Home
Builder Search
Builder Login
KitLog.com    

RECENT ACTIVITY

Previous Builder          Next Builder

Builder:
  Timothy Falkofske
Location:
  Arlington, Texass - United States
Aircraft:
  Air Camper
Total Build Hours:
  234
Web Site:
  http://www.mykitlog.com/Timothy Falk/

Date:  01-08-2018
Number of Hours:  6.00
Short Description:  Steam box 3

Image 3 shows the two spars being pulled back into straight line. The clamps and blocks at the spar ends fixed the ends. The clamps at mid-length were used to pull the spars straight plus a 1/16" in more to allow for some spring back.




Spar ready to pull out





R13 top and sides





Both steamed spars pulled back straight

Previous Builder          Next Builder




 Recent Builder Activity
Builder Project Date Hours
Peter McBain
RV-9A
02-24
508
David Macdonald
RV-10
02-23
1828
Jay Johnson
CH-750 Cruzer
02-23
65
Larry Rhoads
Sopwith Baby
02-23
686
Mike Tinich
RV12
02-23
843
Nathan Mullins
Long Ez
02-23
4810
Peter Dailey
Xenos-B
02-23
863
Robert Cunningham
Series 7 Super Sport
02-23
442
Robert Lussow
RV-10
02-23
1782
Steven Bray
CH750 Cruzer
02-23
1125
steven pofahl
RV9A
02-23
1268
Brett Holland
SS7
02-22
600
Doug Malloy
CH 750 Cruzer
02-22
459
JAMES TRAYNOR
VELOCITY- XLRG
02-22
2244
Stephen Bacala
S-21 Outbound
02-22
74
Tango Flight
RV-12
02-22
733
Des Howson
Sling 2 Taildragger
02-21
1754
Douglas Kupersmith
Zodiac 650 B
02-21
1114
James Anderson
ES
02-21
3020
Larry Ward
650
02-21
1224
Mark Johnson
RV-12
02-21
1119
Peter Calley
Sling4
02-21
1616
Tom Hassie
Sonex
02-21
696
David LeFrancois
Cozy MKIV
02-20
574
Miles Bowen
RV-7
02-20
1631
Rich Tomanio
RV-8
02-20
38
Bob Collins
RV-12
02-19
349
Brad Ripp
Bearhawk 4 place
02-19
324
Dave Conwell
Sonex Aerovee Tri-gear
02-19
1085
Franklin Gaxiola
RV-12iS
02-19
404

Projects Uploaded: 1378
Logs Uploaded: 232310








Copyright © 2001-2018 Matronics. All Rights Reserved. Privacy Policy.