KitLog pro

Powered By Kitlog Pro v2.0

PETER'S WEB SITE

Builder:
Peter Terrill
Location:
Sunbury, Victoria - Australai
Aircraft:
Vans Aircraft - RV-6
Manufacturer:   
http://www.vansaircraft.com/
Engine:
AeroSport Power - 0-360 A1A
Prop:
Hartzell
Total Build Time:
62 Hours

Welcome to my Experimental Aircraft Web Site.

Recent Activity
 Date Hours Work Log Summary Details
 02-11-2002
1.5
Assembly Of Horiz Stab FWD Spar
Details

 02-10-2002
8.5
Assembly Of Forward Spar Of Horizontal Stabilizer.
Details

 02-18-2000
0.5
Final Inspection Of Vertical Stab
Details

 02-17-2000
3.5
Final Assembly Of Vertical Stabilizer
Details

 02-12-2000
8.0
Priming All Vertical Stabilizer Parts And Skin
Details

 02-10-2000
12.0
Finishing The Vertical Stabilizer
Details

 02-09-2000
8.0
Assembling Skeleton Of Vertical Stabilizer
Details

 02-01-2000
12.0
Construction Of Empennage And Wing Jig Fixture
Details

 01-02-2000
3.0
Rivetted Rear Spar Parts
Details

 01-01-2000
5.0
Assembly Of Horizontal Stab Rear Spar
Details










Copyright © 2001-2026 Matronics. All Rights Reserved.