Date
  | 
	Hours
  | 
	Work Log Summary 
		 
  | 
	Details 
		 
  | 
	
		
	
	 12-23-2021
  | 
	1.00
  | 
	Done
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-23-2021
  | 
	4.00
  | 
	blead breaks
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-19-2021
  | 
	5.00
  | 
	gear bushing
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-18-2021
  | 
	5.00
  | 
	remade right front strut.
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-12-2021
  | 
	4.00
  | 
	Worked on center consol, added windshieild tabs
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-11-2021
  | 
	3.00
  | 
	installed inspection covers
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-04-2021
  | 
	2.00
  | 
	installed data plack and switch plackards
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-02-2021
  | 
	2.00
  | 
	body work and paint on fuel caps
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-01-2021
  | 
	2.00
  | 
	Fuel cap
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-28-2021
  | 
	5.00
  | 
	Weighed and added graphic wrap to center consol
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-27-2021
  | 
	2.00
  | 
	Drained tanks for weighing
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-26-2021
  | 
	5.00
  | 
	Calibrated Dynon Compass, washed the plane.
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-25-2021
  | 
	3.00
  | 
	Hooked up elevator Trim indicator and Number
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-21-2021
  | 
	3.00
  | 
	Nav lights hooked up
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-20-2021
  | 
	4.00
  | 
	tidy up wires
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-14-2021
  | 
	4.00
  | 
	sealed firewall, added aileron stops
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-13-2021
  | 
	4.00
  | 
	finihed batteries move and did run up
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-12-2021
  | 
	4.00
  | 
	moved batteries
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-06-2021
  | 
	4.00
  | 
	wired left nav light plug and moveing battery
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-30-2021
  | 
	4.00
  | 
	riging controls/ elevator VGs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-24-2021
  | 
	5.00
  | 
	mounted main gear tires
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-23-2021
  | 
	4.00
  | 
	rigging elevator controls
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-26-2021
  | 
	3.00
  | 
	made a cable tension gauge
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-25-2021
  | 
	2.00
  | 
	wireing light plug
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-12-2021
  | 
	4.00
  | 
	FINISHED SWEDGEING CABLES
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-11-2021
  | 
	9.00
  | 
	SWEDGED CABLE FITTTINGS
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-06-2021
  | 
	5.00
  | 
	Ran Control Cables
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-05-2021
  | 
	4.00
  | 
	elevator and rudder
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-05-2021
  | 
	4.00
  | 
	Batteries,  ELT
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-04-2021
  | 
	7.00
  | 
	Flapperrons
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-29-2021
  | 
	2.50
  | 
	MOUNTED LEFT FLAPERON
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-28-2021
  | 
	0.00
  | 
	WENT TO JUSTIN TISDALS FIRST FLIGHT
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-26-2021
  | 
	2.00
  | 
	LEFT SLAT
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-22-2021
  | 
	7.00
  | 
	RIGHT JURY STRUT AND SLAT INSTALLED
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-21-2021
  | 
	6.00
  | 
	REAR BOLTS AND WINGE ROOT CLOSURE
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-15-2021
  | 
	7.00
  | 
	JURY STRUTS AND REAR ACCESS PANNEL
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-08-2021
  | 
	8.00
  | 
	WING STRUTS
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-26-2021
  | 
	5.00
  | 
	SETTING WING DIHEDRAL AND SQUARE
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-25-2021
  | 
	3.00
  | 
	ATTACHED WINGS TO FUSALAGE
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-24-2021
  | 
	2.00
  | 
	POLISHED UNDER SIDE OF WINGS
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-04-2021
  | 
	3.00
  | 
	ATTACHED STRUT BRACKET TO STRUTS
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 06-27-2021
  | 
	2.00
  | 
	DRY FIT ELEVATOR AND RUDDER
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 06-20-2021
  | 
	4.00
  | 
	INSTALLED HORZONTAL AND REPLACED CONTROL BRACE
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-19-2021
  | 
	6.00
  | 
	MOVED TO HANGER
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-10-2021
  | 
	3.00
  | 
	FINAL INSTALL OB BUBBLE DOORS
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 06-09-2021
  | 
	2.00
  | 
	WIRED VIKING VIEW FINAL
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 06-07-2021
  | 
	3.00
  | 
	MADE RACK FOR VIKING VIEW DAQ
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-06-2021
  | 
	4.00
  | 
	PANTED DOOR FRAME
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-29-2021
  | 
	4.00
  | 
	BUILT A WING RACK
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-23-2021
  | 
	5.00
  | 
	AUTOPILOT SERVO - ELT
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-09-2021
  | 
	6.00
  | 
	WIRED AND INSTALLED PTT AND TRIM ON STICK
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-28-2021
  | 
	3.00
  | 
	WIRING ELT SERIAL PORT
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-25-2021
  | 
	7.00
  | 
	INSTALLING AVIONICS
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-18-2021
  | 
	6.00
  | 
	WIRING AVIONICS
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-11-2021
  | 
	8.00
  | 
	INSTALLING ADARHS AND TRANSPONDERS
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-09-2021
  | 
	3.00
  | 
	DOOR HARDWARE
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-04-2021
  | 
	4.00
  | 
	BUBBLE DOORS
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-03-2021
  | 
	4.00
  | 
	BUBBLE DOORS
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-25-2021
  | 
	3.00
  | 
	INSTALLED DYNON AND OTHER PARTS
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-20-2021
  | 
	6.00
  | 
	FINAL INSTALL OF WINDSHILD AND ROOF
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-15-2021
  | 
	3.00
  | 
	INSTALLED DYNON AND OTHER PARTS
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-14-2021
  | 
	5.00
  | 
	INSTALLED WINDSHILD AND MOON ROOF
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-13-2021
  | 
	4.00
  | 
	INSTALLED WINDSHILD AND MOON ROOF
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-12-2021
  | 
	3.00
  | 
	RECIVED DYNON AND REGESTERD
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-06-2021
  | 
	6.00
  | 
	INSTALLED VIKING VIEW AND FIRST RUN WITH PROP
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-28-2021
  | 
	2.00
  | 
	CUTTING PANEL
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-21-2021
  | 
	4.00
  | 
	INSTALLED SEAT BELTS
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-20-2021
  | 
	2.00
  | 
	INSTALL PROP AND SET PITCH
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-23-2021
  | 
	5.00
  | 
	INSTALLED PARKING BREAK
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-16-2021
  | 
	2.00
  | 
	PANEL LAYOUT
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-09-2021
  | 
	6.00
  | 
	PAINTED THE COWL AND DRY FITTED TAIL FEATHERS
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-02-2021
  | 
	3.00
  | 
	ADDED LATCHES TO HELP LOCATE
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-27-2020
  | 
	2.00
  | 
	TESTING FUEL GAUGE
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-23-2020
  | 
	2.00
  | 
	ADDING BRACKET TO RUDDRER
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-20-2020
  | 
	4.00
  | 
	PRIMED THE COWL
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-19-2020
  | 
	5.00
  | 
	ADDED FIRE SLEEVE AND FLOW METER
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-06-2020
  | 
	2.00
  | 
	BODY WORK ON COWL.
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-24-2020
  | 
	6.00
  | 
	PAINTED RUDDER AD ADDED ORANGE STRIPE
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-14-2020
  | 
	6.00
  | 
	PAINTNG LIGHT BLUE
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-08-2020
  | 
	8.00
  | 
	PAINTING THE FUSALAGE
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-07-2020
  | 
	8.00
  | 
	COWL FITTING DAY TWO
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-30-2020
  | 
	12.00
  | 
	FITTING THE COWL
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-24-2020
  | 
	6.00
  | 
	Prep fusalage for paint
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-03-2020
  | 
	8.00
  | 
	painting f winges
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-23-2020
  | 
	4.00
  | 
	STARTED PAINTNG THE ELEVATOR
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-23-2020
  | 
	4.00
  | 
	PRIMED WINGS
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-20-2020
  | 
	8.00
  | 
	PREP FOR PAINT AND STARTED PAINTING
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-06-2020
  | 
	4.00
  | 
	JUST CLEANING THINGS UP
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-21-2020
  | 
	2.00
  | 
	ENGINE DEMO
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-15-2020
  | 
	8.00
  | 
	WIRINGE ENGINE
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-15-2020
  | 
	3.00
  | 
	FIRST START
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-11-2020
  | 
	3.00
  | 
	RUNNING FULE LINES TO ENGINE
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-11-2020
  | 
	5.00
  | 
	INSTALLING CENTER CONSOLE AND MAIN ENGINE BUSS
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-01-2020
  | 
	6.00
  | 
	MOUNTED RADATOR AND RAN WIREING
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-26-2020
  | 
	5.50
  | 
	Left Top Wing skin
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-25-2020
  | 
	4.00
  | 
	Riveted top Skin on
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-23-2020
  | 
	15.00
  | 
	Wiring center console and engine
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-19-2020
  | 
	4.00
  | 
	Top skin L doubler and Tank Gauge sender mout
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-18-2020
  | 
	6.00
  | 
	Wing Skin Doubler
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-12-2020
  | 
	1.50
  | 
	installed L  doubler to flaperon mounts
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-11-2020
  | 
	5.00
  | 
	Wiring for engine
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-04-2020
  | 
	4.00
  | 
	fitting fuel tank and inner
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-03-2020
  | 
	3.50
  | 
	Wings leding edge
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-02-2020
  | 
	3.00
  | 
	Lower skin and
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-21-2020
  | 
	4.50
  | 
	Top skin
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-20-2020
  | 
	6.50
  | 
	Left wing lowr skin and front
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-14-2020
  | 
	6.45
  | 
	Rear spar for left wing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-13-2020
  | 
	7.00
  | 
	Left Wing Ribs and spars
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-06-2020
  | 
	7.00
  | 
	FINISHED WING
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-04-2020
  | 
	2.00
  | 
	FULE TANK TEST
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-30-2020
  | 
	4.00
  | 
	WIRED FUEL GAUGE AND ADDED WING TIP
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-26-2020
  | 
	1.00
  | 
	Wings clean up
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-25-2020
  | 
	7.00
  | 
	installed flaperon brackets and top skin
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-25-2020
  | 
	1.00
  | 
	finish uper skin
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-24-2020
  | 
	4.00
  | 
	installing fuel tank
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-24-2020
  | 
	3.00
  | 
	Cutting hole for Fuel Gauge Sender
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-18-2020
  | 
	4.00
  | 
	Installed strut and jury strut brackets and front 
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-17-2020
  | 
	2.00
  | 
	test fit raditor parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-09-2020
  | 
	3.00
  | 
	Deburing wings
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-03-2020
  | 
	4.00
  | 
	Drilling more holes
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-02-2020
  | 
	6.00
  | 
	drilling top skins
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-29-2020
  | 
	2.00
  | 
	Left wing
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-26-2020
  | 
	1.50
  | 
	WINGS
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-25-2020
  | 
	7.00
  | 
	WING BOTTOM SKIN
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-24-2020
  | 
	2.00
  | 
	REAR SPAR CONSTRUCTION
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-23-2020
  | 
	1.50
  | 
	REAR SPAR
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-22-2020
  | 
	2.00
  | 
	added last rib and end spar
  | 
	
			Details 
		 | 
	
	 		  
		        | 
 
	
  | 
	
	
	 04-21-2020
  | 
	1.50
  | 
	added two more ribs
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-20-2020
  | 
	2.00
  | 
	Ataching Wing Ribs to Main spar
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-19-2020
  | 
	5.00
  | 
	Made Wing nose ribs wih slat brackets
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-14-2020
  | 
	1.50
  | 
	cleco a few parts in place to find all parts
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-12-2020
  | 
	1.00
  | 
	unboxing wing components
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-12-2020
  | 
	4.00
  | 
	Square tubing for wing jig
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-12-2020
  | 
	3.00
  | 
	Pasenger inboard Flaperron Ribs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-12-2020
  | 
	2.00
  | 
	Cleaned Work Table and organised tools
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-11-2020
  | 
	6.00
  | 
	Pasenger inboard Flaperron
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-10-2020
  | 
	2.00
  | 
	Pasenger inboard Flaperron Ribs
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-22-2020
  | 
	7.00
  | 
	Left OutBoard flaperon
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-09-2020
  | 
	2.00
  | 
	PULLED RIVETS
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-08-2020
  | 
	4.00
  | 
	DEBURED AND CROSSIONS COATED PARTS
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-07-2020
  | 
	3.00
  | 
	DRILLING INBORD SKIN
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-07-2020
  | 
	4.00
  | 
	BUIDING FLAPERON RIB
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-01-2020
  | 
	4.00
  | 
	slats
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-29-2020
  | 
	6.00
  | 
	slats
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-26-2020
  | 
	1.25
  | 
	Slats
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-22-2020
  | 
	1.50
  | 
	Mounted Engine
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-18-2020
  | 
	2.00
  | 
	finished first slat
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-16-2020
  | 
	2.50
  | 
	fitted some tiny roll around tires
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-15-2020
  | 
	3.50
  | 
	Slats firs quater
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-15-2020
  | 
	3.50
  | 
	1/4 slats
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-13-2020
  | 
	1.00
  | 
	Slats
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-12-2020
  | 
	3.00
  | 
	Installed Table Top on to Work Stand
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-09-2020
  | 
	5.00
  | 
	Building work table for wings
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-02-2020
  | 
	16.00
  | 
	Trailer Storage, wheels on
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-12-2020
  | 
	6.00
  | 
	Mounted Landing Gear and Tires
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-10-2020
  | 
	1.50
  | 
	Recived Viking 130 Engine
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-08-2020
  | 
	3.00
  | 
	Fitting landing gear and wheels
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-05-2020
  | 
	4.50
  | 
	controls and landing gear
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-04-2020
  | 
	3.00
  | 
	FLAPERON AND ELEVATOR CONTROLS
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-31-2019
  | 
	6.00
  | 
	Dash panel and insterment shelf
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-30-2019
  | 
	4.00
  | 
	Pasenger Seat
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-30-2019
  | 
	2.00
  | 
	Cut out dash panel for insert
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-29-2019
  | 
	4.00
  | 
	Pasenger side seat floor striker plate and seatbel
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-28-2019
  | 
	4.00
  | 
	Seat stuff
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-27-2019
  | 
	2.00
  | 
	Added 3 of the 4 Door frame striker plates
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-25-2019
  | 
	2.00
  | 
	Started Avionics shelf
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-24-2019
  | 
	3.00
  | 
	Installed Rudder mounts
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-23-2019
  | 
	2.00
  | 
	Left 75F17-6 and 75F12-6
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-21-2019
  | 
	4.00
  | 
	Right door frame andwunroof frame
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-21-2019
  | 
	2.00
  | 
	Installed A6 rivets in Fusulage
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-21-2019
  | 
	1.00
  | 
	Atached 75N1-4
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-17-2019
  | 
	2.00
  | 
	Ran cables
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-15-2019
  | 
	5.00
  | 
	INSTALLED 75F2-5 75F2-6 BOTH SIDES
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-14-2019
  | 
	2.00
  | 
	Riveting back half of Fuselage
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-12-2019
  | 
	2.00
  | 
	Riveted top skin on
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-08-2019
  | 
	3.00
  | 
	Installed top skin and ran antenna cable
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-03-2019
  | 
	2.50
  | 
	Installed VHF Com Antenna
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-02-2019
  | 
	0.15
  | 
	Antenna assembly
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-01-2019
  | 
	3.00
  | 
	Final Header Tank Fittings
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-30-2019
  | 
	4.00
  | 
	AN fittings and Tubing for Header Tank
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-25-2019
  | 
	1.00
  | 
	AN fitting and Fuel line form wings
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-24-2019
  | 
	7.00
  | 
	Header tank mounts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-23-2019
  | 
	8.00
  | 
	Header Tank install
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-19-2019
  | 
	1.25
  | 
	Removed top skin
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-17-2019
  | 
	4.00
  | 
	Torqued motor mount and polished
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-16-2019
  | 
	6.00
  | 
	Glare shield instalation
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-15-2019
  | 
	2.00
  | 
	installed internal motor mounts
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-15-2019
  | 
	1.50
  | 
	Installed Brackets and Seat Back
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-14-2019
  | 
	2.00
  | 
	Installed gusets 75F10-6
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-11-2019
  | 
	2.00
  | 
	Final install of firewall
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-10-2019
  | 
	3.50
  | 
	Brake Lines and master Cylender assembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-06-2019
  | 
	3.00
  | 
	Nose gear strut mount and fork
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-05-2019
  | 
	1.00
  | 
	lower noes gear strut mount
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-03-2019
  | 
	3.00
  | 
	motor mounts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-03-2019
  | 
	3.00
  | 
	
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-02-2019
  | 
	5.50
  | 
	Left D0or seal
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-27-2019
  | 
	4.00
  | 
	Bubbel Cabin Doubler Door Seal
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-26-2019
  | 
	4.00
  | 
	Mods for New Bubble Door
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-22-2019
  | 
	1.25
  | 
	Right Side control cover and Fule line
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-21-2019
  | 
	1.50
  | 
	Moved AN fuel Line Fitting and added Electrical
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-19-2019
  | 
	4.00
  | 
	Seat Floor and Sliding Seat
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-19-2019
  | 
	2.00
  | 
	running cables
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-19-2019
  | 
	1.00
  | 
	riveting flaparon control cover
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-19-2019
  | 
	2.00
  | 
	ran fuel lines and installed AN fittings
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-13-2019
  | 
	4.00
  | 
	Fuel Pumps and Flap motor wireing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-13-2019
  | 
	0.25
  | 
	Added 4 rivets to rear L brace
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-10-2019
  | 
	1.00
  | 
	More Parts
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-06-2019
  | 
	2.50
  | 
	installed L braces on left Seat frame,
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-06-2019
  | 
	2.50
  | 
	Front lower Landing gear mount
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-29-2019
  | 
	4.00
  | 
	Final assembly of center torque tube and set mout
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-24-2019
  | 
	2.00
  | 
	Bending parts for header tank
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-15-2019
  | 
	2.00
  | 
	Sliding seat option
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-08-2019
  | 
	6.50
  | 
	Left Landing Gear mount
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-08-2019
  | 
	2.00
  | 
	Installed Viiking Steel Bungee
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-07-2019
  | 
	3.00
  | 
	Right Landing Gear and Seat Frame
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-04-2019
  | 
	1.00
  | 
	Viking parts arived
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-01-2019
  | 
	6.00
  | 
	Right landing gear mount
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-31-2019
  | 
	2.00
  | 
	Fusulage Gusset
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-27-2019
  | 
	3.50
  | 
	Torque Tube Front Barring Support
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-26-2019
  | 
	2.00
  | 
	Inventory of parts
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-25-2019
  | 
	2.00
  | 
	Rear Torque Tube Mount
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-24-2019
  | 
	3.00
  | 
	Riveted  Rear Baggage Floor
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-17-2019
  | 
	3.00
  | 
	Optomised Garage
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-13-2019
  | 
	4.50
  | 
	Fuselage Caddy
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-03-2019
  | 
	4.00
  | 
	unloading truck
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-01-2019
  | 
	3.00
  | 
	Bought Kit
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-26-2019
  | 
	4.00
  | 
	Rudder Workshop Skin and final riveting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-25-2019
  | 
	6.00
  | 
	Zenith Rudder Work shop
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-03-2015
  | 
	3.00
  | 
	rudder pedal and brake assembly.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-30-2015
  | 
	1.00
  | 
	Started installing rudder pedals
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-28-2015
  | 
	4.00
  | 
	Re-attached forward & aft fuselages.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-28-2015
  | 
	4.00
  | 
	Modified seat side supports for better fit.  Rivet
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-27-2015
  | 
	4.00
  | 
	re-assembly of FF
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-26-2015
  | 
	5.00
  | 
	forward fuselage
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-25-2015
  | 
	2.00
  | 
	Cortec to FF parts
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-24-2015
  | 
	2.00
  | 
	Deburred & scuffed FF parts.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-23-2015
  | 
	2.00
  | 
	Scuffed & applied Cortec to FF parts
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-22-2015
  | 
	3.00
  | 
	Scuffed & applied Cortec to some parts
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-21-2015
  | 
	2.00
  | 
	Deburred & scuffed components of the forward fusel
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-19-2015
  | 
	3.00
  | 
	Deburred & scuffed components of the forward fusel
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-16-2015
  | 
	2.00
  | 
	Misc work on aft fuselage
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-29-2015
  | 
	4.00
  | 
	Fitted & drilled 75F6-6
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-21-2015
  | 
	3.00
  | 
	Disassembled forward fuselage,
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-20-2015
  | 
	4.00
  | 
	right seat base& supports.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-19-2015
  | 
	6.00
  | 
	left seat base
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-18-2015
  | 
	6.00
  | 
	Fitted supports & left seat base
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-17-2015
  | 
	1.00
  | 
	Finished doublers.  Started L angles
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-16-2015
  | 
	1.00
  | 
	Continued with doublers
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-15-2015
  | 
	1.00
  | 
	Started fitting & drilling gear channel doublers
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-12-2015
  | 
	1.00
  | 
	gear strut fittings
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-11-2015
  | 
	3.00
  | 
	Finished fitting & pilot drilling center console.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-07-2015
  | 
	3.00
  | 
	L angles on forward top skin
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-06-2015
  | 
	4.00
  | 
	Fitted upper and lower engine mounts.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-05-2015
  | 
	2.00
  | 
	Forward side angles.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-03-2015
  | 
	3.00
  | 
	Fitted firewall & forward side skins & forward fus
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-02-2015
  | 
	6.00
  | 
	Fitted & drilled cabin frame gussets.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-01-2015
  | 
	2.00
  | 
	Riveted firewall & bungee pin
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-30-2015
  | 
	2.00
  | 
	Finished scuffing.  Clecoed and applied Cortec
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-28-2015
  | 
	5.00
  | 
	Finished firewall assembly
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-27-2015
  | 
	7.00
  | 
	Temp installed brake  cylinders.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-26-2015
  | 
	3.00
  | 
	Fitted and drilled brake pedal hinges and brake pe
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-31-2015
  | 
	3.00
  | 
	rudder pedal
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-23-2015
  | 
	3.00
  | 
	Trimmed left lower longeron
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-12-2015
  | 
	2.00
  | 
	Drilled and clecoed 75F11-3, 75F12-2 and 75F10-5
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-10-2015
  | 
	6.00
  | 
	forward fuselage
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-09-2015
  | 
	5.00
  | 
	Clecoed baggage area components back in place
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-06-2015
  | 
	1.00
  | 
	flaperon torque tubes
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-05-2015
  | 
	3.00
  | 
	flaperon controls
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-03-2015
  | 
	3.00
  | 
	started installing flaperon controls.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-02-2015
  | 
	3.00
  | 
	Applied Cortec to the parts.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-29-2015
  | 
	1.00
  | 
	Scuffed parts of the baggage area components
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-28-2015
  | 
	3.00
  | 
	baggage area panels
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-27-2015
  | 
	3.00
  | 
	Riveted componenets of baggag back
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-26-2015
  | 
	3.00
  | 
	deburred and scuffed baggaged back
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-25-2015
  | 
	3.00
  | 
	Riveted top skin to stiffeners and longerons.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-24-2015
  | 
	3.00
  | 
	top longerons and top stiffeners
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-23-2015
  | 
	4.00
  | 
	baggage floors
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-18-2015
  | 
	5.00
  | 
	Cut L angles for baggage floor suppor
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-17-2015
  | 
	4.00
  | 
	L angles to baggage floor.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-16-2015
  | 
	7.00
  | 
	Folded top skin back for baggage area access
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-15-2015
  | 
	8.00
  | 
	Riveted both HT frames to fuselage bottom
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-14-2015
  | 
	11.00
  | 
	HT brackets
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-13-2015
  | 
	4.00
  | 
	rear fuselage skins and stiffeners
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-12-2015
  | 
	6.00
  | 
	Drilled lateral and diaonal stiffener holes
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-11-2015
  | 
	4.00
  | 
	Attached aft left side skinto left side skin
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-07-2015
  | 
	5.00
  | 
	Riveted stiffeners to right side
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-06-2015
  | 
	6.00
  | 
	Right rear fuselage skin
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-05-2015
  | 
	7.00
  | 
	Removed bottom right longeron to use with fuselage
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-04-2015
  | 
	5.00
  | 
	final size in bottom fuselage skin
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-03-2015
  | 
	7.00
  | 
	longerons to bottom fueslage skin
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-02-2015
  | 
	3.00
  | 
	Fitted & attached elevator to HS.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-30-2015
  | 
	3.00
  | 
	Riveted elevator skins
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-29-2015
  | 
	4.00
  | 
	Clecoed elevator skins and trim tab after applying
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-22-2015
  | 
	4.00
  | 
	Riveted elevator skeleton.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-21-2015
  | 
	5.00
  | 
	Mounted trim servo and adjusted arm length.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-19-2015
  | 
	6.00
  | 
	Attached trim tab & piano hinge to elevator
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-18-2015
  | 
	2.00
  | 
	Cleaned upper & lower elevator horns
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-17-2015
  | 
	1.00
  | 
	Removed & trimmed right elevator nose skin. Filed
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-16-2015
  | 
	2.00
  | 
	Added rivet holes to bottom of right elevator tip
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-15-2015
  | 
	1.00
  | 
	MARKED AND DRILLED NOSE SKIN TIPS AND MIDDLE RIBS
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-09-2015
  | 
	3.00
  | 
	DRILLED HOLES TO SIZE ON TOP AND BOTTOM OF ELEVATO
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-08-2015
  | 
	6.00
  | 
	ELEVATOR NOSE SKIN
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-07-2015
  | 
	3.00
  | 
	AJUSTED ELEVATOR TIPS FOR BETTER FIT
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-06-2015
  | 
	3.00
  | 
	RIVETED HS SKIN
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-06-2015
  | 
	4.00
  | 
	ELEVATOR PARTS, CLECOED RIBS
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-05-2015
  | 
	4.00
  | 
	APPLIED CORTEC TO SKELETON
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-04-2015
  | 
	4.00
  | 
	DEBURED, TRIMEDD, FILED AND SKUFFED CLEANED WITH A
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-26-2015
  | 
	4.00
  | 
	DISASSEMBLED HS SKIN DEBURED
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-25-2015
  | 
	5.00
  | 
	FINIISHED DRILLING
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-24-2015
  | 
	6.00
  | 
	HORZONTAL STAB SKELETON
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-12-2012
  | 
	2.00
  | 
	75F11-3, 75F12-2 and 75F10-5
  | 
	
			Details 
		 | 
	
	          |