KitLog pro

Powered By Kitlog Pro v2.0

My Airplane Projects

Builder:
John Peck
Location:
Gloversville, NY - USA
Aircraft:
Van's Aircraft - RV-12
Manufacturer:   
http://www.vansaircraft.com/
Engine:
Rotax - 912ULS
Prop:
Sensenich - Ground adjustable - Fixed

Welcome to my aircraft project website. My first project, a Van's RV-12, has been completed, at least as much as any homebuilt is ever really "done." I started it in December 2008. There were many factors that affected my decision to go for the RV-12, but a major one was ease of construction - something I could finish in a reasonable period of time.

My '12 was built as a E-LSA, which means it has to conform in every respect to the factory prototype. This LSA is my hedge against the day I decide not to go through the hassles associated with maintaining my medical. Hoping to fly when I'm 100!



Recent Activity
First Photo
Date

Work Log Summary

02-26-2012
Completed paperwork, fueled.
02-24-2012
Installed firewall shield, completed inspection.

02-17-2012
Finished interior kit.
Baggage area.
02-16-2012
Installed lower cowl, started interior kit.
Filler pipe with nutplates.
02-15-2012
Continued reassembly.
Tank and aft bulkhead w/ mods.
02-14-2012
Worked on inspection.
Balloon test after mods.
02-13-2012
Finished mods, began inspection.
02-11-2012
Finished access panels, painted.
Laying out access panel cut.
02-10-2012
Made access panel mods.
02-09-2012
Finished tank mod, updated avionics.
Tank disassembled and drilled.
02-08-2012
Worked on mods.
Tank out, tail cone exposed.
02-07-2012
More mods & upgrades.
Set up in hangar for inspection.
02-06-2012
Began inspection & modifications.
Original and McFarlane throttle  springs.
12-09-2011
Installed replacement throttle springs.
Set up for display, with new info sign.
09-18-2011
Best Homebuilt, Simsbury Fly-in!
Rob reinstalls the wedge.
09-14-2011
Finished cosmetics, waxed.
Scarfed up wing slot.
09-10-2011
Enlarged spar slots, painted plexiglass backside.
Paint behind canopy arms.
09-05-2011
Cosmetic touch-ups.
Baggage strapped down.
06-25-2011
Installed baggage area tie-down strap.
Old and new taped on.
06-16-2011
Installed the new N numbers.

06-14-2011
Installed placards

06-06-2011
Installed sunshade.
Dave flying lead.
06-04-2011
More tweaks, 25 hour inspection.
05-20-2011
Tested prop balance
05-18-2011
Installed cowl.











Copyright © 2001-2012 Matronics. All Rights Reserved.