KitLog pro

Powered By Kitlog Pro v2.0

ANDREY'S WEB SITE

Builder:
Andrey Piskarev
Location:
Fuquay-Varina, NC - U.S.A.
Aircraft:
Just Aircraft - Highlander
Engine:
-
Prop:
-
Total Build Time:
234 Hours

Welcome to my Experimental Aircraft Web Site.

Recent Activity
 Date Hours Work Log Summary Details
 07-16-2018
2.5
Working On Wings Trailing Edges.
Details

 07-14-2018
7.3
Worked On Left Fuel Tank Bracket And Wing Trailing
Details
       

 07-13-2018
7.5
Uel Tank, Flaps, Ailerons.
Details
       

 07-12-2018
2.0
Reaming Wings Attaching Holes.
Details
       

 07-12-2018
4.0
Countersink Trailing Edges, Checking Wings For Twi
Details
       

 07-11-2018
3.5
Fitting The Trailing Edge On The Left Wing.
Details
       

 07-10-2018
5.3
Working With Fuel Tanks And Left Wing.
Details
       

 07-09-2018
5.0
Working With Fuel Tanks.
Details
     

 07-08-2018
1.3
Installing The New Right Fuel Tank Bracket.
Details

 07-07-2018
1.3
Installing The Left Wing.
Details
       










Copyright © 2001-2018 Matronics. All Rights Reserved.