Date
  | 
	Hours
  | 
	Work Log Summary 
		 
  | 
	Details 
		 
  | 
	
		
	
	 08-06-2007
  | 
	3.00
  | 
	Dimpling and riveting rudder skins and stiffeners
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-05-2007
  | 
	4.00
  | 
	Riveting stiffeners to Rudder skin
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-31-2007
  | 
	4.00
  | 
	Finished metal work for vertical stabilizer
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-27-2007
  | 
	6.00
  | 
	Completed Horizontal Stabilizer subassembly.
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-21-2007
  | 
	5.00
  | 
	Riveting HS
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-18-2007
  | 
	6.00
  | 
	Joined the two horizontal stabilizers.
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-08-2007
  | 
	2.00
  | 
	Councelor Tom Hunter does magic with bad rivets.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-06-2007
  | 
	4.00
  | 
	New technical advisor Tom Hunter
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-01-2007
  | 
	3.00
  | 
	Rudder stiffeners
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-30-2007
  | 
	2.00
  | 
	Riveting
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-23-2007
  | 
	4.00
  | 
	Riveting aft VS spar and spar doubler. Riveting ri
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-23-2007
  | 
	5.00
  | 
	EAA Technical Advisor Mike Laubach's visit.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-20-2007
  | 
	8.00
  | 
	Started on Vertical Stabilizer
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-14-2007
  | 
	6.00
  | 
	Getting ready to rivet HS skeleton and skin
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-06-2007
  | 
	2.50
  | 
	Match drill all 3/32 holes in Rt. HS and dissasemb
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 06-05-2007
  | 
	6.00
  | 
	repeating left horizontal stabilizer tasks on Rt. 
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-22-2007
  | 
	3.00
  | 
	Countersinking
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-25-2007
  | 
	2.00
  | 
	Finish platform for dimpler. Dimple ribs and skin
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-23-2007
  | 
	5.00
  | 
	table for dimpler
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-16-2007
  | 
	0.50
  | 
	Fixing the DRDT-2
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-05-2007
  | 
	4.00
  | 
	Possible problem with dimpler. Worked on "table" f
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-03-2007
  | 
	3.00
  | 
	Deburring and vinyl stripping
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-02-2007
  | 
	5.00
  | 
	Disassemble L HS, deburr, remove vinly strips
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-30-2007
  | 
	3.00
  | 
	Match drill (#40)  of skins to spars and ribs
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-29-2007
  | 
	3.00
  | 
	Cleco the skin to the skeleton of L Hor. Sabilizer
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-28-2007
  | 
	4.00
  | 
	Cleco spar to doubler, ribs to spar, skin, left
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-23-2007
  | 
	3.00
  | 
	Match dilled the fibricated attach angles. Made ji
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-22-2007
  | 
	3.00
  | 
	Attach angle fabrication
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-17-2007
  | 
	1.00
  | 
	Technical Advisor visit
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-16-2007
  | 
	4.00
  | 
	Fabricating attach angles; second try.
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-13-2007
  | 
	2.00
  | 
	Deburring and descratching
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-09-2007
  | 
	4.00
  | 
	Deburred, fluted, clecoed, and match drilled HS ri
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-08-2007
  | 
	2.00
  | 
	Deburred ribs
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-07-2007
  | 
	3.00
  | 
	Match drilled 8 brackets; fabricated and drilled s
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-05-2007
  | 
	4.00
  | 
	New vise, rear spar & doubler match drilled
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-04-2007
  | 
	3.00
  | 
	Fabrication of HS attach angle
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-03-2007
  | 
	2.00
  | 
	Cut aluminum angle with hacksaw
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-02-2007
  | 
	2.00
  | 
	Tecnical Councellor Visit
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-28-2007
  | 
	3.00
  | 
	In persuit of a bandsaw
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-26-2007
  | 
	1.00
  | 
	Match drill forward spars to doubler
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-23-2007
  | 
	4.00
  | 
	Bench Grinder,  Drill Press, Shop Vacuum
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-08-2007
  | 
	4.00
  | 
	Avery RV Builders Tool Kit
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-06-2007
  | 
	1.00
  | 
	DRDT-2 Hand Dimpling Tool
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-01-2007
  | 
	12.00
  | 
	Craftsman Oil lubricated  Air compressor
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-30-2007
  | 
	22.00
  | 
	Garage preparation
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       |