Date
|
Hours
|
Work Log Summary

|
Details

|
06-08-2025
|
4.50
|
Riveted the F-14142 Clips to the F-01417/16 Ribs
|
Details
|
|
|
06-08-2025
|
0.00
|
Riveted the F-14142 Clips to the F-01417/16 Ribs
|
Details
|
 |
|
06-07-2025
|
4.50
|
Riveted Doublers to the F-01423B L&R Ribs
|
Details
|
 |
|
06-04-2025
|
4.00
|
Bolted/Riveted F-01403D L&R to F-01403
|
Details
|
|
|
06-03-2025
|
5.00
|
Riveted the Side Angles to the Aft Center Section
|
Details
|
|
|
06-02-2025
|
3.00
|
Fabricated the Bearing Bracket Assemblies
|
Details
|
|
|
06-01-2025
|
3.50
|
Cleaned and Primed Mid Fuselage Lower Structure Pa
|
Details
|
 |
|
05-31-2025
|
5.50
|
Cleaned/Primed F-01403 Forward Center Section Part
|
Details
|
 |
|
05-30-2025
|
3.00
|
Fabricated the F-01405-B Parts x2
|
Details
|
|
|
05-29-2025
|
1.50
|
Fixed Left F-01405M, It needed to be Flipped Over
|
Details
|
  |
|
05-28-2025
|
1.50
|
Rivwted F-01405C/F-01405D L&R/F-01405A
|
Details
|
|
|
05-27-2025
|
2.00
|
Cleaned and Primed F-01405 Parts
|
Details
|
 |
|
05-23-2025
|
1.00
|
Collected Parts for the Forward Fuselage
|
Details
|
  |
|
05-20-2025
|
0.00
|
Brought the Tailcone to the Hangar for Storage
|
Details
|
|
|
05-19-2025
|
1.50
|
Completed Back Riveting the Top Skin
|
Details
|
|
|
05-16-2025
|
1.00
|
Replaced some rivets in left aft TopSide Skin
|
Details
|
  |
|
05-15-2025
|
5.00
|
Riveted the Right Top Side Skin
|
Details
|
|
|
05-14-2025
|
1.50
|
Finished Riveting the Left Top Side Skin.
|
Details
|
|
|
05-13-2025
|
2.50
|
Finished Riveting the Tailcone Bottom Skins.
|
Details
|
|
|
05-10-2025
|
4.00
|
Dimpled the Top Skin/Top Side Skins/F-14131
|
Details
|
|
|
05-09-2025
|
2.00
|
Cleaned/Etched, and Primed the Top Side Skins
|
Details
|
 |
|
05-05-2025
|
4.00
|
Drilled the Vertical Stabilizer to the F-01412C
|
Details
|
|
|
05-04-2025
|
6.00
|
Riveted the Aft Deck to the Tailcone.
|
Details
|
|
|
05-03-2025
|
1.50
|
Dimpled F-01409 Frame and Aft Deck.
|
Details
|
  |
|
05-01-2025
|
1.00
|
Ran the ELT & UAT Cables and Secured in Place.
|
Details
|
|
|
05-01-2025
|
1.50
|
Installed the Dynon Static System Ports.
|
Details
|
|
|
05-01-2025
|
1.50
|
Installed Rudder Cables
|
Details
|
|
|
04-29-2025
|
6.00
|
Riveted Nutplates on the Aft Empenage
|
Details
|
|
|
04-26-2025
|
2.50
|
Riveted most of the Side Skin Bottom Rows
|
Details
|
 |
|
04-24-2025
|
3.00
|
Riveted Side Skins Bottom J-Stiffeners
|
Details
|
|
|
04-23-2025
|
5.00
|
Riveted the Right Skin
|
Details
|
 |
|
04-22-2025
|
3.00
|
Riveted most of the Left Side Skin
|
Details
|
 |
|
04-21-2025
|
1.50
|
Taped Non-Riveted Holes in the L&R Side Skins
|
Details
|
  |
|
04-18-2025
|
0.00
|
Installed the WH-00057 Harness & WH-00059 - 2
|
Details
|
|
|
04-18-2025
|
3.00
|
Installed the WH-00057 Harness & WH-00059
|
Details
|
|
|
04-13-2025
|
2.00
|
Riveted the F-01210/F-01411 Bulkheads to Skin
|
Details
|
|
|
04-10-2025
|
5.00
|
Trimmed the F-01479 Aft Bottom Skin
|
Details
|
|
|
04-10-2025
|
0.00
|
Riveted the F-01412 Bulkhead to Aft Bottom Skin.
|
Details
|
|
|
04-09-2025
|
3.00
|
Clecoed Empennage Side Skins To Bulkheads
|
Details
|
|
|
04-08-2025
|
44.00
|
Dimpled Empennage Side Skins.
|
Details
|
 |
|
04-07-2025
|
6.50
|
Riveted Bulkheads to the Bottom Skin
|
Details
|
|
|
04-06-2025
|
7.50
|
Dimpled #40 Holes in Tailcone Bottom Skin.
|
Details
|
|
|
04-05-2025
|
3.50
|
Primed Tailcone Skins/F-01424 L&R/F01406B
|
Details
|
 |
|
03-28-2025
|
3.50
|
Riveted F-01410/F-01407/F-01408/F-0140
|
Details
|
|
|
03-28-2025
|
0.50
|
Riveted F-01408/F-0140 Bulkheads
|
Details
|
|
|
03-26-2025
|
6.50
|
Prepped F-01411/F-0140/F-01410/F-01407/F-01408
|
Details
|
 |
|
03-25-2025
|
1.00
|
Riveted the F-01412 Bulkheads together
|
Details
|
|
|
03-24-2025
|
0.50
|
Primed the F-01412 Bulkheads and Tie Down
|
Details
|
 |
|
03-23-2025
|
1.00
|
Dimpled the F-01412 Bulkheads
|
Details
|
  |
|
03-21-2025
|
1.00
|
Match Drilled F-01412 Bulkheads to Vertical Stab
|
Details
|
|
|
03-21-2025
|
2.00
|
Fabricated the F-14113 Rudder Stops
|
Details
|
|
|
03-20-2025
|
7.00
|
Separated and Deburred Numerous Parts
|
Details
|
|
|
03-19-2025
|
1.00
|
Collected Parts to Start Tail Cone Assembly
|
Details
|
  |
|
03-18-2025
|
1.00
|
Installed Elevator Lead Counterweights
|
Details
|
|
|
03-17-2025
|
2.00
|
Rolled the Elevator Leading Edges and Riveted
|
Details
|
|
|
03-15-2025
|
2.00
|
Installed the Pitch Trim Servo in the Left Elevato
|
Details
|
|
|
03-13-2025
|
4.00
|
Assembled the Pitch Trim Servo Assembly
|
Details
|
|
|
03-12-2025
|
5.00
|
Double Flush Riveted Elvator Trailing Edges
|
Details
|
|
|
03-10-2025
|
1.00
|
Adhered Elevator Top Skins to Trailing Edge Wedges
|
Details
|
|
|
03-09-2025
|
4.50
|
Riveted Skins to the Tip Ribs
|
Details
|
|
|
03-08-2025
|
5.00
|
Riveted Elevator Ribs to the Forward Spar
|
Details
|
|
|
03-07-2025
|
1.00
|
Clecoed Elevator Frames Inside Skins/Rear Spar
|
Details
|
|
|
03-04-2025
|
7.00
|
Riveted the Right Top Skin to the Rear Spar
|
Details
|
|
|
03-03-2025
|
3.00
|
Clecoed the E-1008 A&B Ribs together
|
Details
|
|
|
03-02-2025
|
4.00
|
Riveted E-1008B Ribs to the Left Elevator Top Skin
|
Details
|
|
|
03-01-2025
|
4.00
|
Riveted the E-1008B Ribs and Shear Clips
|
Details
|
|
|
02-28-2025
|
2.00
|
Riveted the Elevator Horns to the Elevators
|
Details
|
|
|
02-27-2025
|
1.50
|
Riveted the Counterbalance Skins to the Tip Ribs
|
Details
|
|
|
02-25-2025
|
7.00
|
Riveted the Elevator Frames together.
|
Details
|
|
|
02-24-2025
|
5.00
|
Marked the Elevator Rib Positions on the Skin
|
Details
|
|
|
02-21-2025
|
5.00
|
Roughed up the Rib and Trailing edge areas
|
Details
|
|
|
02-20-2025
|
4.00
|
Countersunk the Trailing Edges
|
Details
|
|
|
02-19-2025
|
8.00
|
Dimpled the Tip Ribs Assembles #30 & #40 Holes
|
Details
|
|
|
02-18-2025
|
2.00
|
Dimpled the E-913s and the Elevator Skins
|
Details
|
  |
|
02-17-2025
|
5.00
|
Etched, Cleaned & Primed the Elevator Components
|
Details
|
|
|
02-16-2025
|
1.00
|
Disassembled the Elevators
|
Details
|
  |
|
02-15-2025
|
5.00
|
Attached Elevator Top Skins and Trailing Edges
|
Details
|
  |
|
02-14-2025
|
1.00
|
Attached the Tip Rib Assemblies to the Spar
|
Details
|
|
|
02-14-2025
|
5.00
|
Assembled Left & Right Elevator Frames on Skins
|
Details
|
|
|
02-13-2025
|
2.50
|
Drilled Trim Tab Hinge Pilot holes
|
Details
|
|
|
02-12-2025
|
3.00
|
Cut & Sanded the Trailing Edge and Trim Tab Ribs
|
Details
|
 |
|
02-11-2025
|
4.50
|
Separated E-1008 A&B Ribs from each other
|
Details
|
|
|
02-10-2025
|
8.00
|
Completed the Horizontal Stabilizer
|
Details
|
|
|
02-09-2025
|
7.00
|
Riveted the HS Skins to the Front Spar Flanges
|
Details
|
 |
|
02-08-2025
|
4.50
|
Installed the Missing AN470AD4-5 Rivets
|
Details
|
  |
|
02-07-2025
|
6.00
|
Drillted Out the Front Spar Flange Rivets
|
Details
|
  |
|
02-06-2025
|
7.00
|
Today was a Disappointing Setback Day
|
Details
|
 |
|
02-05-2025
|
7.00
|
Riveted the HS-1004s to the HS-00916
|
Details
|
|
|
02-04-2025
|
6.00
|
Dimples the Horizontal Stabilizer Skins
|
Details
|
|
|
02-03-2025
|
2.50
|
Primed the Horizontal Stabilizer Skins
|
Details
|
  |
|
02-01-2025
|
2.00
|
Match Drill Modified Inboard HS905 and HS 1005
|
Details
|
  |
|
01-31-2025
|
4.00
|
Deburred the HS Ribs
|
Details
|
 |
|
01-30-2025
|
4.00
|
Riveted HS Front Spar Doubler to the Spar
|
Details
|
|
|
01-28-2025
|
4.00
|
Trimmed, Drilled and Deburred the Spar Caps
|
Details
|
  |
|
01-27-2025
|
4.00
|
Riveted Doubler to the HS Rear Spar
|
Details
|
|
|
01-26-2025
|
0.00
|
Built Work Bench Extension
|
Details
|
|
|
01-25-2025
|
3.00
|
Match Drilled HS Rear Spar and Doubler
|
Details
|
  |
|
01-24-2025
|
1.00
|
Deburred HS Spar and Doubler
|
Details
|
  |
|
01-23-2025
|
6.00
|
Riveted the Vertical Stailizer Skin to the Frame
|
Details
|
|
|
01-22-2025
|
2.00
|
Riveted the Vertical Stabilizer Spar
|
Details
|
 |
|
01-22-2025
|
4.00
|
Riveted the Rudder Trailing Edge
|
Details
|
|
|
01-21-2025
|
6.00
|
Riveted the Rudder Skin to the Rudder Spar
|
Details
|
|
|
01-20-2025
|
1.50
|
Riveted the Rudder Skin to the Frame
|
Details
|
 |
|
01-19-2025
|
0.50
|
Attached the Horn Brace With CR3213-4-3 Rivets
|
Details
|
 |
|
01-18-2025
|
6.00
|
Installed the Rudder Skeleton in the Rudder Skin
|
Details
|
 |
|
01-17-2025
|
3.00
|
Attached the Left Skin Trailing Edge to the VHB Ta
|
Details
|
|
|
01-16-2025
|
7.00
|
Removed Stiffeners From the Rudder Skins
|
Details
|
|
|
01-15-2025
|
2.00
|
Riveted Rudder Stiffeners to Skins REVERSED!
|
Details
|
  |
|
01-08-2025
|
3.50
|
Primed Rudder parts before dimpling.
|
Details
|
|
|
01-07-2025
|
3.50
|
Match Hole Drilled #40 Holes of the Rudder.
|
Details
|
  |
|
01-06-2025
|
1.50
|
Trimmed the Aft Edges of the Rudder Skin Stiffener
|
Details
|
|
|
01-06-2025
|
3.00
|
Assembled the Rudder for Fit and Drilling
|
Details
|
|
|
01-03-2025
|
7.00
|
Deburred/Primed/Assembled Rudder Skeleton
|
Details
|
|
|
01-02-2025
|
2.50
|
Separated and Deburred Parts for the Rudder Spar
|
Details
|
  |
|
01-01-2025
|
2.00
|
Ordered a Replacement VS Spar Doubler
|
Details
|
  |
|
12-31-2024
|
1.50
|
Dimpled Skins, Ribs, Spar of VS
|
Details
|
  |
|
12-25-2024
|
1.00
|
Primed the VS Parts with Wash Primer
|
Details
|
|
|
12-24-2024
|
1.50
|
Cleaned and ScrothBrited the VS Parts for Priming
|
Details
|
  |
|
12-23-2024
|
2.00
|
Assembled/Fit VS Parts together
|
Details
|
  |
|
12-22-2024
|
2.00
|
Gathered Parts fot the Vertical Stabilizer
|
Details
|
  |
|
09-23-2024
|
1.00
|
Tested Wing Lights From the Wing Root Connector
|
Details
|
|
|
09-23-2024
|
0.00
|
Tested Wing Lights From the Wing Root Connector
|
Details
|
|
|
09-23-2024
|
0.00
|
Tested Wing Lights From the Wing Root Connector
|
Details
|
|
|
09-23-2024
|
0.00
|
Tested Wing Lights From the Wing Root Connector
|
Details
|
|
|
09-23-2024
|
3.00
|
Finished Left Wing Landing Light Installation
|
Details
|
  |
|
09-22-2024
|
1.50
|
Started Installation of the Left Landing Light
|
Details
|
  |
|
09-20-2024
|
1.00
|
Finished Right Landing Light Installation
|
Details
|
|
|
09-19-2024
|
1.50
|
Started installing the Right mounting plate
|
Details
|
  |
|
09-18-2024
|
3.00
|
Fit Right Wing Landing Light Mounting Plate
|
Details
|
|
|
09-17-2024
|
4.00
|
Fabricated Landing Lights Adjustable Mounting Plat
|
Details
|
|
|
09-17-2024
|
0.00
|
Fabricated Landing Lights Adjustable Mounting Plat
|
Details
|
|
|
09-15-2024
|
1.00
|
Wired the Bob Archer VOR/ILS Antenna
|
Details
|
|
|
09-15-2024
|
1.50
|
Installed the Right Wing FlyLED Position/Strobe Li
|
Details
|
 |
|
09-15-2024
|
3.00
|
Completed FlyLED 7-Star Landing/Taxi Lights
|
Details
|
|
|
09-13-2024
|
4.00
|
Right Wing Tip Position and Strobe Installation
|
Details
|
|
|
09-13-2024
|
1.00
|
Made Wiring Loom to Connect Tip Lights to Harness
|
Details
|
 |
|
09-12-2024
|
4.00
|
Left Wing Tip Position and Strobe Installation
|
Details
|
|
|
09-12-2024
|
0.00
|
Left Wing Tip Position and Strobe Installation
|
Details
|
|
|
08-23-2024
|
3.00
|
Soldered Strobe LEDs to Wing Tip PCBs
|
Details
|
|
|
08-09-2024
|
3.00
|
Installed the Nutplates in the Right Wing Tip Fair
|
Details
|
  |
|
08-08-2024
|
1.50
|
Mounted Bob Archer VOR/ILS Antenna
|
Details
|
|
|
08-07-2024
|
2.00
|
Drilled and Countersunk Left Tip Top Nutplate Hole
|
Details
|
  |
|
08-06-2024
|
2.00
|
Drilled and Countersunk Left Tip Bottom Nutplate H
|
Details
|
 |
|
08-01-2024
|
1.00
|
Riveted the Left Wing Tip Aft Rib in Place
|
Details
|
|
|
07-15-2024
|
1.50
|
Riveted the Nutplates to the Left Wing Tip
|
Details
|
|
|
07-10-2024
|
3.50
|
Drilled Wing Skins Holes to #27 and Dimpled
|
Details
|
|
|
07-09-2024
|
3.00
|
Finished Fitting Lens to Right Wing Tip
|
Details
|
|
|
07-08-2024
|
1.50
|
Continued Fitting the Right Wing Tip Lens
|
Details
|
|
|
07-06-2024
|
2.50
|
Trimmed Right Wing Tip to Fit Wing
|
Details
|
|
|
07-04-2024
|
4.00
|
Trimmed and Installed the Left Wing Tip Lens
|
Details
|
|
|
06-29-2024
|
2.00
|
Marked the Left Wing Tip for Trimming
|
Details
|
  |
|
06-19-2024
|
4.00
|
Repositioned the spar gap seal stiffeners
|
Details
|
 |
|
06-18-2024
|
1.50
|
Installed the Ailerons on the Wings
|
Details
|
 |
|
06-11-2024
|
5.00
|
Fabricated the Right Fwd/Aft Torque Tube Assembly
|
Details
|
|
|
06-10-2024
|
2.00
|
Attached Push/Pull Torque Tube to Aileron Bellcran
|
Details
|
|
|
06-09-2024
|
2.00
|
Installed Left Wing Fwd and Aft Torque Tube Assemb
|
Details
|
|
|
06-05-2024
|
2.00
|
Repair Welded Aileron Torque Tubes
|
Details
|
 |
|
06-02-2024
|
1.50
|
Drilled the Aileron Push Tubes to Threaded Ends
|
Details
|
  |
|
05-30-2024
|
1.50
|
Added Rodbearing Ends to Push/Pull Tubes
|
Details
|
|
|
05-20-2024
|
1.00
|
Applied Yellow Paint to Exterior of Push/Pull Tube
|
Details
|
|
|
05-19-2024
|
4.00
|
Fabricated Aileron Push Pull Tubes
|
Details
|
|
|
05-15-2024
|
0.00
|
Finishing Kit Inventoried
|
Details
|
  |
|
03-22-2024
|
2.00
|
Double Riveted the Aft Edges of Both Ailerons
|
Details
|
  |
|
03-09-2024
|
6.00
|
Finished Assembly of the Left Aileron Except Aft E
|
Details
|
  |
|
03-06-2024
|
1.00
|
Removed the Aieron Twist in the Left
|
Details
|
  |
|
03-03-2024
|
8.00
|
Riveted the Right Aileron Bottom Skin to Spar
|
Details
|
 |
|
02-29-2024
|
2.00
|
Attached the Left Trailing Edge to the Aileron Ski
|
Details
|
 |
|
02-27-2024
|
8.00
|
Finished Riveting the Left Aileron Except Aft Edge
|
Details
|
|
|
02-17-2024
|
4.00
|
Dimpled Aileron Skins and Framework Parts
|
Details
|
  |
|
02-16-2024
|
8.00
|
Primed Aileron Interior Parts
|
Details
|
|
|
02-15-2024
|
3.00
|
Cut, Ground, and Deburred Aileron Stiffeners
|
Details
|
 |
|
02-14-2024
|
7.00
|
Drilled the Aileron Counterweights
|
Details
|
|
|
02-13-2024
|
8.00
|
Riveted Aileron Rib Sub-assembles
|
Details
|
|
|
02-12-2024
|
4.00
|
Assembled Both Ailerons' Ribs
|
Details
|
 |
|
02-11-2024
|
0.50
|
Separated A-1005/1006/1007/1008 Sub-parts
|
Details
|
 |
|
02-06-2024
|
4.00
|
Finished Assembly of the Flaps
|
Details
|
|
|
01-17-2024
|
2.00
|
Installation of the Flap Trailing Edge Wedge-Redo
|
Details
|
  |
|
01-14-2024
|
4.00
|
Clecoed the Flaps Trailing Edge Wedges in Place
|
Details
|
|
|
01-13-2024
|
4.00
|
Blind Riveted the Flaps Nose Skins to the Nose Rib
|
Details
|
|
|
01-03-2024
|
4.00
|
Riveted the Flaps Top Slins and Nose Skin to Spar
|
Details
|
|
|
01-02-2024
|
0.00
|
Routered a Channel for a 6' Cold Rolled Steel Bar
|
Details
|
|
|
01-01-2024
|
1.50
|
Riveted the FlapsTop Skinsto the Ribs
|
Details
|
|
|
12-26-2023
|
1.00
|
Riveted Flap Top Skins to the Ribs
|
Details
|
|
|
12-22-2023
|
3.00
|
Riveted the FlapTop and Nose Skins to the Spar
|
Details
|
|
|
12-21-2023
|
5.00
|
Riveted the Ribs and Hinges to the Flap Spars
|
Details
|
|
|
12-21-2023
|
1.50
|
Clecoed FlapTop Skins and Nose Skins
|
Details
|
|
|
12-20-2023
|
6.00
|
Riveted Flap Hinges and Inboard Nose Ribs
|
Details
|
|
|
12-20-2023
|
0.00
|
Pressed in the wing flap brass hinge bushings.
|
Details
|
|
|
12-10-2023
|
2.00
|
Scuffed Flaps Nose Skins and Flap Skins
|
Details
|
|
|
12-09-2023
|
8.00
|
Scuffed Right Flap Frame Parts with Eko Etch
|
Details
|
 |
|
12-08-2023
|
4.00
|
Scuffed Left Flap Frame Parts woth Eko Etch
|
Details
|
  |
|
12-07-2023
|
0.00
|
Built a Spray Table for Spraying Primer on Parts
|
Details
|
|
|
11-29-2023
|
4.00
|
Scuffed and Dimpled All Parts of the Right Flap
|
Details
|
|
|
11-23-2023
|
1.00
|
Deburred the Insides of the Right Flap Skins
|
Details
|
  |
|
11-17-2023
|
2.50
|
Finished Dimpling the Left Flap Frame Attachments
|
Details
|
 |
|
11-16-2023
|
1.25
|
Dimpled Left Flap Frame Parts
|
Details
|
 |
|
11-13-2023
|
4.00
|
Countersunk the Flap Hinge Pairs' Match Drill Hole
|
Details
|
|
|
11-10-2023
|
4.00
|
Assembled the Right Flap
|
Details
|
 |
|
11-08-2023
|
3.00
|
Coutersunk Both Sides of the Aft Flap Skin Wedges
|
Details
|
|
|
11-07-2023
|
10.00
|
Assembled the Left Flap
|
Details
|
|
|
11-07-2023
|
0.00
|
Assembled Left Flap
|
Details
|
|
|
11-06-2023
|
5.00
|
Assembled Frames for the Right & Left Flaps
|
Details
|
|
|
10-22-2023
|
2.00
|
Deburred Left Flap Spar and FL-1007 L&R Hinges
|
Details
|
|
|
10-21-2023
|
8.00
|
Started Flaps Construction
|
Details
|
 |
|
10-13-2023
|
0.00
|
Fuselage Inventory Finished
|
Details
|
  |
|
10-12-2023
|
0.00
|
Fuselage Inventory continues
|
Details
|
  |
|
10-11-2023
|
0.00
|
Fuselage Inventory continues
|
Details
|
  |
|
10-10-2023
|
0.00
|
Fuselage Inventory
|
Details
|
  |
|
10-09-2023
|
0.00
|
Checked Inventory for Laser Cut Parts
|
Details
|
  |
|
10-06-2023
|
0.00
|
Uncrated Fuselage Kit
|
Details
|
  |
|
09-27-2023
|
2.50
|
Finished Closing the Left Wing
|
Details
|
|
|
09-26-2023
|
2.00
|
Left Bottom Skins Riveted Except Overlap
|
Details
|
 |
|
09-22-2023
|
4.00
|
Essentially Finished Closing Left Bottom Wing
|
Details
|
|
|
09-20-2023
|
3.00
|
Riveted the Aft 1/2 of Lt Wing Outbd Bottom Skin
|
Details
|
 |
|
09-18-2023
|
2.00
|
Riveted Inboard Bottom Skin to the Wing
|
Details
|
 |
|
09-15-2023
|
1.50
|
Installed Pitot Mast in Left Wing
|
Details
|
|
|
09-15-2023
|
25.00
|
Installed Nutplates on Inboard edge of Right Wing
|
Details
|
|
|
09-15-2023
|
0.50
|
Drilled Holes and Installed Snap Bushings
|
Details
|
|
|
09-14-2023
|
8.00
|
Finished Attaching the Rt Wing Bottom Wing Skins
|
Details
|
 |
|
09-11-2023
|
4.00
|
Riveted the Rt Outboard Bottom Skin Aft Half
|
Details
|
|
|
09-10-2023
|
2.00
|
Riveted Rt Bottom J-box Stiffener-Short to the Ski
|
Details
|
  |
|
08-25-2023
|
2.00
|
Riveted Left Wing Top Row of the Gap Seals
|
Details
|
|
|
08-07-2023
|
0.50
|
Clecoed the Ouboard Bottom Skins to the Wings
|
Details
|
|
|
08-06-2023
|
4.00
|
Riveted the Rt Wing Inbd Bottom Wing Skin
|
Details
|
|
|
08-05-2023
|
2.50
|
Riveted the Aft Half of the Inbd Bottom Wing Skin
|
Details
|
 |
|
08-01-2023
|
1.00
|
Secured Wires in the Wngs with Zip Ties
|
Details
|
  |
|
07-31-2023
|
3.00
|
Added An Extra Set of Wiring Holes in Both Wings
|
Details
|
|
|
07-30-2023
|
2.00
|
Attached the AHRS Tray to the Lt J-Stiffener-short
|
Details
|
 |
|
07-29-2023
|
2.50
|
Riveted the AHRS Tray Together
|
Details
|
|
|
07-27-2023
|
3.00
|
Riveted the Flaps and Aileron Gap Seals to Wings
|
Details
|
|
|
07-26-2023
|
3.00
|
Wash Primed the Inside of the Lower Skins
|
Details
|
|
|
07-25-2023
|
3.00
|
Dimpled the Lower Skins
|
Details
|
|
|
07-23-2023
|
3.00
|
Taper Filed the Inbd and Outbd Skins Lap Joint
|
Details
|
|
|
07-23-2023
|
0.00
|
Primed Lower Skin Lap Joints
|
Details
|
|
|
07-22-2023
|
2.50
|
Assembled the AHRS Tray Per Instructions
|
Details
|
  |
|
07-20-2023
|
1.00
|
Dimpled the Aileron and Flap Gap Seals
|
Details
|
  |
|
07-19-2023
|
0.25
|
Attached Outboard Left Wing Lights Connector
|
Details
|
  |
|
06-27-2023
|
0.00
|
Modified RV-8 Wing Cradle for the RV-14
|
Details
|
 |
|
06-27-2023
|
0.00
|
AntiSpat Drill Press Bead Breaker Works Great
|
Details
|
 |
|
06-18-2023
|
1.50
|
Ran the Right Wing Lighting Harness
|
Details
|
|
|
06-15-2023
|
2.00
|
Connected the AP Harness Wires to the Connectors
|
Details
|
|
|
06-14-2023
|
2.50
|
Started the Installation of Wing Wiring Harnesses
|
Details
|
|
|
05-28-2023
|
1.00
|
Finished Fuel Tank Bolts and Screws Installation
|
Details
|
  |
|
05-27-2023
|
1.50
|
Bolted the Right Fuel Tank to the Spar
|
Details
|
  |
|
05-26-2023
|
1.50
|
Bolted the Left Fuel Tank to the Spar
|
Details
|
  |
|
05-25-2023
|
3.00
|
Screwed The Left Fuel Tanks ontoThe Spar
|
Details
|
|
|
05-17-2023
|
1.00
|
Sealed the Leak in the Right Fuel Tank
|
Details
|
|
|
05-17-2023
|
0.50
|
Fuel Tanks Don't Leak!
|
Details
|
  |
|
05-15-2023
|
1.00
|
Repeat Leak Checked the Right Fuel Tank
|
Details
|
  |
|
05-11-2023
|
0.50
|
Leak Tested the Right Fuel Tank
|
Details
|
  |
|
05-10-2023
|
2.00
|
Installed Tank Fittings in Both Fuel Tanks
|
Details
|
  |
|
05-08-2023
|
2.50
|
Attached the Z-Brackets to the Fuel Tanks
|
Details
|
|
|
05-07-2023
|
4.00
|
Attached the Rear Baffle to the Left Tank
|
Details
|
  |
|
05-06-2023
|
4.00
|
Attached Rear Baffle to the Right Fuel Tank
|
Details
|
|
|
03-14-2023
|
3.00
|
Installed the Fuel Level Senders in the Tanks
|
Details
|
|
|
03-11-2023
|
1.00
|
Fitted the Fuel Level Senders to the Tanks
|
Details
|
  |
|
03-09-2023
|
0.75
|
Attached Nutplates to the Inboard Tank Edges
|
Details
|
  |
|
03-05-2023
|
3.50
|
Installed the T-1003B L&R In Fuel Tanks
|
Details
|
|
|
03-05-2023
|
0.50
|
Installed Fuel Vent Lines in the L&R Fuel Tanks
|
Details
|
|
|
02-24-2023
|
3.00
|
Inspected Fuel Tanks for Sealant Coverage
|
Details
|
  |
|
02-22-2023
|
1.00
|
Installed Right Tank Attachment Sub-assembly
|
Details
|
 |
|
02-22-2023
|
3.00
|
Installed Outbd Tank Rib and J-Channel Stiffener
|
Details
|
|
|
02-21-2023
|
2.00
|
Installed the 5th Internal Rib of Right Tank
|
Details
|
|
|
02-21-2023
|
3.00
|
Installed the 3rd and 4th Internal Ribs of Rt Tank
|
Details
|
|
|
02-20-2023
|
1.50
|
Installed the 2nd Internal Rib of the Right Tank
|
Details
|
|
|
02-19-2023
|
1.50
|
Installed the Outboard Internal Rib of Left Tank
|
Details
|
|
|
02-18-2023
|
8.00
|
Attached Inbd Fwd Rib and Attachment Bracket
|
Details
|
|
|
02-07-2023
|
3.50
|
Installed the 6th and Outboard Ribs in the Lt Tank
|
Details
|
|
|
02-06-2023
|
3.00
|
Installed the 4th and 5th Left Tank Ribs
|
Details
|
|
|
02-05-2023
|
5.00
|
Installed 2 Ribs in the Left Fuel Tank
|
Details
|
|
|
02-05-2023
|
1.50
|
Finished Riveting the Rt. Leading Edge to Spar
|
Details
|
|
|
02-02-2023
|
5.00
|
Riveted Rt Tank Stiffeners, Fuel Flanges & Drains
|
Details
|
|
|
02-02-2023
|
5.00
|
Riveted Lt Tank Stiffeners, Fuel Flanges & Drains
|
Details
|
|
|
02-01-2023
|
6.00
|
Started Assembly of the Left Fuel Tank
|
Details
|
|
|
01-30-2023
|
3.00
|
Prepared to Start Left Fuel Tank Assembly
|
Details
|
  |
|
01-26-2023
|
1.00
|
Prepared For Sealing the Tanks During Assembly
|
Details
|
  |
|
01-25-2023
|
4.00
|
Dimpled Both Fuel Tank Skins
|
Details
|
|
|
01-23-2023
|
3.00
|
Countersunk Rt Fuel Tank Rear Baffle/Skin
|
Details
|
|
|
01-22-2023
|
6.00
|
Started Re-install of the Rt Leading Edge
|
Details
|
|
|
01-22-2023
|
3.00
|
Started Left Fuel Tank Construction
|
Details
|
|
|
01-15-2023
|
2.00
|
Finished Removing the Right Leading Edge
|
Details
|
  |
|
01-14-2023
|
4.00
|
Fabricated the R & L Tank Attachment Assembly
|
Details
|
 |
|
01-12-2023
|
3.50
|
Fabricated the Fuel Tank Z-Brackets
|
Details
|
 |
|
01-11-2023
|
4.00
|
Rt LE Second Inbd Rib Not Clearing Spar Bar
|
Details
|
|
|
01-09-2023
|
3.00
|
Fabricated the Fuel Tank Stiffeners
|
Details
|
|
|
01-07-2023
|
4.00
|
Fluted the Fuel Tank Ribs
|
Details
|
  |
|
01-06-2023
|
4.00
|
Installed the Right Leading Edge
|
Details
|
|
|
01-06-2023
|
3.00
|
Fabricated the Right Landing Light Lens
|
Details
|
|
|
01-05-2023
|
3.00
|
Finished Left Wing Landing Light Lens Installation
|
Details
|
|
|
12-28-2022
|
4.00
|
Completed Riveting Lt Leading Edge to the Spar
|
Details
|
|
|
12-22-2022
|
5.00
|
Riveted the Left Leading Edge to the Left Spar
|
Details
|
|
|
12-20-2022
|
3.00
|
Installed the Stall Warning Device in the Left Win
|
Details
|
|
|
12-20-2022
|
3.00
|
Installed Left Spar Outboard Aileron Hinge
|
Details
|
|
|
12-15-2022
|
4.00
|
Finished Riveting Right Leaading Edge Skins
|
Details
|
|
|
12-14-2022
|
3.00
|
Riveted the Top of the Right Leading Edge Skin
|
Details
|
|
|
12-13-2022
|
5.00
|
Finished Riveting Left Leading Edge
|
Details
|
|
|
12-05-2022
|
1.00
|
Riveted VA-195C and W-00017 to Lt Leading Edge
|
Details
|
|
|
12-04-2022
|
5.00
|
Riveted Most of the Left Leading Edge Together
|
Details
|
|
|
12-03-2022
|
2.50
|
Installed Nutplates in Leading Edge Parts
|
Details
|
|
|
12-01-2022
|
1.00
|
Painted Outboard Bay Parts Gloss White
|
Details
|
|
|
11-23-2022
|
3.00
|
Primed All Leading Edge Parts
|
Details
|
  |
|
11-22-2022
|
5.00
|
Scratched Lead Edge Parts For Priming
|
Details
|
  |
|
11-18-2022
|
0.50
|
Deburred/Dimpled VA 195 C & D
|
Details
|
  |
|
11-15-2022
|
3.00
|
Riveted the Rear Spar Row of the Right Top Skins
|
Details
|
|
|
11-13-2022
|
3.00
|
Riveted Top Skns of the Right Wing
|
Details
|
|
|
11-12-2022
|
4.00
|
Assembled the Right Leading Edge
|
Details
|
 |
|
11-11-2022
|
6.00
|
Started work on the Left Wing Leading Edge
|
Details
|
|
|
11-10-2022
|
3.00
|
Fluted the W-1008 and W-1009 Leading Edge Ribs
|
Details
|
|
|
11-09-2022
|
0.25
|
Riveted the Left Aileron Outboard Hinge to Rear Sp
|
Details
|
 |
|
11-08-2022
|
2.00
|
Finished Empennage Kit Inventory
|
Details
|
  |
|
11-07-2022
|
6.00
|
Empennage Inventory Continues
|
Details
|
  |
|
11-06-2022
|
2.00
|
Unpacked the Empennage Crate/Inventoried Parts
|
Details
|
  |
|
11-05-2022
|
4.00
|
Started Riveting the Right Spar Top Skins
|
Details
|
|
|
10-25-2022
|
1.50
|
Riveted Top Skins Forwardmost Rivets/Empennage Arr
|
Details
|
|
|
10-24-2022
|
1.00
|
Drilled Out Bad Rivets in the Left Wing Top Skins
|
Details
|
  |
|
10-19-2022
|
1.50
|
Riveted the Trailing Edge of the Top Skins
|
Details
|
 |
|
10-03-2022
|
1.50
|
Drilled Out Bad Rivets In Left Spar Top Skins
|
Details
|
  |
|
09-30-2022
|
1.00
|
Drilled Out Bad Rivets From the Left Spar Top Skin
|
Details
|
  |
|
09-28-2022
|
1.00
|
Clecoed the Right Spar Top Skins to the Ribs
|
Details
|
 |
|
09-27-2022
|
7.00
|
Deburred Right Spar Top Skins
|
Details
|
|
|
09-21-2022
|
1.00
|
Countersunk Common Holes of Inbd Top Skin
|
Details
|
|
|
09-20-2022
|
3.50
|
Completed Right Rear Spar Assembly
|
Details
|
|
|
09-19-2022
|
3.50
|
Riveted Inboard Ribs to the Right Spar
|
Details
|
|
|
09-18-2022
|
1.00
|
Inserted Snap Bushings in the Right Wing Ribs
|
Details
|
  |
|
09-08-2022
|
4.00
|
Riveted Most of the Left Wing top Skins
|
Details
|
|
|
09-07-2022
|
2.50
|
Clecoed Ribs to the Rear Spar/Dimpled Ribs
|
Details
|
  |
|
08-31-2022
|
1.50
|
Clecoed Ribs to the Rear Spar/Dimpled Ribs
|
Details
|
  |
|
08-30-2022
|
2.00
|
Started Riveting the Top Aft Skins to the Left Spa
|
Details
|
  |
|
08-24-2022
|
0.00
|
Built A Table Using Adjustable Saw Horses
|
Details
|
|
|
08-19-2022
|
3.00
|
Attached Left Spar Top Skins to Ribs
|
Details
|
 |
|
08-16-2022
|
2.50
|
Primed the Top skins/Doublers/J-Channels
|
Details
|
 |
|
08-12-2022
|
1.00
|
Dimpled Top Holes in the Ribs
|
Details
|
  |
|
08-11-2022
|
2.00
|
Dimpled the Top Skins of the Left Wing
|
Details
|
 |
|
08-09-2022
|
4.00
|
Thinned Forward Overlap of Top Skins
|
Details
|
|
|
08-05-2022
|
7.00
|
Riveted the rear spar to the left spar rib
|
Details
|
|
|
08-04-2022
|
7.00
|
Riveted All Doublers to the Left Rear Spar
|
Details
|
|
|
08-03-2022
|
8.00
|
Fabricated the outboard aileron hinges.
|
Details
|
 |
|
07-23-2022
|
0.00
|
Oshkosh through July 30.
|
|
  |
|
07-22-2022
|
0.00
|
Packed Miss L for Oshkosh
|
|
  |
|
07-20-2022
|
2.50
|
Deburred rear spar and attachments
|
Details
|
  |
|
07-19-2022
|
3.00
|
Attached the Rear Spar to the Left Spar Rib
|
Details
|
|
|
07-18-2022
|
4.00
|
Assembled and Drilled W-1007 C/D/E Doublers for th
|
Details
|
|
|
07-17-2022
|
2.00
|
Riveted the Inboard Aileron Hinges together
|
Details
|
|
|
07-15-2022
|
2.50
|
Assembled SB 16-03-28 for Inboard Aileron Hinge Br
|
Details
|
  |
|
07-09-2022
|
3.50
|
Riveted Ribs to Left Spar
|
Details
|
|
|
07-08-2022
|
1.00
|
Inserted Bolt Hardware into the Ribs of the Left S
|
Details
|
  |
|
07-07-2022
|
2.50
|
Clecoed the Ribs to the Left Spar
|
Details
|
 |
|
07-06-2022
|
2.00
|
Riveted the Flap Hinges to the #3 and #8 Ribs
|
Details
|
 |
|
07-05-2022
|
10.00
|
Scuffed/Washed/Primed Ribs using SW Wash Primer.
|
Details
|
|
|
06-24-2022
|
2.50
|
Attached Ribs to Left Spar
|
Details
|
|
|
06-23-2022
|
1.00
|
Deburred and Smoothed Left Spar Flap Hinge Bracket
|
Details
|
|
|
06-21-2022
|
3.00
|
Drilled Torque Tube Support and Flap Brackets
|
Details
|
  |
|
06-19-2022
|
1.50
|
Dimpled the lower flanges of the right spar ribs.
|
Details
|
  |
|
06-17-2022
|
1.50
|
Dimpled lower flanges of the left spar ribs.
|
Details
|
  |
|
06-16-2022
|
2.50
|
Deburred the edges of the ribs.
|
Details
|
  |
|
06-15-2022
|
4.00
|
Finished Fluting all ribs.
|
Details
|
  |
|
06-14-2022
|
1.00
|
Fluted W-1010 + 1011 + 1012 Ribs
|
Details
|
  |
|
06-13-2022
|
1.00
|
Separated and Processed W1029 C and W1029D
|
Details
|
  |
|
06-12-2022
|
0.00
|
Constructed a Wing Tank Cradle
|
Details
|
  |
|
06-10-2022
|
0.00
|
Removed the RV-8A Left Fuel Tank from RV-8A
|
Details
|
  |
|
06-09-2022
|
10.00
|
Started/Completed Right Spar Preparation.
|
Details
|
  |
|
06-06-2022
|
2.50
|
Countersunk the #8 Tank Attachment Holes
|
Details
|
|
|
06-04-2022
|
3.00
|
Riveted the nutplates to the left spar flanges per
|
Details
|
  |
|
06-02-2022
|
3.00
|
Match drilled the #40 holes of the spar flanges.
|
Details
|
|
|
06-01-2022
|
2.00
|
Fabricated the J-Channels for the Left Spar
|
Details
|
|
|
05-31-2022
|
1.00
|
Reviewed Plans
|
Details
|
  |
|
05-30-2022
|
1.00
|
Started RV-14A Project
|
Details
|
 |
|
04-14-2022
|
0.00
|
Wing Kit Arrives
|
Details
|
|