Previous Builder
Next Builder
Date: 10-29-2015
|
Number of Hours: 3.50
|
Short Description: Riveting the HS Part 1
|
Riveted the rear spar. The Big Squeeze handled these larger rivets with ease. Having the extra set of hands was also very helpful. Thanks Colin! For the hinge bracket/self locking hardware, used the torque wrench to achieve the prescribed 28 in-lbs.
Colin w/ Big Squeeze
|
Rear Spar Factory Side
|
Shop Side
|
Previous Builder
Next Builder
|