Date
|
Hours
|
Work Log Summary

|
Details

|
09-06-2008
|
8.00
|
Left Flap, Aileron and both wing inspection plates
|
|
|
|
09-05-2008
|
4.00
|
Starting with the fuselage
|
Details
|
  |
|
09-05-2008
|
4.00
|
Changing bad rivets on right wing
|
|
|
|
09-04-2008
|
8.00
|
Left wing bottom skin
|
Details
|
|
|
09-03-2008
|
8.00
|
More pitot and prepering to finish left wing
|
|
|
|
09-02-2008
|
8.00
|
Pitot and conduit
|
Details
|
|
|
08-22-2008
|
20.00
|
Finishing right wing
|
Details
|
  |
|
08-16-2008
|
4.00
|
Right wing bottom skin dimpling and installing the
|
|
|
|
08-15-2008
|
3.00
|
Installing Right Tank to Wing
|
Details
|
|
|
08-14-2008
|
5.00
|
Closing Right Tank
|
Details
|
|
|
08-13-2008
|
5.00
|
Working on right wing and tank
|
Details
|
|
|
08-12-2008
|
2.00
|
Drilling right wing bottom skin
|
Details
|
 |
|
08-05-2008
|
2.00
|
Finishing left tank
|
Details
|
 |
|
07-29-2008
|
1.00
|
Fuselage Kit is here!!!!!!!
|
Details
|
|
|
07-26-2008
|
50.00
|
Preparing the hangar
|
Details
|
|
|
07-10-2008
|
3.00
|
Moving to the hangar
|
Details
|
|
|
05-31-2008
|
3.00
|
Duckwork Landing Light right wing
|
Details
|
|
|
05-09-2008
|
3.00
|
Capacitive Fuel Sender Spacers/Washer
|
Details
|
|
|
05-09-2008
|
3.00
|
Anti-hang Mod
|
Details
|
|
|
05-08-2008
|
3.00
|
Tanks Mod for Aerobatic
|
Details
|
|
|
05-08-2008
|
2.00
|
Installing tanks Vent and BNC Connector
|
Details
|
|
|
04-25-2008
|
1.00
|
Van's SB 06-2-23
|
Details
|
 |
|
12-23-2007
|
1.00
|
Tail Light
|
Details
|
|
|
12-10-2007
|
3.00
|
Receiving wing kit
|
Details
|
|
|
06-19-2007
|
1.00
|
Empenage the beggining
|
Details
|
|