KitLog pro

Powered By Kitlog Pro v2.0

Nate's RV-7 Site

Builder:
Nathaniel Jackson
Location:
Boston, Massachusetts - United States
Aircraft:
Vans Aircraft - RV-7
Manufacturer:   
http://www.vansaircraft.com/
Engine:
Lycoming - XIO-360
Prop:
Catto or Sensinich - 3 - Bladed - Constant Pitch
Total Build Time:
589 Hours

Welcome to my Experimental Aircraft Web site. I am working on building a Vans RV-7 that I am planning on building as a Trail-dragger, that will utilize a slider canopy. I plan on installing a 180hp Lycoming XIO-360, with a 2 or 3 blade fixed pitch propellor. For avionics I plan a single screen IFR setup up with a backup ADI, and single navigation radio. Finally I plan to include an autopilot for longer flights.

Recent Activity
 Date Hours Work Log Summary Details
 11-06-2020
4.5
Fuel Tank Sealing And Riveting, Day 9
Details
       

 11-05-2020
2.0
Left Fuel Tank Sealing, Day 8
Details
     

 11-05-2020
3.0
Left Aileron Match Drilling
Details
       

 11-04-2020
4.0
Right And Left Aileron Work
Details
       

 11-04-2020
4.0
Fuel Tank Riveting, Day 7
Details
     

 10-31-2020
1.0
Aileron Spar Riveting (Right)
Details
     

 10-30-2020
4.0
Fuel Tank Sealing, Day 6
Details
     

 10-29-2020
1.0
Priming Left Wing Spar
Details
       

 10-29-2020
3.5
Fuel Tank Sealing, Day 5
Details
     

 10-28-2020
5.0
Aileron Riveting And Priming
Details
       










Copyright © 2001-2020 Matronics. All Rights Reserved.