KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction

Builder:
David Taylor
Location:
Warner Robins, GA - US
Aircraft:
Vans - RV-7
Manufacturer:   
http://www.vansaircraft.com/
Engine:
-
Prop:
-

Welcome to my experimental aircraft Web site.

Recent Activity
First Photo
Date

Work Log Summary

Using the DRDT-2
10-01-2010
Dimpled the tank rivet holes

09-23-2010
Drilled tank drain flange to tank skins
Tough to keep the flange/cap centered
09-22-2010
Drilled fuel tank flange

09-20-2010
Drilled platenut rivest attach holes and countersu

09-19-2010
Drilled tank access plate screw holes
Tank angle
09-18-2010
Drilled T-405 and T-410 made access hole for both
Just needs some final finishing
09-16-2010
Finished cutting tank angle attach brackets
Took a while to cut these suckers. I think I need a new bandsaw blade.
05-28-2010
Rough cut left and right tank attach brackets
Lookin' good
05-24-2010
Enlarged left tank attach screw holes to #19
I used a soldering iron to peel of some of the blue plastic
05-23-2010
Countersunk tank skin to baffle holes on both tank
The marks indicate the hole has been drilled
05-22-2010
Drilled left fuel tank skin

05-16-2010
Drilled W-423 joint plates to fuel tank

05-15-2010
Drilled Z-Channel spar brackets

10-09-2009
Fabricated cradle and assembled fuel tanks
Left tank assembled
10-09-2009
Assembled fuel tanks
Duct tape to hold the rib in place
09-04-2009
Drilled joint plate to leading edge

08-14-2009
Clecoed and drilled leading edge skin to ribs
Good help is hard to find
08-07-2009
Drilled main skin to skeleton
Top side
07-31-2009
Fabricated wing walk doubler

07-17-2009
Riveted Ribs to main and rear spar
Drying after being primed
07-11-2009
Primed ribs

06-27-2009
Drilled ribs to main and rear spar

06-20-2009
Wing ribs

03-14-2009
Rear spar assembly

02-14-2009
Fabricated tie down assembly and spacers











Copyright © 2001-2012 Matronics. All Rights Reserved.