Home
Builder Search
Builder Login
KitLog.com    

RECENT ACTIVITY

Previous Builder          Next Builder

Builder:
  Eric Marenyi
Location:
  Richlands, NC - USA
Aircraft:
  Sonex
Total Build Hours:
  937
Web Site:
  http://www.mykitlog.com/Sonex825/

Date:  03-22-2013
Number of Hours:  15.00
Short Description:  936.5 total hours to date - Wing install and adjus

This captures the time it took to get the wings installed, adjust the flaps and ailerons, change out a bad tire tube, adjust the aeroinjector and make final adjustments for flight which should be tomorrow.










Previous Builder          Next Builder




 Recent Builder Activity
Builder Project Date Hours
Chris Moon
RV-14A
09-28
874
Craig Reding
RV-8
09-28
1039
daniel budde
RV-12
09-28
1168
David White
RV-7
09-28
295
Douglas Kupersmith
Zodiac 650 B
09-28
938
G.H. "Steve Riffe
RV8
09-28
2350
John Steere
Panther
09-28
1434
Nathan Mullins
Long Ez
09-28
4436
Norris Brown
RV14a
09-28
2278
Peter Calley
Sling4
09-28
1116
Robert Lussow
RV-10
09-28
1320
Brett Holland
SS7
09-27
372
Christian Schaerer
RV-8
09-27
209
Darren Crompton
Legal Eagle
09-27
364
Donald Schwanke
AF 1
09-27
212
Jeffrey Hartog
Aircam
09-27
320
Jerald L. Folkerts
Super Rebel 2500
09-27
2848
David Macdonald
RV-10
09-26
566
Des Howson
Sling 2 Taildragger
09-26
1120
Paul Bonorden
RV-6A
09-26
943
Steve Shae
S-20 Raven
09-26
758
steven pofahl
RV9A
09-26
117
Dave Berenholtz
Long-EZ
09-25
5533
ED GRASSO
TD
09-25
109
James Chadwick
RV-7
09-25
359
Mark Jackson
RV-8
09-25
787
Peter McBain
RV-9A
09-25
Semih Oksay
Pietenpol Air Camper
09-25
785
Chris Cook
RV-8
09-24
1658
Dave Conwell
Sonex Aerovee Tri-gear
09-24
792

Projects Uploaded: 1292
Logs Uploaded: 211872








Copyright © 2001-2016 Matronics. All Rights Reserved. Privacy Policy.