Powered By Kitlog Pro v2.0
Wendells RV-6A
Builder:
Wendell Engelien
Location:
Jacksonville, FL - USA
Aircraft:
Vans - RV-6A
Manufacturer:
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
2437 Hours
Welcome to my Experimental Aircraft Web Site.
Recent Activity
Date
Hours
Work Log Summary
Details
06-13-2025
2.0
Install 4 Mating Screws Btw Top And Bottom Cowl
Details
06-12-2025
1.0
Install Wing To Fuselage Fairings
Details
06-07-2025
2.0
Center Tunnel Covers
Details
06-04-2025
2.0
Bragg Avionics Did IFR Check And GTN Update
Details
05-20-2025
2.0
Applied Labels To Panel And Wings
Details
05-15-2025
3.0
Determined Empty Weight And CG
Details
05-14-2025
2.0
Finished The Fairing
Details
05-13-2025
1.0
Fitted Weatherstrip To Canopy Bottom.
Details
05-09-2025
2.0
Fix Spinner Screw Interference With Cowl
Details
05-06-2025
8.0
Make The Canopy Fairing
Details
SITE NAVIGATION
Contact Builder
RV-6A Home
Category
# Logs
# Hours
All
740
2440
Ailerons
22
72
Avionics
35
156
Canopy
66
201
Controls
24
82
Cowling
22
96
Electrical
44
183
Empennage
30
115
Engine
70
184
Firewall
11
32
Flaps
33
125
Fuselage
147
510
Gear
15
57
Miscellaneous
4
13
Move the Kit to FL
3
4
Panel
30
88
Prop
6
12
Smoke
7
14
Tools
3
5
Vans Training Kit
6
9
Videos
2
Wings
160
482
Copyright © 2001-2025 Matronics. All Rights Reserved.