Home
Builder Search
Builder Login
KitLog.com    

RECENT ACTIVITY

Previous Builder          Next Builder

Builder:
  Donald Morrisey
Location:
  Plymouth, MA - USA
Aircraft:
  CH 750 CruZer
Total Build Hours:
  284
Web Site:
  http://www.mykitlog.com/n2charlie/

Date:  06-21-2017
Number of Hours:  3.00
Short Description:  LG Weldments

No big mystery here. Cover the two sides with masking take and draw the lines where the drilling is going to happen...then remove to drill to #40. Then back in place to get a hole on each side and cleco...making sure the bottom is lined up with the bottom of the fuselage/cabin skin. Then it's a lot of drilling and on and off. Once you have all the #40 holes drilled its much easier to remove the weldment and upsize the holes from the exterior.

Need to also add a 150MM L angle at the inside bottom and drill through the weldment, making sure to avoid the areas where the support flanges are on the weldment. Same deal with drilling, once you have it to #40 on the L angle...remove to drill the upsize from the exterior.










Previous Builder          Next Builder




 Recent Builder Activity
Builder Project Date Hours
Peter Calley
Sling4
06-24
1436
David Macdonald
RV-10
06-23
1191
Doug Malloy
CH 750 Cruzer
06-23
1234
Glenn Davis
CH 650B
06-23
732
Mark Zilm
Helicycle
06-23
207
Robert Lussow
RV-10
06-23
1483
steven pofahl
RV9A
06-23
473
Jan Hanekom
ZU-XOX RV10
06-22
296
Steven Bray
CH750 Cruzer
06-22
753
Bob Collins
RV-12
06-21
125
David Nolte
RV-7A
06-21
2154
Donald Morrisey
CH 750 CruZer
06-21
284
Jerald L. Folkerts
Super Rebel 2500
06-21
3380
Jim Novak
RV-8
06-20
1457
Mike Hardison
RV-7
06-20
1035
Mike Meyer
RV-10
06-20
12
Paul Bonorden
RV-6A
06-20
1291
Stuart Hutchison
F1 Rocket Sport Wing VH-FLY
06-20
2984
Bob Orre
RV-10
06-19
201
Bob Thorne
S-20 Raven
06-19
1263
Bow Casper
S-20 Super Raven
06-19
366
Gordon Porter
Lancair Super ES
06-19
3586
Joe Hopwood
Zodiac 601 XLB
06-19
1715
John Peck
C120
06-19
330
Peter McBain
RV-9A
06-19
215
Bob Corriveau
RV-8
06-18
525
John Steere
Panther
06-18
1952
Scot Terry
RV- 7A
06-18
1223
Anthony Johnston
RV-7
06-17
49
Dave Berenholtz
Long-EZ
06-17
6156

Projects Uploaded: 1339
Logs Uploaded: 223354








Copyright © 2001-2017 Matronics. All Rights Reserved. Privacy Policy.