Powered By Kitlog Pro v2.0
GIORGIO'S WEB SITE
CH650
All
Work Logs Found:
212
Category Work Time:
832 Hours
Date
Hours
Work Log Summary
Details
10-03-2025
3.00
Added oil cooler baffles
Details
10-01-2025
3.00
finished check lists
Details
09-29-2025
2.00
Weight and Balance
Details
09-24-2025
2.50
Magnetometer Calibration
Details
09-22-2025
2.50
Lot of small jobs
Details
09-19-2025
2.50
Reinstalled arm rest after covering it with Vynil
Details
09-17-2025
3.00
installed wings fairings
Details
09-15-2025
3.50
Installed seat belts + control cables tensioned
Details
09-12-2025
3.00
finished riveting wings
Details
09-10-2025
3.00
Fuel calibration
Details
09-08-2025
3.00
Finished sides of canopy seal; installed bttom doo
Details
09-08-2025
3.00
Check List
Details
09-05-2025
5.00
glud canopy weatherstripping+ step fairing
Details
07-17-2025
4.00
Riveted Canopy
Details
07-15-2025
4.00
Installed canopy
Details
07-13-2025
3.00
Replaced nutplates + installed canopy frame
Details
07-11-2025
3.00
Installed back canopy supports
Details
07-09-2025
4.00
riveted baggage bloor
Details
07-06-2025
3.50
Calibrated pitch trim
Details
07-04-2025
3.00
Installed GPS antennas on forward skin
Details
07-02-2025
3.00
Riveted Top skins + boarding steps
Details
06-30-2025
3.00
Installed pitch servo wire +misc
Details
06-27-2025
3.00
Installed diode on Starter
Details
06-25-2025
3.50
Trimmed tip RH wing and installed RH Top Wing skin
Details
06-23-2025
4.00
Installed ailerons+ top skin on LH wing
Details
06-20-2025
4.00
Started engine; installed flaps
Details
06-18-2025
3.50
Tested fuel flow
Details
06-11-2025
4.00
Installed propeller, bled brakes
Details
06-09-2025
3.00
Several small tasks
Details
06-06-2025
4.00
Trimmed and clecoed engine rubber baffles
Details
06-04-2025
3.50
Installed front baffles+ Muffler hole
Details
06-02-2025
4.50
Finished installing cowling nutplates
Details
05-30-2025
3.50
Connected CH nd EGT left side
Details
05-27-2025
3.00
Wired RH sie EGT and CHT probes
Details
05-20-2025
5.50
nstalled EGT probes and cowling nutplates
Details
05-19-2025
3.25
Installed CHT probes
Details
05-16-2025
4.00
Cut and installed oil dipstick access door
Details
05-14-2025
5.00
Fitted upper and lower cowlings
Details
05-12-2025
3.50
Installed prop hub+ trimmed engine cowls
Details
05-09-2025
4.00
made Ignition cables
Details
05-07-2025
5.00
Trimmed and installed Air Boxes for baffling
Details
05-05-2025
5.00
Installed oil cooler and throttle
Details
05-02-2025
4.00
Installed voltage Regulator
Details
04-30-2025
4.00
Conncted engin to ECU
Details
04-28-2025
4.50
Installed engine
Details
04-25-2025
3.00
Connected capacitor to ttery
Details
04-23-2025
4.50
Installed seats
Details
04-18-2025
3.00
connected battery
Details
04-16-2025
4.50
Installed Instrument panel
Details
04-14-2025
3.00
Made GPS antennas cables and mounts
Details
04-11-2025
4.00
Installed brake lines
Details
04-09-2025
5.00
Made COM coax cables
Details
04-07-2025
5.00
Tested Avionics
Details
04-07-2025
3.00
made P0 and P1 connectors
Details
04-04-2025
5.00
more wiring
Details
04-02-2025
4.00
Installed back-up battery
Details
03-31-2025
7.00
more wiring
Details
03-28-2025
3.00
installed fuel pumps and pre-filters
Details
03-26-2025
5.50
installec ECU and more wiring
Details
03-24-2025
5.50
Installed battery anbattery contactor
Details
03-21-2025
5.00
relocated Pitoto and OAT probe
Details
03-17-2025
4.00
Relocated pitot tube + OAT install
Details
03-14-2025
5.50
VOR antenna, magnetometer, transponder
Details
03-12-2025
3.50
installed ELT
Details
03-11-2025
5.00
Replaced yokes connectors
Details
03-03-2025
4.00
Installed NACA scoops
Details
02-28-2025
3.25
Fabricated and installed supports for angle uel fi
Details
02-26-2025
4.00
Installed dder cables
Details
02-24-2025
3.00
Installed aileron control cables
Details
02-21-2025
2.25
installed upper limits elevator
Details
02-19-2025
3.50
Installed elevator and rudder
Details
02-17-2025
4.50
Installed horizontal stabilizer
Details
02-14-2025
4.50
Attached wing Tie down points + antennas
Details
02-12-2025
3.50
Temporay installed ailerons
Details
02-10-2025
3.00
Installed steering rods
Details
02-07-2025
2.75
eliminated play in control yoke
Details
02-05-2025
4.00
Installed fuel lines Righting
Details
02-03-2025
4.00
Installed fuel hoses left wing
Details
01-30-2025
4.00
riveted flap torque tube supports
Details
01-27-2025
4.50
Installed Flaps
Details
01-24-2025
4.00
Installed rear spar support
Details
01-22-2025
4.00
Temporay installed both wings to fuselage
Details
01-20-2025
2.00
Miscellaneous
Details
01-17-2025
3.00
Drilled hole for fuel filler
Details
01-15-2025
2.50
installed left fuel tank
Details
01-13-2025
2.50
enlarged slots for rear spar
Details
01-09-2025
3.50
Riveted bottom skin
Details
01-07-2025
4.00
Drilled bottom wing to final size
Details
01-02-2025
4.00
drilled top skin and top nose sking to final size
Details
12-30-2024
4.00
Installed nose skin and clecoed to bottom of Left
Details
12-27-2024
3.50
riveted L agles to Bottom skin
Details
12-22-2024
2.00
Drilled and clecoed new rear frame channel
Details
12-20-2024
3.50
Installed Roll servo
Details
12-18-2024
3.50
installed Pitot/AOA tube
Details
12-16-2024
3.50
Installed Pitot tube mount
Details
12-13-2024
4.50
installed and clecoed bottom skin
Details
12-11-2024
5.00
Installed Left wing top skin + L angles
Details
12-09-2024
3.00
clecoed Left Wing nose ribs
Details
12-06-2024
5.50
Sarted Left wing. Riveted skeleton
Details
12-04-2024
5.00
installed Rightingtip
Details
12-02-2024
2.50
made dome to cover fuel QTY sensor
Details
11-29-2024
2.00
Drilled fuel cap hole
Details
11-27-2024
3.50
positioned fuel tank
Details
11-25-2024
5.00
riveted bottom of nose skin
Details
11-22-2024
3.00
installed tip NA/Strobe light
Details
11-20-2024
3.00
installed aileron bellcrank and linkage
Details
11-18-2024
3.00
added grommets fo r3/8" hose on first 2 nose ribs
Details
11-15-2024
3.50
Debured and riveted bottom skin
Details
11-13-2024
6.00
Drilled top spars to final size
Details
11-11-2024
3.50
drilled top skin tp final size
Details
11-08-2024
6.00
installed and clecoed nose wing skin
Details
11-06-2024
2.75
drilled bottom rear skin to final A5 size
Details
10-31-2024
3.00
reinstalled nose ribs with added grommets
Details
10-30-2024
5.00
drilled and clecoed Bottom skin
Details
10-28-2024
4.50
finished nose ribs+ installed top rear skin
Details
10-25-2024
5.00
installed ear spar and riveted rear ribs
Details
10-23-2024
4.00
Drilled and clecoed rear ribs to front spar
Details
10-21-2024
4.00
fished rear spars
Details
10-19-2024
5.50
Finished Ribs 1 to 4
Details
10-17-2024
4.00
sorted ribs and clecoed aileronellcrank
Details
10-14-2024
6.00
built Righ Aileron
Details
10-11-2024
7.25
Finished Left Aileron
Details
10-09-2024
3.75
Installed Trim Tab
Details
10-07-2024
5.50
finished Left flap and started LH aileron
Details
10-04-2024
6.00
Made Right Flap
Details
10-02-2024
4.00
installed flap motor
Details
09-30-2024
5.00
installed nutplates for center console sides
Details
09-18-2024
3.50
Installed both center cosole forward covers
09-16-2024
4.50
Installed fuel selector
Details
09-13-2024
6.00
Installed dual yokes and throttle
Details
09-11-2024
4.00
clecoed center console
Details
09-09-2024
6.00
Finished forwars sides
Details
09-07-2024
3.50
installed nutltes on instrument panel
Details
09-05-2024
6.15
cut top skin to make easy access behind instrument
Details
09-04-2024
4.50
moved as spring bracket-prepared left side cover
Details
09-02-2024
6.15
made front canopy aft skins
Details
08-30-2024
6.50
finished aft canopy sides
Details
08-28-2024
4.00
rear canopy side trims
Details
08-26-2024
4.50
trimmed aft canopy and aft skin
Details
08-23-2024
4.00
drilled forward canopy and clecoed to support tube
Details
08-21-2024
3.45
started trimming canopy
Details
08-19-2024
4.00
trimmed and clecoed mid canopy loop to nopy rails
Details
08-17-2024
4.00
riveted forward sides and started canopy aft loop
Details
08-15-2024
4.00
Instrument panel cover
Details
08-14-2024
4.00
Fitted Canopy frames
Details
08-12-2024
4.00
installed rudder fairing + top rudder hinge
Details
08-09-2024
4.00
trimmed top skin and saddle
Details
08-08-2024
3.00
installed Horizontal stabilizer
Details
07-05-2024
3.00
installed engine mount
Details
07-03-2024
4.00
installed mn gear
Details
07-01-2024
3.50
installed tirs
Details
06-28-2024
4.00
started main gear
Details
06-26-2024
3.50
installed nose gear
Details
06-24-2024
3.50
drilled and installed nose gear fork to nose gear
Details
06-23-2024
4.50
installed canopy lock handle and torque tue
Details
06-21-2024
3.00
upper engine mounts final drilling
Details
06-20-2024
4.00
riveted forwar fuselage
Details
06-19-2024
4.50
cleco fuselage skins back in place
Details
06-17-2024
4.00
installed flaps supports; riveted back fuselage to
Details
06-16-2024
5.00
various small tasks
Details
06-13-2024
4.50
Deburred and riveted
Details
06-11-2024
4.00
riveted forard bottom fuselage
Details
06-08-2024
4.00
deburring+ start riveting bottom
Details
06-06-2024
4.50
took fuselage apart for deburring
Details
06-04-2024
4.00
installeduprights doublers
Details
05-31-2024
4.00
installed rear top skin
Details
05-29-2024
3.50
installed forward longeon doublers
Details
05-27-2024
4.50
seat bottom, seat belt attachment
Details
05-25-2024
4.50
installed arm rest supports
Details
05-21-2024
4.50
finshed seat bottoms
05-16-2024
4.50
added Z angles+ LH seaat
Details
05-14-2024
4.50
Forward skins and L angle
Details
05-13-2024
3.50
installed canopy torque tube supports
Details
05-10-2024
4.00
finished aft torque tube support
Details
05-08-2024
4.00
finished seat back and flap motor mount
Details
05-07-2024
4.00
started seat back
Details
05-04-2024
4.50
sized baggage compartment floor
Details
05-02-2024
4.00
Aft spar uprights
Details
04-29-2024
4.00
installed baggage compartment bulkhead
Details
04-26-2024
4.00
installed spar uprights
04-23-2024
4.00
added gear uprights and gussets
Details
04-22-2024
4.00
installed 2 forward sking and gear braccket
Details
04-19-2024
3.00
drilled gear supports+ positioned RH skin
Details
04-16-2024
4.50
added backseat, instrument panel
Details
04-15-2024
3.50
installed firewall and upper longerons
Details
04-11-2024
4.00
Added pedals
Details
04-09-2024
5.00
Riveted Firewall and started floor
Details
04-08-2024
5.00
Firewall assembly
Details
04-05-2024
3.00
installed reachannelc+ made upperrudder bearing
Details
04-02-2024
3.50
prepared gear chanl and lower backseat
Details
04-01-2024
3.00
installed inspection panel +riveting
Details
03-30-2024
5.00
installed rudder cable fairing
Details
03-28-2024
3.00
finished aft section
Details
03-25-2024
4.00
installed rear parts over HT frames
Details
03-23-2024
5.00
Leftfuselage side
Details
03-21-2024
4.50
Attached right side to bottom fuselage
Details
03-19-2024
4.50
Made bottom door + L angles
Details
03-15-2024
4.50
Riveted bottom fuselage
Details
03-14-2024
4.00
installed lower rudder hinge
Details
03-12-2024
4.00
Installed lower longerons
Details
03-09-2024
3.50
started bottm fuselage
Details
01-19-2024
3.00
Finished Elevator
Details
01-17-2024
3.00
Installed Elevator Horns and tim tab
Details
01-16-2024
2.00
Drilled and clecoed Elevator hinge
Details
01-15-2024
4.50
Installed Horizontal Stabilizer tip fairings
Details
01-14-2024
3.00
Tip ribs and hinge
Details
01-13-2024
2.50
Riveted Horizontal Stabilizer Skin
Details
01-11-2024
3.00
Riveted Horizontal Stabilizer ribs and spar
Details
01-09-2024
2.50
Final Rudder riveting Start horizontal stabilizer
Details
01-06-2024
3.00
Fitted nose rudder skin
Details
01-05-2024
4.00
Started rudder
Details
01-04-2024
1.00
Tail kit inventory
Details
SITE NAVIGATION
Contact Builder
RV14A Home
CH650 Home
Category
# Logs
# Hours
All
212
1103
Avionics
22
106
Canopy
17
76
Empennage
11
282
Engine
22
87
Fuselage
84
328
Miscellaneous
3
6
Wings
53
218
Copyright © 2001-2026 Matronics. All Rights Reserved.