Date:  08-04-2015
Number of Hours:  2.00
Short Description:  Glove Box

Not much progress as I'm re-engining my other aircraft, a Cygnet. But, I took some time and fiddled with the glove box again. I had to cut of the upper back right corner to make it fit with the curve of the forward fuselage (yes! there are curves on a Murphy airplane). I did it with a dremel cut off wheel, and then fashioned a plate to rivet over it. I then made and riveted two flanges for the forward sides, to hold them in place. So, glove box complete except for door.
Previous Builder          Next Builder




 Recent Builder Activity
Builder Project Date Hours
Bill Vinson
RV-7
09-01
1592
Dennis Spender
RV-10
09-01
1138
Douglas Kupersmith
Zodiac 650 B
09-01
772
G.H. "Steve Riffe
RV8
09-01
1672
James Anderson
ES
09-01
1488
John Steere
Panther
09-01
649
Nathan Mullins
Long Ez
09-01
3785
Neil Rosoff
RV9A
09-01
1365
Paul Bonorden
RV-6A
09-01
538
Bill Harrelson
S6-S
08-31
1228
David Lewis
RV10
08-31
68
Derrick Aubuchon
Searey
08-31
Donald Schwanke
AF 1
08-31
212
Gregg Brightwell
RV-4
08-31
596
Matthew Healy
RV-10
08-31
466
Mike Hardison
RV-7
08-31
772
Norris Brown
RV14a
08-31
1067
Pete Britton
RV-8
08-31
2342
Peter Ellis
Tri Gear
08-31
1186
Richard Young
Sonex
08-31
277
Steve Shae
S-20 Raven
08-31
158
Thomas Swartwood
Rebel
08-31
1220
Wayne Ristine
S-7S
08-31
503
Benjain Fangmeier
CH-701SP
08-30
171
Brad Rock
Bearhawk
08-30
534
Christopher Pryce
KR2S
08-30
377
Dave Berenholtz
Long-EZ
08-30
4534
George Thompson
CH750
08-30
204
Jim Novak
RV-8
08-30
1096
John D Hazen
RV-12
08-30
507

Projects Uploaded: 1220
Logs Uploaded: 193800








Copyright © 2001-2015 Matronics. All Rights Reserved. Privacy Policy.