KitLog pro

Powered By Kitlog Pro v2.0

Joe & Steve's RV9A Project

Builder:
steven pofahl
Location:
Brookings, SD -
Aircraft:
Vans - RV9A
Manufacturer:   
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
582 Hours

Welcome to my experimental aircraft Web site.

Recent Activity
 Date Hours Work Log Summary Details
 08-19-2017
0.0
In!
       

 08-19-2017
4.5
cut & buff ailerons and flaps
     

 08-18-2017
7.5
etch, prime, paint L wing
Details
       

 08-16-2017
4.5
prep L wing for paint
Details
       

 08-16-2017
3.0
pitot tube cont.
Details
     

 08-15-2017
4.5
Heated pitot tube installation
Details
       

 08-14-2017
0.0
interior finished
Details
       

 08-12-2017
0.0
clear coat floor
     

 08-11-2017
0.0
layed down epoxy floor
Details
     

 08-10-2017
0.0
finish electrical, prep floor
Details
     










Copyright © 2001-2017 Matronics. All Rights Reserved.