KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction

Builder:
David Taylor
Location:
Warner Robins, GA - US
Aircraft:
Vans - RV-7
Manufacturer:   
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
389 Hours

Welcome to my Experimental Aircraft Web Site.

Recent Activity
 Date Hours Work Log Summary Details
 03-08-2014
1.5
Aileron Hinge Brackets
Details
       

 03-02-2014
3.0
Installed Fuel Tanks
Details
 

 02-16-2014
2.0
Riveted Top Skins On The Left Wing
Details
       

 09-21-2013
2.0
Bruce Helping Me Rivet The Top Skins
Details
       

 09-18-2013
1.5
Began Riveting Top Skin On The Right Wing
Details
     

 09-13-2013
1.0
Primed Rear Spar Rivet Holes
Details
       

 08-25-2013
1.0
Made And Installed Pitot Tube Line
Details
       

 08-25-2013
0.0
Made And Installed Pitot Tube Line
Details
       

 08-22-2013
1.0
Ran Wiring Conduit
Details
     

 08-17-2013
1.5
Riveted Main Ribs To Main Spar
Details
       










Copyright © 2001-2020 Matronics. All Rights Reserved.