RV10
RV10
All
Work Logs Found:
154
Category Work Time:
1682 Hours
Date
Hours
Work Log Summary
Details
04-12-2025
12.00
Started the layout and fitting of all the avionics
03-22-2025
10.00
Started cutting doors and fitting
01-02-2025
50.00
Installing door latch sytems on both doors
12-06-2024
12.00
Received all the Garmin Avionics for the plane.
12-03-2024
12.00
Attached Cabin Top
Details
11-29-2024
8.00
Garmin Avionics ordered
11-06-2024
16.00
Prepared Cabin top for paint and applied paint
11-05-2024
4.00
Primed fiberglass tailcone top
11-04-2024
16.00
Reinstalling controls & Fuel system after interior
10-28-2024
28.00
Prep and paint final interior of fuse and all smal
09-18-2024
24.00
Prep and paint of cabin top and tailcone top
05-26-2024
24.00
Removed for painting, controls and fuel systems
03-19-2024
24.00
Did 6 carbon fiber bid layups on BRS channels
03-13-2024
8.00
Laid out BRS channels in the cabin top and tailcon
12-27-2023
68.00
Cutting and fitting and drilling out cabin top for
09-21-2023
6.00
Attachment points for chute box
Details
09-02-2023
143.00
Completed fuse including BRS channels and bulk hea
12-31-2022
8.00
Priming fuse small parts
12-05-2022
24.00
Continue working on finishing fuse interior
03-28-2022
8.00
Complete foot peddles
03-27-2022
8.00
Foot Peddles
Details
03-26-2022
18.00
Intalled SS fuel hoses for EFII system with return
03-23-2022
8.00
Fuel Pumps
Details
02-10-2022
8.00
Made support plate and mounted fuel pumps in tunne
02-07-2022
4.00
Started installing the EFII fuel system
01-31-2022
16.00
Attached tailcone to fuse and riveted bottom skins
01-25-2022
6.00
Riveted the tailcone bottom skin in place
01-17-2022
8.00
Finished riveting all tailcone assemblies
01-10-2022
16.00
Removed all blue plastic from tailcone parts, prep
01-03-2022
5.00
Match hole drilled right side tailcone longerons
12-11-2021
4.00
Assembled tail cone
Details
07-28-2021
40.00
Installed channel on right side including BRS rock
07-25-2021
25.00
Installing left & right skin with channel
Details
07-21-2021
6.00
Installing spacers on fuse
07-06-2021
4.00
Primed spacers and installed on left side of fuse
06-14-2021
8.00
Channel spacers fab.
Details
06-10-2021
4.00
Started fabing the 3/16 alum bar spacers for the e
06-08-2021
4.00
Cut left side skin for channels.
06-03-2021
3.00
Continued to cut and roll harness channel
Details
06-01-2021
4.00
Cutting and bead rolling harness channel.
Details
05-27-2021
2.00
Started layout of harness channel down pilot side
Details
03-22-2021
2.00
Prepared side skins for roll bending
11-12-2020
16.00
Made and sent sample of install process to BRS
08-27-2020
3.00
Drilling Longerons to substructure - 29-7
08-25-2020
1.00
Baggage Door seal angle
08-17-2020
6.00
Rolling Mid Side Skins
08-14-2020
2.00
Fab Clamping Block
08-13-2020
4.00
Finished bending and drilling longerons
08-07-2020
4.00
Cutting and bending longerons
08-06-2020
4.00
Cutting and Bending Longerons
07-01-2020
7.00
Continuing Riveting the Bulkhead Assemblys togethe
06-30-2020
7.00
Riveting the skins together to connect the Fwd and
06-29-2020
7.00
Connecting the Fwd Center Section Bulkhead Assembl
06-26-2020
7.00
Riveting the connecting parts to the bottom skin,
06-16-2020
7.00
Working on seat brackets, and deburring holes on S
06-15-2020
7.00
Clecoing the skin together after being primed, and
06-11-2020
7.00
Continued work on Fuselage
06-10-2020
7.00
Prepping skin and working on the seat brackets
06-06-2020
1.00
Dimpling the F-1072 FWD Bottom Skin
06-04-2020
7.00
Mating the Fwd Fuselage Bulkhead with the Aft Fuse
06-01-2020
7.00
Continued work on the Fuselage Assembly to get rea
05-28-2020
7.00
Final Drilling the holes common to the floor panel
05-27-2020
7.00
Clecoing the Frames to get ready to final drill th
02-22-2020
7.00
Continuing work on the Firewall
07-02-2019
7.00
Riveting the skin onto the Mid Fuse Ribs
07-01-2019
7.00
Begining work for the firewall.
04-13-2019
4.00
Primed final parts and prepared for assembly
03-20-2019
2.00
Started pre-fit ribs on rear seat subassembly
03-15-2019
4.00
Contined work on seat sub assembly
03-11-2019
4.00
Started Seat Rib Subassembly
02-09-2019
8.00
Prepared and Primed all parts and marked bottom sk
07-20-2018
18.00
Both Hunter and Logan helped finishing rear spar b
07-19-2018
12.00
Worked on rear spar bulkhead assembly
07-18-2018
12.00
Started rear spar. Primed parts
07-17-2018
12.00
Continued work on Aft center section
07-16-2018
12.00
Finished riveting primed parts on center bulkhead
Details
07-11-2018
12.00
Started Riveting on F-100C-L&R supports
Details
07-06-2018
4.00
Primed Fwd Center Section bulkhead parts
06-28-2018
12.00
Contined work on mid fus bulkheads
Details
06-27-2018
12.00
Started Mid Fuse Bulkheads
Details
08-09-2017
8.00
Primed tailcone parts
Details
08-04-2017
18.00
Tailcone work
Details
08-02-2017
18.00
Contined work on tailcone
Details
08-01-2017
18.00
Started Tailcone
Details
07-13-2017
18.00
Prosealing elevator trailing edge
07-06-2017
18.00
Working on elevators
06-21-2017
12.00
Working on elevators
06-19-2017
12.00
Started on elevators
06-16-2017
12.00
Completed HS
06-15-2017
12.00
Continued riveting HS skins
06-14-2017
12.00
Continued riveting HS skins
Details
06-13-2017
18.00
HS final riveting
Details
06-12-2017
18.00
Started final assembly of HS including riveting
Details
06-09-2017
8.00
Working on tail cone prep. Cutting , drilling, etc
Details
06-07-2017
16.00
Finished skinning the VS
Details
06-06-2017
18.00
Started riveting the skin
Details
06-05-2017
18.00
Final Assembly of VS. Final Riveting
Details
08-17-2016
9.00
Finished Inventory on Fuslage Kit
08-15-2016
9.00
Inventoried Fuselage Kit
08-12-2016
4.00
Picked up fuselage kit from freight lines dock
08-01-2016
2.00
Video taped all the pre-skinned parts for AP's rev
07-27-2016
12.00
Finished riviting the elevators for pre-skin inspe
07-25-2016
12.00
Started riviting the elevators
07-20-2016
12.00
Continued to rivit the HS
07-15-2016
4.00
Started Riviting HS Ribs
07-13-2016
12.00
Riviting the HS Spars
07-12-2016
12.00
Starting Riviting the HS. Completed upto page 8-6
07-11-2016
14.00
Started riviting the rudder.
07-11-2016
2.00
Ordered Fuselage Kit
07-08-2016
8.00
Finished Priming all parts
07-07-2016
10.00
Bulk Primed all parts and skins for rudder, HS, &
07-06-2016
12.00
FInished getting parts ready for prime.
07-05-2016
14.00
Working on the HS - Dimple Skins and Preping parts
06-30-2016
10.00
Fitted parts and installed in skins. started strip
06-29-2016
12.00
Continued drilling and fitting parts
06-28-2016
12.00
Fabricated Cradles
06-27-2016
12.00
Back on HS - preparing parts for priming
06-23-2016
12.00
Flipped parts over on racks and primed
06-22-2016
12.00
Primed Rudder and Elevators
06-21-2016
12.00
Preparing parts for priming
06-20-2016
12.00
Alumiprep and Alodine Parts
06-17-2016
12.00
Continued working on HS to prepare for priming
06-15-2016
12.00
Received replacment spar so dropped back to start
06-14-2016
12.00
Continued to work preparing parts for priming
06-13-2016
12.00
Contintued on preparing parts and stripping blue f
06-10-2016
12.00
Continued to work on getting parts ready for primi
06-09-2016
12.00
Cutting ribs and other parts
06-08-2016
12.00
While waiting on new HS spar started Elevators
06-07-2016
12.00
Drilled front spar flanges with 30 drill so had to
06-06-2016
12.00
Continued working on HS to get ready for priming
06-02-2016
12.00
Fit up and drilling on HS
05-31-2016
12.00
Pulled parts for HS and Started cutting stiffeners
05-19-2016
1.00
Finished step 13 and ready for priming
05-18-2016
4.00
Did fit up on parts and final drilling
05-17-2016
4.00
Rib parts & stiffeners seperation & Cutting
05-16-2016
1.00
Started Rudder / Pulled parts
03-15-2016
8.00
Wiring Harness for Ant and Camera
02-25-2016
1.00
Rudder stops & Wiring
Details
02-13-2016
4.00
Primed Parts
02-02-2016
4.00
Alumiprep and Alodine Parts
01-09-2016
4.00
FInished all steps up to priming on VS
01-03-2016
3.00
Dimpled Remaining Parts / RIbs
01-02-2016
0.50
FInished Dimpled Skins
01-01-2016
1.00
Dimpled VS skins
11-27-2015
1.50
Final Drilled Skins
11-20-2015
2.00
Assembled ribs and attached Skin
11-03-2015
1.50
Spar Caps
Details
10-15-2015
2.00
Vertical Stabilizer
Details
09-19-2015
16.00
Synergy Air Workshop
Details
09-18-2015
2.00
Vans Aircraft Tour
Details
08-24-2015
4.00
Inventoried Kit
Details
08-08-2015
4.00
Picked Up Kit at Dominion Freight Dock
08-06-2015
4.00
Picked Kit up
Details
07-31-2015
0.00
Kit Shipped from Vans
SITE NAVIGATION
RV10 Home
Category
# Logs
# Hours
All
154
1682
Avionics
3
32
BRS System
14
154
Empennage
71
658
Factory Visit
1
2
Finish Kit
2
60
Fuselage
62
760
Training
1
16