Home
Builder Search
Builder Login
KitLog.com    

RECENT ACTIVITY

Previous Builder          Next Builder

Builder:
  George Scott
Location:
  Chalfont, PA - USA
Aircraft:
  RV 10
Total Build Hours:
  
Web Site:
  http://www.mykitlog.com/xpendable2/

Date:  05-12-2019
Number of Hours:  0.00
Short Description:  Rear Spar Assembly Prep

Initial match drilling, and priming for the rear horizontal stabilizer assembly.




All Set and Primed

Previous Builder          Next Builder




 Recent Builder Activity
Builder Project Date Hours
DOUG WEHRLY
Sling 2
05-23
678
Ronald Cardwell
RV-8
05-23
449
Andrey Piskarev
Highlander
05-22
612
Carl Orton
750 Cruzer
05-22
379
Darrel Watson
S7 Super Sport
05-22
923
Douglas Kupersmith
Zodiac 650 B
05-22
1262
Franklin Gaxiola
RV-12iS
05-22
3205
Jay Johnson
CH-750 Cruzer
05-22
1225
John Peck
C120
05-22
330
Larry Rhoads
Sopwith Baby
05-22
1882
Mike Hardison
RV7
05-22
1249
John Nate
Defiant
05-21
405
Peter Calley
Sling4
05-21
1774
Rick McBride
RV-10
05-21
814
Robert Lussow
RV-10
05-21
2173
Thomas Hudgins & Carroll Drake
Ridge Runner 3
05-21
372
Chris King
Fokker D.VII
05-20
928
Johnathan Wiltberger
Bearhawk Model B
05-20
38
Scott Ahrens
Patrol
05-20
368
Sean Smith
CX5
05-20
272
Steve Shae
S-20 Raven
05-20
1269
Bob Corriveau
RV-8
05-19
1064
Eric Fitzgerald
RV-7
05-19
396
Paul Bonorden
RV-6A
05-19
2036
Chris Cook
RV-8
05-18
2606
Christopher Pryce
KR2S
05-18
966
Jean Gosselin
RV6
05-18
610
Jonathan Mulder
RV-14A
05-18
515
Ronald Machisen
RV-14A
05-18
368
Steven Lynn
RV-7A
05-18
1706

Projects Uploaded: 1447
Logs Uploaded: 246517








Copyright © 2001-2019 Matronics. All Rights Reserved. Privacy Policy.