KitLog pro

Powered By Kitlog Pro v2.0

EAA279 Sonex Project

Builder:
Tom Hassie
Location:
Hanson, MA - US
Aircraft:
Sonex - Sonex
Manufacturer:   
http://www.sonexaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
678 Hours

Welcome to the EAA 279 Sonex Project web site.

Recent Activity
 Date Hours Work Log Summary Details
 01-10-2018
3.0
Removed The Fuel Tank And Finished Up Odd Jobs.

 01-03-2018
3.0
Disassemble The Motor
       

 12-20-2017
3.0
Dual Control Stick Fitting And Firewall Top.

 12-13-2017
3.0
Seatbelts And Securing The Fuel Tank

 12-06-2017
3.0
Seat Belt Anchors, And Started To Fit The Fuel Tan
       

 11-29-2017
4.0
Holes Drilled And Work On Wing Box

 11-15-2017
3.0
Drilled The Holes For Wing Attachment. Phew!

 11-08-2017
3.0
Continued Messing With Levels And Lasers.

 11-01-2017
3.0
More Analyzing The Placement Of The Wings

 10-25-2017
3.0
Just Studying How We Position The Wings Before Dri
       










Copyright © 2001-2018 Matronics. All Rights Reserved.