Date
|
Hours
|
Work Log Summary

|
Details

|
01-16-2016
|
1.00
|
Worked on new cowling
|
|
  |
|
11-18-2015
|
10.00
|
See Details
|
Details
|
|
|
11-09-2015
|
10.00
|
See Details
|
Details
|
  |
|
11-03-2015
|
4.00
|
Worked on final wiring.
|
|
  |
|
11-02-2015
|
8.00
|
See Details
|
Details
|
|
|
10-28-2015
|
3.00
|
See Details
|
Details
|
|
|
10-27-2015
|
3.00
|
Deburred and riveted wing walk and fairings.
|
|
|
|
10-26-2015
|
7.00
|
See Details
|
Details
|
  |
|
10-23-2015
|
2.00
|
Worked on rigging the wings.
|
|
  |
|
10-20-2015
|
1.00
|
See Details
|
Details
|
|
|
10-19-2015
|
4.00
|
Fit wing farings and faring rubber to wings.
|
|
|
|
10-16-2015
|
2.00
|
Continued rigging flight controls
|
|
|
|
10-14-2015
|
2.00
|
Worked at rigging the flight controls. see detial
|
Details
|
|
|
10-12-2015
|
6.00
|
See Details
|
Details
|
 |
|
10-10-2015
|
2.00
|
Riveted the wing tips and see detaild.
|
Details
|
|
|
10-07-2015
|
4.00
|
Installed Ailerons and Flaps on the wings.
|
|
|
|
10-05-2015
|
2.00
|
Started installing ailerons
|
Details
|
|
|
10-03-2015
|
3.00
|
Worked on front landing gear fairing.
|
|
|
|
09-28-2015
|
4.00
|
Worked on trim controls
|
|
|
|
09-28-2015
|
2.00
|
Installed ELT cable & worked on enterior.
|
|
|
|
09-26-2015
|
1.00
|
Started installing enterior.
|
|
 |
|
09-25-2015
|
1.00
|
Wirired up tip lights and attached wing tips.
|
Details
|
 |
|
09-22-2015
|
2.00
|
See Details
|
Details
|
 |
|
09-21-2015
|
6.00
|
Installed the horizontal & Vertical stabilizers.
|
|
  |
|
09-18-2015
|
1.00
|
Riveted rudder hinge in place & odds and ends.
|
|
 |
|
09-18-2015
|
5.00
|
Painted fiberglass tips for wings & stablizers
|
Details
|
|
|
09-14-2015
|
5.00
|
See Details
|
Details
|
|
|
09-07-2015
|
3.00
|
Installed the ELT
|
|
|
|
09-04-2015
|
3.00
|
Drill tips and installed lights.
|
|
|
|
09-04-2015
|
1.00
|
Began polishing tail surfaces of aircraft.
|
|
|
|
09-02-2015
|
2.00
|
Worked on landing gear fairings.
|
|
 |
|
09-02-2015
|
2.00
|
See details
|
Details
|
  |
|
08-31-2015
|
2.00
|
Worked on landing fairings.
|
|
|
|
08-31-2015
|
8.00
|
Installed windshield with screws and nuts.
|
|
|
|
08-30-2015
|
2.00
|
Reinstalled windsheild.
|
|
  |
|
08-29-2015
|
1.00
|
Covered the glare shield.
|
|
|
|
08-28-2015
|
2.00
|
Reinstalled glare shield
|
|
|
|
08-26-2015
|
1.50
|
Worked on installing the gas tank and glare shield
|
|
  |
|
08-25-2015
|
1.00
|
Continued work on installing gas tank.
|
|
  |
|
08-24-2015
|
11.00
|
See Details
|
Details
|
  |
|
08-23-2015
|
3.00
|
Worked on relocating wiring.
|
|
|
|
08-22-2015
|
2.00
|
Installed new fittings into gas tank.
|
|

|
|
08-21-2015
|
2.00
|
Drilled out leaking fittings from gas tank.
|
|
 |
|
08-18-2015
|
2.50
|
Going in reverse, see details.
|
Details
|
 |
|
08-17-2015
|
9.00
|
See details
|
Details
|
  |
|
08-16-2015
|
4.00
|
See details
|
Details
|
|
|
08-15-2015
|
9.00
|
See Details
|
Details
|
|
|
08-14-2015
|
1.50
|
Worked on installing seat belts.
|
|
  |
|
08-13-2015
|
4.00
|
See details
|
Details
|
|
|
08-13-2015
|
1.00
|
Riveted elevator pushrod brackets.
|
|
|
|
08-12-2015
|
5.00
|
See details
|
Details
|
|
|
08-11-2015
|
3.00
|
See details
|
Details
|
|
|
08-10-2015
|
7.00
|
See Details
|
Details
|
 |
|
08-09-2015
|
2.00
|
Worked on installing tail fins.
|
|
  |
|
08-04-2015
|
2.00
|
See details
|
Details
|
 |
|
08-03-2015
|
4.00
|
See Details
|
Details
|
|
|
08-02-2015
|
1.00
|
Cut and fit the wing tips.
|
Details
|
|
|
07-27-2015
|
6.00
|
Continued work on canopy frame.
|
|
|
|
07-26-2015
|
3.00
|
Worked on installing canopy.
|
|
|
|
07-25-2015
|
1.00
|
Continued work on canopy frame.
|
|
  |
|
07-24-2015
|
3.00
|
Worked on canopy frame
|
|
|
|
07-20-2015
|
2.00
|
Started engine for first time - see details
|
Details
|
 |
|
07-20-2015
|
4.00
|
Finished wiring up the engine.
|
|
|
|
07-18-2015
|
4.00
|
Finished rewiring instrument panel.
|
|
  |
|
07-17-2015
|
4.00
|
Worked on wiring.
|
|
|
|
07-16-2015
|
2.50
|
Worked on rewiring instrument panel
|
|
  |
|
07-07-2015
|
3.00
|
Worked on rewiring the instruments and starter.
|
|
|
|
07-06-2015
|
7.00
|
Worked at rewiring see details
|
Details
|
 |
|
07-05-2015
|
4.00
|
Worked on getting everything connected.
|
|
  |
|
07-04-2015
|
4.00
|
See Details
|
Details
|
  |
|
07-03-2015
|
9.00
|
Ron & Peter cut the canopy to fit.
|
Details
|
|
|
07-02-2015
|
7.00
|
See details:
|
Details
|
|
|
06-30-2015
|
3.00
|
See details
|
Details
|
|
|
06-29-2015
|
2.50
|
Worked on cowling and wheel pants
|
|
|
|
06-29-2015
|
2.00
|
See details
|
Details
|
 |
|
06-26-2015
|
2.00
|
Replaced lower cowling hinge.
|
|
  |
|
06-24-2015
|
3.00
|
Worked again on baffles and finished wheel pants.
|
|
 |
|
06-23-2015
|
2.50
|
Worked on baffle and wheel pants.
|
|
 |
|
06-22-2015
|
1.00
|
Continued working on new baffle seal.
|
|
  |
|
06-12-2015
|
4.00
|
Replaced seal on engine baffling.
|
|
 |
|
06-12-2015
|
3.00
|
Reinstalle baffle and worked on intake manifold.
|
|
 |
|
06-08-2015
|
3.50
|
Removed and installed new baffle seal.
|
|
|
|
06-07-2015
|
1.50
|
See Details
|
Details
|
|
|
06-05-2015
|
2.00
|
Did more work on the wheel pants.
|
|
  |
|
06-03-2015
|
3.50
|
Worked on wheel pants.
|
|
|
|
06-01-2015
|
4.00
|
Worked on landing gear fairings.
|
|
  |
|
05-30-2015
|
2.00
|
Worked on wheel pants.
|
|
 |
|
05-29-2015
|
3.00
|
Finished off glare shield.
|
Details
|
 |
|
05-27-2015
|
5.00
|
See Details
|
Details
|
|
|
05-25-2015
|
2.00
|
Removed gas tank and installed oil gage with help
|
|
|
|
05-24-2015
|
4.00
|
See Details
|
Details
|
|
|
05-23-2015
|
3.00
|
Finished brake & flap handles and flap control.
|
|
|
|
05-22-2015
|
4.00
|
Finished brakes and bled them.
|
|
 |
|
05-21-2015
|
5.00
|
See Details
|
Details
|
|
|
05-18-2015
|
7.00
|
See Detailes
|
Details
|
|
|
05-16-2015
|
2.00
|
drilled holes for the brake lines and installed
|
|
|
|
05-08-2015
|
6.00
|
See Detailes
|
Details
|
|
|
05-06-2015
|
1.00
|
Worked on bracker for flap controls.
|
|
|
|
05-05-2015
|
1.00
|
Worked at fitting cowling
|
|
 |
|
05-04-2015
|
5.00
|
Finished putting rubber around baffleing
|
|
|
|
05-04-2015
|
3.00
|
Finished Cowling and worked on stop for flaps.
|
|
|
|
05-02-2015
|
2.00
|
Worked on wheel pants.
|
|
  |
|
05-02-2015
|
2.00
|
Began working on wheel pants.
|
|
  |
|
05-02-2015
|
2.00
|
Began work on wheel pants.
|
|
 |
|
05-01-2015
|
2.00
|
Worked on glare sheild and covering.
|
|
  |
|
04-27-2015
|
5.00
|
Worked on fitting baffles to cowling.
|
|
|
|
04-24-2015
|
5.00
|
Worked on installing seal to baffles & fuel lines.
|
|
|
|
04-22-2015
|
2.50
|
Worked on engine cooling baffles
|
|
 |
|
04-20-2015
|
5.50
|
Worked on fuel system - see detaild
|
Details
|
|
|
04-18-2015
|
5.00
|
Rich & Peter worked on rigging.
|
Details
|
|
|
04-15-2015
|
2.50
|
Made air deflector for the cowling.
|
|
|
|
04-14-2015
|
3.50
|
Worked on cowling see details.
|
Details
|
|
|
04-13-2015
|
4.00
|
See details for info
|
Details
|
|
|
04-10-2015
|
2.50
|
Worked on Windshield.
|
Details
|
|
|
04-08-2015
|
2.00
|
Drilled out the holes for the windshield.
|
Details
|
|
|
04-07-2015
|
2.00
|
Worked on oil fill cover.
|
Details
|
 |
|
04-06-2015
|
4.00
|
Drilled & taped windshield bow and prepared windsh
|
|
|
|
04-04-2015
|
3.00
|
Rich & Peter fitted the windshield and drilled it.
|
|
  |
|
03-30-2015
|
3.00
|
Worked on forming the Canopy Frame.
|
|
 |
|
03-25-2015
|
2.00
|
Rich and Peter worked on cowling
|
|
|
|
03-23-2015
|
4.00
|
See Detailes
|
Details
|
|
|
03-21-2015
|
4.00
|
Rich & Peter worked on fitting the wind screen
|
|
  |
|
03-09-2015
|
2.00
|
Updrilled and countersunk cowling rivet holes
|
|
 |
|
03-07-2015
|
3.00
|
Rich & Peter instald hinges on cowling
|
|
|
|
02-27-2015
|
2.50
|
Fitted cowling to baffels
|
|
  |
|
02-26-2015
|
2.50
|
Continued fitting cowling
|
|
|
|
02-25-2015
|
3.00
|
Worked on fitting cowling
|
|
|
|
02-24-2015
|
2.00
|
Continued fitting the cowling.
|
|
|
|
02-23-2015
|
4.00
|
Worked on fitting cowling.
|
|
  |
|
01-19-2015
|
1.00
|
installed southco studs that hold the cowling on.
|
|
|
|
01-12-2015
|
4.00
|
Ron helped Peter fit left side of cowling.
|
|
|
|
01-05-2015
|
5.00
|
Bruce & Peter Worked on fitting cowling.
|
|
|
|
12-29-2014
|
6.00
|
Bruce & Peter worked on cowling.
|
|
|
|
12-27-2014
|
2.00
|
Bruce & Rich & Peter
|
Details
|
|
|
12-15-2014
|
2.00
|
Ron helped Peter work on windscreen
|
|
|
|
12-13-2014
|
2.00
|
Rich & Peter worked on windscreen
|
|
  |
|
12-08-2014
|
2.00
|
Ron Helped Peter Cowling guard.
|
Details
|
|
|
12-08-2014
|
3.00
|
Ron & Peter cut the holes in the cowling.
|
Details
|
|
|
10-17-2014
|
1.00
|
Did a few odds and ends.
|
|
  |
|
10-08-2014
|
4.00
|
See Detailed Discription
|
Details
|
|
|
09-29-2014
|
7.00
|
Worked on baffles.
|
Details
|
 |
|
09-26-2014
|
2.50
|
Worked on baffles.
|
Details
|
  |
|
09-24-2014
|
2.00
|
Worked on baffles and wiring.
|
|
  |
|
09-22-2014
|
5.00
|
Continued work on baffles.
|
|
|
|
09-20-2014
|
2.00
|
Rich & Peter worked on cooling baffles.
|
|
 |
|
09-15-2014
|
4.00
|
Worked on wiring.
|
|
|
|
09-13-2014
|
2.00
|
see details
|
Details
|
  |
|
09-10-2014
|
4.00
|
Installed headphone jacks and tied wires.
|
|
|
|
09-10-2014
|
4.00
|
Installed compus & transponder.
|
|
|
|
09-09-2014
|
2.00
|
Installed radio antenna, radio works well.
|
|
 |
|
09-08-2014
|
4.00
|
See detailed discription
|
Details
|
|
|
09-05-2014
|
4.00
|
Chased parts and installed push to talk and sticks
|
|
|
|
08-31-2014
|
1.00
|
Made a mounting plate for the AHRS.
|
|
|
|
08-30-2014
|
2.00
|
Wired up the artificial horizon.
|
|
|
|
08-27-2014
|
4.00
|
Worked on wiring up the instruments.
|
|
|
|
08-25-2014
|
7.00
|
Peter & Rich worked on electronics on firewall.
|
|
|
|
08-23-2014
|
1.00
|
Reinstalled wheels to the aircraft.
|
|
 |
|
08-20-2014
|
2.00
|
Worked on installing instraments and wiring.
|
|
|
|
08-19-2014
|
1.00
|
Worked on wiring up instruments.
|
|
  |
|
08-16-2014
|
2.00
|
Installed the starter and connected the main wires
|
|
|
|
08-16-2014
|
4.00
|
Finished installing the disk brakes on wheels
|
|
 |
|
08-15-2014
|
2.00
|
Installed instruments in instrument panel.
|
|
|
|
08-14-2014
|
2.00
|
Tried to tap axels but broke tape off (see details
|
Details
|
|
|
08-13-2014
|
3.00
|
See Details
|
Details
|
|
|
08-12-2014
|
5.00
|
See Details
|
Details
|
  |
|
08-04-2014
|
4.00
|
Rich & Peter worked on engine and attached it.
|
|
|
|
07-28-2014
|
4.00
|
Did a number of things listed in details.
|
Details
|
|
|
07-27-2014
|
3.00
|
Worked on valves getting ready to adjust them.
|
Details
|
|
|
07-25-2014
|
2.00
|
Did odd & ends
|
|
|
|
07-22-2014
|
1.00
|
Ron helped me torque the flywheel to 227 ft. lb.
|
|
  |
|
07-21-2014
|
2.00
|
Removed flywheel so it can be sealed and torqued.
|
|
  |
|
07-19-2014
|
5.00
|
Did a number of things- see details.
|
Details
|
|
|
07-18-2014
|
2.00
|
Installed oil screen, oil pump, & worked on cooler
|
Details
|
|
|
07-15-2014
|
2.50
|
made last 4 pushroods.
|
|
|
|
07-12-2014
|
0.50
|
Made two oil lines for the oil cooler.
|
|
 |
|
06-28-2014
|
9.00
|
Bruce, Rich & Peter worked on engine.
|
Details
|
|
|
06-27-2014
|
5.00
|
Rich, Bruce and Peter started on engine.
|
Details
|
 |
|
06-23-2014
|
3.50
|
Finished Vents and prepared engine case.
|
Details
|
|
|
06-21-2014
|
3.00
|
Rich & Peter work on vents, pictures tell all
|
|
|
|
06-20-2014
|
2.00
|
Began work on air vents
|
|
  |
|
06-19-2014
|
3.00
|
Started work on the fuel system
|
|
|
|
06-17-2014
|
2.00
|
Got parts from shop and reinstalled landing gear.
|
|
  |
|
06-16-2014
|
5.00
|
Aligned main landing gear and gathered fuel parts.
|
Details
|
  |
|
06-10-2014
|
2.00
|
Finished riveting rear carry through spar.
|
|
|
|
06-09-2014
|
6.50
|
Worked on flight controls.
|
|
|
|
06-08-2014
|
4.00
|
Worked on landing gear
|
|
|
|
06-08-2014
|
2.00
|
Rich and Peter worked on isntaling landing gear.
|
|
|
|
06-03-2014
|
3.00
|
See detailed discription
|
Details
|
|
|
06-02-2014
|
0.50
|
Worked on steering boot.
|
|
 |
|
06-02-2014
|
3.00
|
Rich & Peter drilled wing attachment holes again.
|
|
|
|
06-01-2014
|
4.00
|
Worked on battery box and cable guards.
|
|
|
|
05-29-2014
|
2.00
|
Put wings together and drilled attachment hole.
|
|
  |
|
05-27-2014
|
4.00
|
Finished off the top half of the firewall.
|
|
|
|
05-26-2014
|
4.00
|
Worked on motor mount.
|
|
|
|
05-26-2014
|
2.00
|
Worked on front landing gear.
|
|
|
|
05-24-2014
|
3.00
|
Worked on three things see detailes
|
Details
|
|
|
05-22-2014
|
5.00
|
See Detailes
|
Details
|
|
|
05-17-2014
|
2.00
|
See Detailed Description
|
Details
|
  |
|
05-03-2014
|
5.00
|
Rich and Peter finished installing the wings.
|
Details
|
|
|
04-30-2014
|
5.00
|
Rich and Peter worked on installing wings.
|
|
  |
|
04-29-2014
|
1.00
|
Made covers for ruder cables.
|
|
 |
|
04-28-2014
|
5.00
|
Set wings up for installation.
|
Details
|
|
|
04-25-2014
|
1.00
|
Worked on center elevator control rod setup.
|
|
  |
|
04-24-2014
|
1.00
|
Worked on wing attachments.
|
|
  |
|
04-22-2014
|
3.00
|
Worked on preparing wings to be installed.
|
Details
|
  |
|
04-21-2014
|
4.00
|
Rich and Peter worked on wings
|
Details
|
|
|
04-19-2014
|
4.00
|
Worked at installing wings
|
Details
|
  |
|
04-18-2014
|
2.00
|
Rich and Peter moved plane to airport.
|
|
  |
|
04-14-2014
|
3.00
|
Perpared plane to have the wings installed.
|
|
  |
|
04-12-2014
|
3.00
|
Made master cylinder mounting bracket.
|
|
|
|
04-11-2014
|
2.00
|
Worked on wheels and brakes.
|
Details
|
|
|
04-07-2014
|
6.50
|
Rich & Peter worked on left wing.
|
Details
|
|
|
04-05-2014
|
5.00
|
Rich and Peter installed left leading edge.
|
|
|
|
04-04-2014
|
3.00
|
Rich & Peter riveted left skin aft skins.
|
|
  |
|
04-02-2014
|
4.50
|
Rich and Peter worked on right wing.
|
Details
|
  |
|
04-01-2014
|
3.00
|
Worked on left wing.
|
Details
|
 |
|
03-31-2014
|
6.50
|
Worked on left wing
|
Details
|
|
|
03-26-2014
|
3.50
|
Continued work on left wing.
|
Details
|
|
|
03-24-2014
|
2.00
|
Wired the wing and installed airspeed tubes
|
|
|
|
03-24-2014
|
3.50
|
Installed leading edge of right wing.
|
Details
|
 |
|
03-22-2014
|
4.50
|
Rich & Peter worked on wings
|
Details
|
|
|
03-21-2014
|
1.00
|
Rich & Peter worked on leading edge.
|
|
  |
|
03-19-2014
|
3.50
|
Rich and Peter removed leading edge to finish it.
|
Details
|
  |
|
03-17-2014
|
6.00
|
Installed leading edge of right wing.
|
|
|
|
03-15-2014
|
2.50
|
Riveted top right wing skin and started leading ed
|
|
|
|
03-14-2014
|
3.00
|
Work on right wing.
|
Details
|
|
|
03-12-2014
|
3.00
|
Finished deburing right wing and revited lower aft
|
|
|
|
03-10-2014
|
4.00
|
Rich & Peter worked on wings.
|
Details
|
|
|
03-08-2014
|
6.00
|
Rich & Peter worked on deburing wings.
|
|
|
|
03-07-2014
|
3.00
|
Rich & Peter Worked on installing flaps & Ailerons
|
|
|
|
03-04-2014
|
2.50
|
Rich and Peter updrilled the glare sheild.
|
|
 |
|
03-03-2014
|
4.00
|
Rich and Peter worked on the fuselage.
|
Details
|
|
|
03-03-2014
|
3.50
|
Installed carry through spar.
|
|
|
|
02-26-2014
|
3.00
|
Worked on rear spar carry through.
|
|
|
|
02-24-2014
|
2.00
|
Rich and Peter worked on rear spar attachment.
|
|
  |
|
02-22-2014
|
6.00
|
Rich and Peter worked on:
|
Details
|
 |
|
02-20-2014
|
2.00
|
Finished last aileron.
|
|
|
|
02-20-2014
|
6.00
|
Finished flaps and riveted them.
|
|
 |
|
02-19-2014
|
2.00
|
Worked on deburring flaps and aileron.
|
|
 |
|
02-17-2014
|
7.50
|
Rich and Peter worked on flaps.
|
Details
|
|
|
02-15-2014
|
5.00
|
Rich and Peter worked on flaps.
|
|
  |
|
02-11-2014
|
8.00
|
Finished right aileron & worked on left aileron.
|
|
|
|
02-10-2014
|
2.00
|
Made a new rib for aileron
|
|
|
|
02-08-2014
|
3.00
|
Rich and Peter worked on the ailerons.
|
|
  |
|
02-05-2014
|
2.00
|
Worked on wiring.
|
|
  |
|
02-03-2014
|
4.00
|
Started work on the left aileron.
|
|
  |
|
02-03-2014
|
2.00
|
Continued working on wiring the panel.
|
|
  |
|
01-30-2014
|
1.50
|
Worked on wiring the instrument panel.
|
|
  |
|
01-29-2014
|
3.00
|
Finished drilling the lead and updrilled aileron.
|
|
  |
|
01-28-2014
|
7.00
|
Worked on right aileron.
|
Details
|
|
|
01-27-2014
|
1.50
|
Worked on wiring panel
|
|
  |
|
01-27-2014
|
3.00
|
Began work on aileron
|
|
|
|
01-24-2014
|
4.00
|
Worked on wiring the instrument panel
|
|
 |
|
01-20-2014
|
4.00
|
Formed and worked on new intrument panel.
|
|
|
|
01-15-2014
|
2.50
|
I began working on the instrument panel.
|
|
  |
|
01-01-2014
|
278.50
|
Rebuilding site after computer troubles!!!!!
|
Details
|
  |
|
06-26-2013
|
5.00
|
Worked on firewall
|
|
  |
|
06-24-2013
|
6.00
|
Finished updrilling turtle deck and installed rive
|
|
|
|
06-21-2013
|
5.00
|
Updrilled turtle deck skin and reinstalled
|
|
 |
|
06-19-2013
|
6.00
|
Put skin on the turtle deck.
|
|
 |
|
06-18-2013
|
2.00
|
More work on deburring and updrilling.
|
|
 |
|
06-17-2013
|
8.00
|
Up drilled & Revited skin on tail section.
|
|
 |
|
06-16-2013
|
3.00
|
Installed the tail skid which replaces the tail wh
|
|
 |
|
06-15-2013
|
4.00
|
Still more work on the aft fuselage
|
|
 |
|
06-14-2013
|
8.00
|
More work on tail section.
|
|
 |
|
06-13-2013
|
10.00
|
Continued to work on the aft fuselage
|
|
 |
|
06-12-2013
|
6.00
|
Rich & Peter worked on tail section.
|
|
 |
|
06-11-2013
|
7.00
|
Worked on bending.
|
Details
|
|
|
06-10-2013
|
4.00
|
Started second side of tail section.
|
|
 |
|
06-09-2013
|
6.00
|
Did more work on tail section.
|
|
 |
|
06-08-2013
|
4.00
|
Continued to work on tail section
|
|
 |
|
06-07-2013
|
4.00
|
Began working on the tail section of the plane.
|
|
 |
|
06-02-2013
|
3.00
|
Finished inventoring the kit.
|
|
|
|
06-01-2013
|
3.00
|
Rich and Peter inventoried the kit.
|
|
  |
|
05-30-2013
|
2.00
|
Kit Arrived.
|
Details
|
|
|
05-27-2013
|
9.00
|
Finished up tail section.
|
|
|
|
05-21-2013
|
3.00
|
Worked on skinning the horizonal stabilizer
|
Details
|
|
|
05-20-2013
|
8.00
|
More work on stablizers.
|
Details
|
|
|
05-10-2013
|
8.00
|
Worked on elevator.
|
|
|
|
05-06-2013
|
3.00
|
Did more work on rutter.
|
|
  |
|
05-05-2013
|
2.00
|
Allined tail tip and clecoed tail skin in place.
|
|
|
|
05-04-2013
|
5.00
|
Worked on Tail with Rich
|
Details
|
|
|
04-22-2013
|
10.00
|
Worked on horisonal stablizer
|
Details
|
 |
|
03-25-2013
|
10.00
|
Work on tail.
|
Details
|
|
|
03-11-2013
|
2.00
|
Inventoried the tail kit and started work.
|
|
|
|
03-03-2013
|
0.00
|
Purchased the tail kit from Sonex.
|
|
|
|
03-03-2013
|
0.00
|
Attended second day of Builders Workshop.
|
|
|
|
03-02-2013
|
0.00
|
Attended the first day of Builder Workshop.
|
|
|
|
02-22-2013
|
0.00
|
Made the leap.
|
Details
|
|