KitLog pro

Powered By Kitlog Pro v2.0

Karstens RV-6 Website

Builder:
Karsten Lorenz
Location:
Maulburg, BW - Germany
Aircraft:
Vans Aircraft - RV-6
Manufacturer:   
http://www.vansaircraft.com/
Engine:
Lycoming - O-360 A3A
Prop:
Catto - 3-Blade - Constant Pitch
Total Build Time:
639 Hours

Welcome to my RV-6 kit building Web site.
I live in Germany, so the descriptions of the steps are written in German. This Log is also my documentation for the German authorities.


Recent Activity
 Date Hours Work Log Summary Details
 10-16-2014
2.0
Tankaufbau
Details
     

 10-15-2014
2.0
Tankrippen rechter Tank
Details
       

 10-13-2014
1.0
Zündkerzenhalter
Details
       

 10-10-2014
4.0
AArrgh...Tank zerlegt
Details
     

 10-07-2014
2.0
Benzinleitung
Details
       

 10-06-2014
4.0
Konsole Bowdenzüge
Details
       

 09-24-2014
7.0
Abdeckbleche Boden/Heizung
Details
     

 09-16-2014
6.0
Konsolen und Benzinpumpe
Details
       

 09-15-2014
4.0
Relais, Gascolator
Details
       

 09-11-2014
4.0
Batteriekasten
Details
       










Copyright © 2001-2014 Matronics. All Rights Reserved.