008
|
2.00
|
deburring doublers, riveting Flaperon Hinge
|
Details
|
  |
|
05-15-2008
|
2.00
|
Riveting Flaperon Hinge Assembly
|
Details
|
  |
|
05-14-2008
|
4.00
|
Countersink 120 degree Stub Spar Ass. Flange. Sque
|
Details
|
  |
|
05-13-2008
|
2.00
|
Hinge assembly (2) preparation
|
Details
|
  |
|
05-12-2008
|
2.00
|
Hinge Bracket Assembly
|
Details
|
 |
|
05-11-2008
|
3.00
|
Countersink stub spar assembly, prepare flaperon
|
Details
|
  |
|
05-09-2008
|
3.00
|
Riveting attach angles to spar
|
Details
|
|
|
05-08-2008
|
4.00
|
Fabrication and clecoing wing spar
|
Details
|
  |
|
05-07-2008
|
4.00
|
reading, studying, starting
|
Details
|
|
|
05-06-2008
|
3.00
|
Uncrating and unpacking
|
Details
|
|
|
05-05-2008
|
4.00
|
wing kit delivered
|
Details
|
|