Powered By Kitlog Pro v2.0
RV-7 Construction
Builder:
David Taylor
Location:
Warner Robins, GA - US
Aircraft:
Vans - RV-7
Manufacturer:
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Welcome to my experimental aircraft Web site.
Recent Activity
First Photo
Date
Work Log Summary
10-01-2010
Dimpled the tank rivet holes
09-23-2010
Drilled tank drain flange to tank skins
09-22-2010
Drilled fuel tank flange
09-20-2010
Drilled platenut rivest attach holes and countersu
09-19-2010
Drilled tank access plate screw holes
09-18-2010
Drilled T-405 and T-410 made access hole for both
09-16-2010
Finished cutting tank angle attach brackets
05-28-2010
Rough cut left and right tank attach brackets
05-24-2010
Enlarged left tank attach screw holes to #19
05-23-2010
Countersunk tank skin to baffle holes on both tank
05-22-2010
Drilled left fuel tank skin
05-16-2010
Drilled W-423 joint plates to fuel tank
05-15-2010
Drilled Z-Channel spar brackets
10-09-2009
Fabricated cradle and assembled fuel tanks
10-09-2009
Assembled fuel tanks
09-04-2009
Drilled joint plate to leading edge
08-14-2009
Clecoed and drilled leading edge skin to ribs
08-07-2009
Drilled main skin to skeleton
07-31-2009
Fabricated wing walk doubler
07-17-2009
Riveted Ribs to main and rear spar
07-11-2009
Primed ribs
06-27-2009
Drilled ribs to main and rear spar
06-20-2009
Wing ribs
03-14-2009
Rear spar assembly
02-14-2009
Fabricated tie down assembly and spacers
SITE NAVIGATION
Contact Builder
RV-7 Home
All
Empennage
Wings
Copyright © 2001-2012 Matronics. All Rights Reserved.