Home
Builder Search
Builder Login
KitLog.com    

RECENT ACTIVITY

Previous Builder          Next Builder

Builder:
  Tango Flight
Location:
  Georgetown, TX - USA
Aircraft:
  RV-12
Total Build Hours:
  824
Web Site:
  http://www.mykitlog.com/DanWeyant/

Date:  04-05-2018
Number of Hours:  4.00
Short Description:  power wiring

We connected the forward fuselage wiring harness and stuck the wires through the fire wall to be continued at a later time. We connected the power wire to the positive side of the battery and left it for later connection. We began connection to connect the wires to the grounded side of the battery, however, the plans said to not connect the ground wire so it is not yet attached to the ground.















Previous Builder          Next Builder




 Recent Builder Activity
Builder Project Date Hours
DOUG WEHRLY
Sling 2
04-25
118
Peter Calley
Sling4
04-25
1631
Darrel Watson
S7 Super Sport
04-24
697
David Lewis
RV10
04-24
1498
Gregory Koch
Model 12
04-24
274
James Anderson
ES
04-24
3116
John Steere
Panther
04-24
1961
Mark Johnson
RV-12
04-24
1136
Mike Tinich
RV12
04-24
778
Nathan Mullins
Long Ez
04-24
5014
Neil Rosoff
RV9A
04-24
2195
steven pofahl
RV9A
04-24
1537
Brett Holland
SS7
04-23
684
Darren Fern
RV 8
04-23
54
Doug Malloy
CH 750 Cruzer
04-23
526
Gordon Porter
Lancair Super ES
04-23
3766
Randy Doughty
CH750 Cruzer
04-23
214
Robert Lussow
RV-10
04-23
1874
Bob Orre
RV-10
04-22
359
Carl Orton
750 Cruzer
04-22
127
Michael Smith
Sonex Standard Gear
04-22
2447
Robert Cunningham
Series 7 Super Sport
04-22
582
Stephen Bacala
S-21 Outbound
04-22
115
Steven Lynn
RV-7A
04-22
1560
Bob Collins
RV-12
04-21
408
Chris King
Fokker D.VII
04-21
332
Jay Johnson
CH-750 Cruzer
04-21
211
John Peck
C120
04-21
330
Martin Filiatrault
RV-8
04-21
1039
Rich Tomanio
RV-8
04-21
74

Projects Uploaded: 1391
Logs Uploaded: 234782








Copyright © 2001-2018 Matronics. All Rights Reserved. Privacy Policy.